Published in United States

Aon Expands Data Center Insurance Capacity to $3.5bn

Apr 21, 2026 | Posted by Abdul-Rahman Oladimeji

Insurance firm Aon has expanded the level of coverage it can provide for data center projects. The company first launched its Data Center Lifecycle Insurance Program (DCLP) last year. The multi-line facility spans construction, cargo, cyber, and operational risk under a single program, and is designed to help clients manage exposures across the full lifecycle of data center development and operations.

The DCLP initially provided up to $1.5 billion in coverage for construction risks, delay in start-up, and operational property damage or business interruption. Aon is now increasing total program capacity to $3.5 billion and expanding coverage to include existing data centers transitioning out of their first year of operations. The insurer said the expansion reflects “accelerating global investment” in the data center sector and the “growing importance of resilience” as facilities become larger, more capital-intensive, and increasingly critical to the global economy.

“Data centers have become foundational to innovation, connectivity, and economic growth,” said Joe Peiser, CEO of risk capital at Aon. “As these assets grow in size, complexity, and importance, resilience must be built from the start. By expanding our Data Center Lifecycle Insurance Program and extending coverage to operating data centers, Aon is helping clients anticipate risk, protect critical assets, and invest in digital infrastructure with greater confidence.”

The DCLP also includes up to $400 million in coverage for cyber attacks during construction as well as technology errors and omissions. In addition, it provides up to $500 million for cargo and transport insurance, and up to $200 million for third-party liability (excluding US exposure). Aon is among several insurers that have introduced data center-specific products over the past 18 months. Last year, Marsh launched a new insurance offering covering risks associated with data center construction, while Lockton introduced a data center SLA insurance product.

There are 4633 data centers in United States.

Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Rendering of Beale Infrastructure's Project Atlas in Oklahoma
Posted in Beale: Project Atlas Source: Beale Infrastructure

Ready to Level up Your
Data Center Strategy?