Data Center Campus

Start: SINES Data Campus

6 sites Portugal
OperationalPlannedUnder Construction
Operational facility with ongoing expansion and future phases planned
Operated by:

Campus at a Glance

6 data centers on this campus
First built in 2025 with expansions through 2030
Total building size: 193,750 SqFt
Coordinates: 37.93492, -8.81211
░░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The Sines 4.0 project is a hyperscale data center campus in the Sines Industrial and Logistics Zone (ZILS), adjacent to the Thermoelectric Power Station. Set to be one of Europe's largest data center campuses, it will comprise a total of 9 buildings upon completion. The first building, NEST-New & Emerging Sustainable Technologies, was successfully developed in 2024, marking the project's initial phase.

  • Engexpor was entrusted with the construction of this first building. The remaining eight buildings are scheduled to be developed by 2028.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Start Campus: Sines DC1 Start Campus
OperationalPlanned
░░░░ Request Dataset MW 193,750 SqFt 2025
Start Campus: Sines DC2 Start Campus
Under Construction
— — 2027
Start Campus: Sines DC3 Start Campus
Planned
— — 2028
Start Campus: Sines DC4 Start Campus
Planned
— — 2028
Start Campus: Sines DC5 Start Campus
Planned
— — 2029
Start Campus: Sines DC6 Start Campus
Planned
— — 2030

Map and Nearby Locations

Start: SINES Data Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Fully powered by renewable and affordable energy, START Campus offers 100% sustainable facilities. The strategic locations are fully powered by renewable and cost-efficient energy, providing a state-of-the-art ecosystem. The facilities have a low TCO thanks to the use of seawater and repurposed LNG waste-water for cooling, solar/wind power generation, and its location on a repurposed power/industrial area