Data Center News

Read Avax One Targets 10MW Behind-the-Meter Data Center in Alberta
Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

Avax One Targets 10MW Behind-the-Meter Data Center in Alberta

April 11, 2026 Alberta

Cryptocurrency firm Avax One Technology has signed a front-end engineering and design (FEED) proposal for a 10MW off-grid, natural gas-powered AI and high-performance computing (HPC) data center at the 4-31 Battery site in Alberta, Canada. The FEED study will be led by BlueFlare Energy Solutions...

Read more

Ready to Level up Your
Data Center Strategy?