Advancing Data Center Retrofits 2026


Atlanta, United States

Dec 01, 2026 - Dec 03, 2026

in 52 days


About the Event

Advancing Data Center Retrofits is a three-day conference convening facility owners, operators, design engineers, and contractors modernizing operational data centers to support high-density and AI workloads. Organised by Advancing Construction, a Hanson Wade Group division, the gathering takes place December 1-3, 2026, at the Hyatt Regency Atlanta. The event brings together over 80 retrofit specialists and 18 expert speakers, running alongside the co-located Advancing Data Center Construction East.

Programming Focus

  • Evaluating retrofit economics, available electrical headroom, and time to capacity against new-build development
  • Operational risk mitigation and maintenance of uninterrupted uptime during live cutovers and shutdowns
  • Power distribution and electrical topology upgrades to support high rack densities
  • Retrofitting legacy air cooling with direct-to-chip liquid cooling and customized fluid loops
  • Structural floor loading and roof capacity assessments for heavy compute and mechanical hardware
  • Verification of legacy site drawings through laser scanning and building information modeling

Featured Speakers

Operators and Hyperscalers:

  • Sushant Waidande, Retrofits Program Lead, Meta
  • Ashley Kangas, Director of Preconstruction, Microsoft
  • John Schaefer, Design & Construction MEP, Vantage Data Centers
  • Ahmed Anwar, Head of Construction, Prometheus Group

Advisory, Engineering, and Design:

  • Sean Farney, Vice President, Data Center Strategy, Jones Lang LaSalle
  • Duane Warren, Director of Engineering, Jones Lang LaSalle
  • James Carr, Chief Operating Officer, Data Center Solutions, CBRE Global Workplace Solutions
  • Aimee Lopez, Senior Global Program Manager, CBRE
  • Robert Hibbard, Director, Program, Black & Veatch
  • Bill Kosik, Mission Critical Sector Leader, HED
  • Undra Patrick, Vice President of Data Centers, Introba
  • David Eisenband, Senior Manager of Mission Critical, Ramboll
  • Spiros Liolis, Data Center Strategy, Ramboll
  • Treye Denton, Senior Project Architect of Mission Critical, The Lamar Johnson Collaborative
  • Venkatesh Thumala Janakiraman, Associate Principal Electrical Engineer of Mission Critical, The Lamar Johnson Collaborative
  • Aaron Morency, Project Manager, Engineering, Mesa Associates
  • Matthew Haight, Senior Vice President of Engineering, Saragon
  • Chris Heaslip, Head of PMO, PIC

Contractors:

  • Damean Hilty, Vice President of Mission Critical, Sargent Electric Company
  • Brad Mohler, Manager, Virtual Construction, ColonialWebb Contractors Company

Who Should Attend

  • Data center facilities and operations executives
  • Mission-critical retrofit and refurbishment project managers
  • Mechanical, electrical, and structural engineering consultants
  • General contractors and specialty MEP trade subcontractors
  • Real estate strategy and capacity planning executives

Logistics

  • Venue: Hyatt Regency Atlanta, 265 Peachtree Rd NE, Atlanta, GA 30303
  • Room block reservation: Hyatt Regency Atlanta group block available through November 9, 2026
  • Registration rates: Architecture, engineering, and contractor pass at $2,299 conference-only or $3,097 including pre-conference workshops before October 9, 2026; specialty contractors at $2,499 conference-only or $3,297 including workshops; complimentary passes for qualified data center operators, hyperscalers, colocators, and ENR Top 400 general contractors
  • Co-located event: Advancing Data Center Construction East 2026

Related on Baxtel

Ready to Level up Your
Data Center Strategy?