HKEX Data Center Photos

HKEX Data Center Data Center Photos


The Battery Room is physically separated from the rest of the data centre.
Chief Executive of the Hong Kong Special Administrative Region C Y Leung (third from left) visits the Operation Control Centre of HKEx’s new Data Centre with HKEx Chairman C K Chow (second from lef...
HKEx Hosting Services occupies two dedicated floors that can support up to 1,200 racks
Cold aisle containment inside the data hall helps to reduce energy use in the cooling system

The Battery Room is physically separated from the rest of the data centre.
Battery Room

The Battery Room is physically separated from the rest of the data centre.

Source: HKEX
HKEX DC
Source: HKEX
Chief Executive of the Hong Kong Special Administrative Region C Y Leung (third from left) visits the Operation Control Centre of HKEx’s new Data Centre with HKEx Chairman C K Chow (second from lef...
Operation Control Centre Tour

Chief Executive of the Hong Kong Special Administrative Region C Y Leung (third from left) visits the Operation Control Centre of HKEx’s new Data Centre with HKEx Chairman C K Chow (second from left), HKEx Chief Executive Charles Li (second from right) and Co-heads of IT Bill Chow (right) and Richard Leung (left).

Source: HKEX
Central Control Room
Source: HKEX
Lobby and Conference Room
Source: HKEX
HKEx Hosting Services occupies two dedicated floors that can support up to 1,200 racks
Computer Room

HKEx Hosting Services occupies two dedicated floors that can support up to 1,200 racks

Source: HKEX
Cold aisle containment inside the data hall helps to reduce energy use in the cooling system
Cold Aisle Containment

Cold aisle containment inside the data hall helps to reduce energy use in the cooling system

Source: HKEX
Fiber is Run to Each Cabinet
Source: HKEX
Backup Generators
Source: HKEX
UPS Room
Source: HKEX