Published in United States

Allied Energy Corp signs with Enerhash USA for flare gas crypto mines

Feb 20, 2023 | Posted by MadalineDunn

Allied Energy has announced it has signed a definitive agreement with Enerhash USA and River Energy Group through which it will develop flare gas-powered crypto mines. According to the company, the first part of the project will be carried out at Allied's Thiel Well in Texas, which will be a base model for the 20MW flare-gas project across Texas. The company has outlined that the first phase will include a 1MW site, which is set to grow to 3MW by the end of the year. 

Further, the company outlined that the recently signed MoU is based on the  Memorandum of Understanding (MoU) the two had previously signed to work together on the feasibility of developing solutions for stranded and flare gas resources to power Bitcoin mines and High-Performance Computing (HPC) data centers.

"We could not be more excited to grow this relationship with Enerhash as they are a proven global leader in this industry. We are extremely confident that we have the right partners to succeed in this sector and bring value to our shareholders," said Allied CEO George Monteith.

"Our shared goal is to have the Thiel Well site operational by late Q1 or early Q2 of this year and then expand based on what we learn from our experiences and data collection. As stated previously, this 1MW project is the first phase of a 20MW development project. This is the goal that all parties are committed to achieving."

When it comes to flare gas crypto mines, there are a lot of critics, who argue that it is a way of facilitating further fossil fuel profitability. Further, climate experts argue that this repurposing of waste gas is not a solution, but part of the problem. 

There are 4650 data centers in United States.

Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Rendering of Beale Infrastructure's Project Atlas in Oklahoma
Posted in Beale: Project Atlas Source: Beale Infrastructure

Ready to Level up Your
Data Center Strategy?