Paderborn University: PC2 Building X

Latest Podcast Mersinweg 5
Under ConstructionOperationalPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

Paderborn University: PC2 Building X

Short Code: Building X
Site was first built in 2021 and has expansions through 2028
PUE: 1.13
Ownership: Paderborn University owns the building.
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Building X houses the national high-performance computing center run by the Paderborn Center for Parallel Computing (PC2), part of Germany's NHR network. It hosts the Noctua 2 and Otus supercomputers and cools them with warm-water direct liquid cooling. An extension now under way raises the building's power and cooling supply, and the state has funded a further expansion.

Site History

  • May 2026: The NRW science ministry committed EUR 36 million under the NRW-Plan to expand power and cooling again.
  • October 2025: The shell of the extension was completed.
  • April 2022: The Noctua 2 supercomputer was inaugurated.
  • November 2021: The building was handed over after two years of construction.

Map and Nearby Locations

Mersinweg 5
Paderborn University Sites
Nearby Facilities

Paderborn University: PC2 Building X Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Paderborn University: PC2 Building X

Distance Site About
2.20 miles VegaSystems: Paderborn
VegaSystems' Network Center Paderborn (NCPB), the hosting company's headquarters and data center, run on green power with waste-heat reuse.
5.16 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.82 miles esacom: Salzkotten
esacom's own data center at its Salzkotten headquarters, run largely on its own solar and battery power.
9.13 miles windCORES: Lichtenau Huser Klee (windCORES II)
windCORES II is a three-level data center inside the tower of a wind turbine in the Huser Klee wind farm at Lichtenau, near Paderborn.
18.42 miles Arvato Systems: Gütersloh DC3
Arvato Systems' newer data center on the Bertelsmann campus in Gütersloh, serving managed IT and cloud customers.
18.48 miles Arvato Systems: Gütersloh DC1
Arvato Systems' DC1 on the Bertelsmann campus in Gütersloh, one of two certified data centers it runs there for managed IT and cloud services.

Operating Company

Operated by:

Paderborn University is a public university of the state of North Rhine-Westphalia, founded in 1972. Its Paderborn Center for Parallel Computing (PC2) provides high-performance computing to researchers and houses its systems in a purpose-built data center building on campus that uses warm-water direct liquid cooling.

Paderborn University History:

  • In May 2026, the state of North Rhine-Westphalia committed EUR 36 million to expand power and cooling at the PC2 data center.
  • In October 2025, the shell of an extension to the PC2 data center was completed.
  • In April 2022, the Noctua 2 supercomputer was inaugurated.
  • In November 2021, PC2 took over its new HPC data center building after two years of construction.
  • Founded in 1972 in Paderborn.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.