About the Event

Advancing Data Center Retrofits is a three-day conference convening facility owners, operators, design engineers, and contractors modernizing operational data centers to support high-density and AI workloads. Organised by Advancing Construction, a Hanson Wade Group division, the gathering takes place December 1-3, 2026, at the Hyatt Regency Atlanta. The event brings together over 80 retrofit specialists and 18 expert speakers, running alongside the co-located Advancing Data Center Construction East.

Programming Focus

  • Evaluating retrofit economics, available electrical headroom, and time to capacity against new-build development
  • Operational risk mitigation and maintenance of uninterrupted uptime during live cutovers and shutdowns
  • Power distribution and electrical topology upgrades to support high rack densities
  • Retrofitting legacy air cooling with direct-to-chip liquid cooling and customized fluid loops
  • Structural floor loading and roof capacity assessments for heavy compute and mechanical hardware
  • Verification of legacy site drawings through laser scanning and building information modeling

Featured Speakers

Operators and Hyperscalers:

  • Sushant Waidande, Retrofits Program Lead, Meta
  • Ashley Kangas, Director of Preconstruction, Microsoft
  • John Schaefer, Design & Construction MEP, Vantage Data Centers
  • Ahmed Anwar, Head of Construction, Prometheus Group

Advisory, Engineering, and Design:

  • Sean Farney, Vice President, Data Center Strategy, Jones Lang LaSalle
  • Duane Warren, Director of Engineering, Jones Lang LaSalle
  • James Carr, Chief Operating Officer, Data Center Solutions, CBRE Global Workplace Solutions
  • Aimee Lopez, Senior Global Program Manager, CBRE
  • Robert Hibbard, Director, Program, Black & Veatch
  • Bill Kosik, Mission Critical Sector Leader, HED
  • Undra Patrick, Vice President of Data Centers, Introba
  • David Eisenband, Senior Manager of Mission Critical, Ramboll
  • Spiros Liolis, Data Center Strategy, Ramboll
  • Treye Denton, Senior Project Architect of Mission Critical, The Lamar Johnson Collaborative
  • Venkatesh Thumala Janakiraman, Associate Principal Electrical Engineer of Mission Critical, The Lamar Johnson Collaborative
  • Aaron Morency, Project Manager, Engineering, Mesa Associates
  • Matthew Haight, Senior Vice President of Engineering, Saragon
  • Chris Heaslip, Head of PMO, PIC

Contractors:

  • Damean Hilty, Vice President of Mission Critical, Sargent Electric Company
  • Brad Mohler, Manager, Virtual Construction, ColonialWebb Contractors Company

Who Should Attend

  • Data center facilities and operations executives
  • Mission-critical retrofit and refurbishment project managers
  • Mechanical, electrical, and structural engineering consultants
  • General contractors and specialty MEP trade subcontractors
  • Real estate strategy and capacity planning executives

Logistics

  • Venue: Hyatt Regency Atlanta, 265 Peachtree Rd NE, Atlanta, GA 30303
  • Room block reservation: Hyatt Regency Atlanta group block available through November 9, 2026
  • Registration rates: Architecture, engineering, and contractor pass at $2,299 conference-only or $3,097 including pre-conference workshops before October 9, 2026; specialty contractors at $2,499 conference-only or $3,297 including workshops; complimentary passes for qualified data center operators, hyperscalers, colocators, and ENR Top 400 general contractors
  • Co-located event: Advancing Data Center Construction East 2026

Related on Baxtel

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.