Austin: 20MW to 200 MW

Powered Land
Powered Shell
Turnkey Data Center
For Lease

Power & Utilities

Power Availability

Planned
200 MW

Power Ramp Timeline 200 MW Total

Key Facts

Property Types
Powered Land, Powered Shell, Turnkey Data Center
Available Power
180 MW
Power Cost
$0.08/kWh

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Property Description

Facility:

  • Multi-tenant or dedicated campus capable of modernization of existing Research and Development (R&D) buildings, greenfield new building development, and/or utilization of Class A office and amenities space
    • 120+ acres of gross land site
    • 100,000 sqft potential across all buildings onsite
  • Zoned and entitled to support data center development
    • Includes a dedicated utility substation and existing onsite cogeneration plant capable of expansion to support hundreds of MW of Behind-The-Meter (BTM) power generation capacity.
  • Segmented POD based buildouts are possible

Utility

  • 20MW Gross power available immediately
  • Pathway to 200MW+ by 2026/27
  • Current rate: ~0.07-0.08 cents /kwh

Power Distribution

  • 208v or 415v/480v
  • Hi-Density (130kW+ per rack) possible
    • Passive air and/or liquid cooling possible
Contact Us to learn more about this listing

This listing's details are confidential

Contact Us to Learn More

Site Details

Location
░░░░░░░░░░ Contact Us for exact location
Austin
Listing Code
Austin: 20MW to 200 MW
Last Updated
Jan 16, 2026

Ready to Level up Your
Data Center Strategy?