E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastIn 2025, the UK renewable energy firm Energy OperatorInterested in this information?Contact us submitted proposals for a portfolio of ten data centre projects as part of NESO’s Gate 2 grid-connection queue process. The Thorpe Marsh project is proposed as a hybrid data centre co-located with a battery energy storage system (BESS). Expected grid connection dates across the portfolio were indicated as 2029–2032.
| Distance | Site | About |
|---|---|---|
| NN milesInterested in this information?Contact us | Center PrimeInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| NN milesInterested in this information?Contact us | Pulsant: Rotherham YH-1 |
|
| NN milesInterested in this information?Contact us | Drax: Selby 1 |
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
|
| NN milesInterested in this information?Contact us | Drax: Selby Expansion |
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
|
| NN milesInterested in this information?Contact us | Parseq: Rotherham | |
| NN milesInterested in this information?Contact us | nLighten Leeds (Wakefield) |
|
| NN milesInterested in this information?Contact us | Node4: Leeds |
|
| NN milesInterested in this information?Contact us | Rivington Energy: Conesby 2 |
This facility is part of Rivington Energy's Conesby Data Centre Campus in Lincolnshire, UK.
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast