E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026
Eric Bell
World
An Israeli-backed consortium operating as Albania Data Center (ADC) is investing approximately €100 million ($118 million) to build a new data center within the TEDA Tirana free economic zone in Albania.
Located northwest of the capital, the initial 4.5-acre campus is designed for large-scale power capacity with the potential to expand up to threefold. Backed by Israel-affiliated Happy Technologies and DIT, the facility has already secured space for local tech firm Infosoft, a German storage company, and an undisclosed Albanian government client.
| Distance | Site | About |
|---|---|---|
| 2.82 miles | RASH - ANIX |
The Albania Data Center (ADC) is a €100 million, 32MW-to-100MW campus in Tirana’s TEDA Special Economic Zone, serving as the digital gateway to the Western Balkans. Backed by the EBRD, Happy Technologies, and DIT, the facility features an AI-ready architecture optimized for high-density Nvidia GPU workloads. To bypass European power constraints and meet carbon-neutral mandates, the campus runs entirely on local hydroelectric energy, utilizing regional fiber networks to deliver ultra-low latency connectivity across Central Europe and the Adriatic.
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas