Central Ostrobothnia Data Center Market

Latest Podcast
Central Ostrobothnia, in western Finland, is an early data center market built on wind power and new 400 kV grid lines. Its projects in Toholampi, Halsua and Perho are still in zoning or permitting. Read More

Market Facts

Central Ostrobothnia Data Center Map

Central Ostrobothnia Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Central Ostrobothnia

Greensky Group Oy
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
2
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider
Fu-Gen
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider
Tekova
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Central Ostrobothnia

Location About Total SqFt Power (MW)
Greensky: Halsua
Greensky is developing a data center area of about 185 hectares along Lestijärventie in Halsua, n...
Greensky: Toholampi (Kiertokangas)
Greensky is developing a data center site of about 80 hectares at Kiertokangas in Toholampi, next...
Fu-Gen: Toholampi (Marjokangas)
Fu-Gen is developing a data center with battery storage on about 47 hectares at Marjokangas, nort...
Tekova: Perho
Tekova is developing a data center on plots of about 4 hectares in the Isokangas industrial area ...

About This Metro

Overview

Central Ostrobothnia lies inland from the Gulf of Bothnia in western Finland, with Kokkola as its regional center. It has no operating data centers. Developers come for the region's wind farms, including the 455 MW Lestijärvi wind farm, the largest built in Finland, and for Fingrid's new 400 kV lines.

The Market Today

Four projects sit in zoning or permitting. Greensky plans a large data center area along Lestijärventie in Halsua, near Fingrid's Laurinneva substation, and a second site at Kiertokangas in Toholampi. Fu-Gen plans a data center with battery storage at Marjokangas, also in Toholampi. Tekova is the furthest along: it applied for a building permit in Perho's Isokangas industrial area in October 2026.

Advantages

  • Wind power. The Ostrobothnia regions hold about three quarters of Finland's wind capacity.
  • New transmission. Fingrid's Lakeuslinja 400 kV project adds grid capacity through the region.

Challenges

  • Line permits. Several Lakeuslinja sections still wait for redemption permits or a Natura assessment.
  • Early pipeline. Every project is still in zoning or permitting.

Power and Policy

Fingrid connects large loads at 400 kV, with new substations planned at Laurinneva and Ullava. Herrfors runs a 110 kV line past the Marjokangas site. The Toholampi and Halsua boards accepted zoning initiatives during 2026.

Get Quotes

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.