Trentino-Alto Adige is a small Alpine market anchored by a data centre built inside a working mine. Hydropower and natural cooling draw interest, while a thin pipeline and drought-hit hydro output limit growth. Read More

Market Facts

Trentino-Alto Adige Data Center Map

Trentino-Alto Adige Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Trentino-Alto Adige

Trentino DataMine
Site
Power
Operational
1
0.8
Construction
0
Planned
0
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Trentino-Alto Adige

Location About Total SqFt Power (MW)
Intacture Data Center
Trentino DataMine's Intacture data center sits inside the San Romedio dolomite mine in Predaia, i...
NN Request Dataset

About This Metro

Overview

Trentino-Alto Adige is an autonomous Alpine region made up of two autonomous provinces, Trento and Bolzano (South Tyrol). Its data centre market is small and young. The Intacture Data Center sits about 100 metres underground in Tassullo's active dolomite mine at Predaia, in the Val di Non. Work began in October 2024, and it opened on 23 June 2026.

The Market Today

Trentino DataMine runs Intacture. The University of Trento holds 49% of the company, and four Trentino firms hold the rest. The project cost over €50 million, including €18.4 million from Italy's national recovery plan. In Bolzano, STIX, the South Tyrolean Internet Exchange, connects local networks.

Advantages

  • Hydropower. Hydro plants supplied 85.8% of the region's electricity in 2024. The region generated 59% more power than it used in 2023.
  • Natural cooling. Intacture uses free cooling for about 75% of the year. Its cooling runs in a closed loop with no water consumption.

Challenges

  • Heat and drought. Record heat drained the north-east's reservoirs in 2026. Hydro output at Alperia, South Tyrol's main energy company, fell 32.5% in the first half of the year.
  • Thin pipeline. Data-centre grid requests in the region totalled about 0.1 GW in mid-2026. Neighbouring Lombardy had 48.6 GW by November.

Power and Policy

Terna runs the high-voltage grid, and SET Distribuzione and Edyna distribute power in Trento and Bolzano. Under Decree-Law 21/2026, a single authorisation covers a data centre and its grid connection, and regional authorities decide projects up to 300 MW.

Get Quotes

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.