Atlanta 10 -> 50 MW
Atlanta 10 -> 50 MW

Atlanta 10 -> 50 MW

Turnkey Data Center
For Sale For Lease

Power & Utilities

Power Availability

Operational
10 MW
Planned
43 MW

Power Ramp Timeline 53 MW Total

Infrastructure Utilities

Electric Utility
Georgia Power Company (GPC)

Key Facts

Property Type
Turnkey Data Center
Land Size
░░░░░░░░░░░ Contact Us for exact acreage
Available Power
53 MW

Property Highlights

  • 88,000 square foot Tier III data center for lease. The property with 10 MW of power available in 2024 with the potential to be expanded to 53 MW of total power through Georgia Power.

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Property Description

Total Available Square Footage: 88,000 SF

Power

  • There are two (2) 19.8KV power feeds from Georgia Power on a switched configuration between each respective substation power the facility. The feeds are fully redundant as either feed can fully support the facility the 19.8KV redundant transformers step down to 13.2KV, providing 10MVA of usable power.
  • The electrical service to the site is via a primary 19.8KV feeder from Perimeter Center Substation. The secondary 19.8KV feeder is coming from their North Shallowford Substation.


Internal Cabling

  • Copper and Fiber access throughout via structured cabling infrastructure

Metro/Long Haul FIber Providers

  • Lumen
  • Fiberlight
  • LIT Networks
  • North Georgia Network
  • Sago
  • Crown Castle (Sunesys)
  • Tower Cloud
  • Unite Private Networks
  • Windstream
  • Verizon (XO)
  • Zayo

Physical Security

  • Man trap/card key access to enter building
  • Man trap is staffed 7/24/365 by uniformed security officer
  • Protected with crash rated security bollards
  • Security fence surrounding perimeter of building
  • CCTV monitoring and Recording NOC and Office Space Available
Contact Us to learn more about this listing

This listing's details are confidential

Contact Us to Learn More

Documents & Brochures

Lincoln_-_40_Perimeter_Center_-_Data_Center_Brochure__1_.pdf
6.29 MB

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Contact Us for exact location
Atlanta
Listing Code
Atlanta 10 -> 50 MW
Last Updated
Dec 28, 2025