Build to Suite
Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.
The campus has been a semiconductor and manufacturing hub.
The campus features 90MW of gross utility power today, 58MW of which is allocated to a 270k former chip fabrication building which will be repurposed to a state-of-the-art data center. This building can be energized as early as Q3 2026.
The campus features a will serve letter for an additional 150MW, to be delivered by Central Hudson and a path to an incremental 150-300MW, given the site’s strategic location along ConEdison 345kV transmission. The ISO study for 150mW from Central Hudson is underway
This listing's details are confidential
Contact Us to Learn More