Published in Malaysia

AIMS DC commences work on second building Cyberjaya, Malaysia

May 09, 2023 | Posted by MadalineDunn

AIMS Group has announced plans to build a second data center in Cyberjaya to meet data center demand in Malaysia. Work on AIMS Cyberjaya Block 2 is set to be complete by the end of the year, and offer a total IT load of 8MW.

AIMS chief executive officer Chiew Kok Hin shared that 90% occupancy in AIMS Cyberjaya Block 1 in less than a year. The company will reportedly collaborate with Gamuda Engineering Sdn Bhd, a wholly-owned subsidiary of Gamuda Bhd, for the construction.

AIMS Group


"This has accelerated our plans to expand our operational facilities in Malaysia with the construction of Block 2 to not only meet overwhelming response in the region, but also aligns with our initiative towards driving environmental, social and governance practices within the company and facilitating innovation in the industry," added the CEO. 

Gamuda Engineering's "Next-Gen Digital IBS" solution will be used in the construction. Speaking about this, executive director Lim Hui Yan "Our Gamuda Next-Gen Digital IBS is a sustainable construction innovation that enables fast-tracked delivery and increased certainty for our business partners, leveraging our digital construction ecosystem from cloud-based design to AI-IoT-enabled robotic manufacturing. We are excited to be part of AIMS' longer-term expansion plans."

There are 174 data centers in Malaysia.

Rendering of Empyrion Digital's Nusajaya MY1 Campus in Johor
Posted in Empyrion: Nusajaya Campus MY1 Source: Empyrion Digital
Rendering of Stack Infrastructure's JHB01 Campus in Johor
Posted in Stack: Johor JHB01 Source: STACK Infrastructure
Yondr's Johor Data Center in Malaysia
Posted in Yondr: Johor Source: Yondr
Rendering of BrightRay's Sedenak Tech Park Campus in Johor
Posted in BrightRay: Johor MY-01 Source: BrightRay
BrightRay's Sedenak Tech Park Campus under construction in Johor
Posted in BrightRay: MY-02 Source: BrightRay
Rendering of AirTrunk's JHB2 Data Center in Johor
Posted in AirTrunk: Johor JHB2 Source: AirTrunk
Rendering of GDS Kempas Tech Park in Kempas Lama, Johor
Posted in DayOne: Kempas Tech Park Source: Aplus
Rendering of AirTrunk JHB1 Data Center in Johor, Malaysia
Posted in AirTrunk Johor Bahru JHB1 Source: AirTrunk
Johor Menteri Besar Datuk Onn Hafiz Ghazi (third from left) and YTL Power international Bhd's managing director Datuk Yeoh Seok Hong (fourth from left) looking at the scale model of the RM15 billion YTL Green Data Centre Park
Posted in YTL Johor Source: YTL Power
Rendering
Posted in YTL Johor |
Front Gate
Posted in Bridge Kidex Sedenak MY06-01 |
Exterior gate
Posted in Keppel DC: Johor Sedenak 1 |
Basis Bay Data Centre built in 2009
Posted in Keppel Cyberjaya Basis Bay DC |
Aerial rendering
Posted in Bridge Kidex Sedenak MY06-01 |
CJ1 data centre
Posted in Vantage Cyberjaya KUL11 |
CBJ5 when completed in 2021
Posted in NTT Cyberjaya CBJ5 |
TM's VADS CyberJaya facility
Posted in Cyberjaya Klang Valley (KVDC) |
Rendering of the Klang Valley Core DC
Posted in Cyberjaya Klang Valley (KVDC) |
Aerial photo of the Iskandar Puteri facility
Posted in Iskandar Puteri Core Data Centre (IPDC) |
Glass Facade of the VADS Johr data center
Posted in Iskandar Puteri Core Data Centre (IPDC) |
Grand opening of the KVDC in 2019
Posted in Cyberjaya Klang Valley (KVDC) |
Meeting room is available next to the staging area.
Customer Meeting Room
Posted in NTT Cyberjaya 4 Source: NTT

Designated staging area is available for customer use.
Staging Area
Posted in NTT Cyberjaya 4 Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Posted in NTT Cyberjaya 4 Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Posted in NTT Cyberjaya 4 Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Posted in NTT Cyberjaya 4 Source: NTT
Location Total SqFt Gross SqFt Power (MW)
Open DC: PE2 110,000 SqFt
NN
AIMS Suntech @ Penang Cybercity 10,764 SqFt
VADS Ipoh 1,972 SqFt
NN
Open DC: Penang PE1 1,000 SqFt
NN
Kuala Terengganu Service Centre

Ready to Level up Your
Data Center Strategy?