0.06 miles
|
43881 Devin Shafron (Bldg B)
|
|
0.07 miles
|
43915 Devin Shafron (Bldg A)
|
|
0.17 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
0.17 miles
|
Amazon IAD-67
|
|
0.18 miles
|
43831 Devin Shafron (Bldg C)
|
|
0.19 miles
|
43830 Devin Shafron (Bldg F)
|
|
0.20 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
0.20 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
0.20 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
0.28 miles
|
43790 Devin Shafron (Bldg E)
|
|
0.29 miles
|
43791 Devin Shafron (Bldg D)
|
|
0.29 miles
|
Amazon IAD-54
|
|
0.45 miles
|
QTS Ashburn-Shellhorn
|
|
0.50 miles
|
QTS Ashburn-Shellhorn DC2
|
|
0.59 miles
|
Import Plz, Ashburn
|
|
0.71 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
0.76 miles
|
44351 Import Plz
|
|
0.80 miles
|
44372 Round Table: Digital Realty
|
|
0.86 miles
|
Equinix DC13
|
|
0.88 miles
|
Sabey Intergate.Ashburn (Building A)
|
Two of the three buildings on the Sabey Data Centers (SDC) Ashburn campus are completed. Sabey Data Centers was rolling with the next building (Building A) to come on their campus, a 54 MW facility, but that has been put on hold because of the Dominion situation.
|
0.88 miles
|
Sabey: Intergate.Ashburn (Building B)
|
|
0.89 miles
|
44274 Round Table (Bldg L)
|
|
0.96 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
0.97 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
0.97 miles
|
FastServ Ashburn
|
|
0.98 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
1.04 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
1.11 miles
|
DataBank Ashburn IAD3
|
|
1.17 miles
|
CloudHQ Ashburn Campus
|
|
1.21 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
1.21 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
1.25 miles
|
NTT VA5
|
|
1.26 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
1.29 miles
|
CloudHQ LC2
|
|
1.33 miles
|
44751 Round Table (Bldg P)
|
|
1.34 miles
|
NTT Ashburn Campus
|
|
1.36 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
1.38 miles
|
NTT VA4
|
|
1.40 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
1.46 miles
|
QTS Ashburn Lockridge
|
|
1.48 miles
|
Equinix Ashburn DC4
|
|
1.48 miles
|
Equinix Ashburn DC5
|
|
1.52 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.54 miles
|
Equinix Ashburn DC1
|
|
1.56 miles
|
Equinix Ashburn DC6
|
|
1.56 miles
|
Equinix Ashburn DC11
|
|
1.58 miles
|
Digital Realty: IAD43
|
|
1.59 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
1.59 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
1.60 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
1.61 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
1.61 miles
|
VPLS IAD
|
|
1.61 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
1.62 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
1.66 miles
|
Equinix DC21
|
|
1.66 miles
|
Rackspace Ashburn IAD3
|
|
1.66 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.72 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
1.73 miles
|
Digital Realty: Broderick Drive
|
|
1.78 miles
|
44490 Chilum Place: Digital Realty
|
|
1.78 miles
|
44470 Chillum - Digital Realty
|
|
1.79 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
1.80 miles
|
Amazon IAD76
|
|
1.80 miles
|
ServerCentral Ashburn DC3
|
|
1.80 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
1.83 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
1.85 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
1.89 miles
|
PowerHouse Pacific
|
|
1.92 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
1.93 miles
|
Lumen Ashburn
|
|
1.94 miles
|
Amazon IAD15
|
|
1.97 miles
|
Amazon IAD16
|
|
1.98 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
1.99 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
2.04 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
2.06 miles
|
Amazon IAD12
|
|
2.06 miles
|
PowerHouse ABX1
|
|
2.07 miles
|
NTT VA2
|
|
2.08 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
2.11 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
2.17 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
2.20 miles
|
Equinix DC15
|
|
2.24 miles
|
Amazon IAD71
|
|
2.27 miles
|
Vantage VA12
|
|
2.27 miles
|
Amazon IAD60
|
|
2.27 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
2.28 miles
|
Sentinel Ashburn
|
|
2.28 miles
|
Amazon IAD50
|
|
2.28 miles
|
Amazon IAD-88
|
|
2.30 miles
|
Vantage VA13
|
|
2.31 miles
|
Amazon 44862 Interconnection Plaza
|
|
2.31 miles
|
Amazon 45111 Loudoun Downs
|
|
2.36 miles
|
Amazon IAD-57
|
|
2.38 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
2.39 miles
|
Amazon 44858 Interconnection Plaza
|
|
2.40 miles
|
Vantage VA11
|
|
2.40 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
2.41 miles
|
Amazon IAD-58
|
|
2.45 miles
|
Amazon 44854 Interconnection
|
|
2.48 miles
|
21710 Charles View
|
|
2.49 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
2.49 miles
|
Amazon 22370 Kipper
|
|
2.53 miles
|
Amazon IAD-56
|
|
2.56 miles
|
Amazon 22420 Kipper
|
|
2.56 miles
|
Amazon IAD-51
|
|
2.57 miles
|
21641 Charles View
|
|
2.80 miles
|
Vantage VA2 Campus
|
|
2.84 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
2.85 miles
|
Amazon 45259 Severn
|
|
2.85 miles
|
Amazon 45305 Severn
|
|
2.88 miles
|
Amazon IAD32
|
|
2.92 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
2.97 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
2.99 miles
|
Amazon IAD10
|
|
3.02 miles
|
CyrusOne Northern Virginia Sterling V
|
|
3.23 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center with 400,000 square feet of raised white floor space, 50,000 square feet of office space, and 30,000 square feet for support services.
|
3.26 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
3.27 miles
|
AWS: 22945 International Dr
|
|
3.33 miles
|
Cyxtera IAD2-B
|
|
3.36 miles
|
Amazon IAD-175
|
|
3.36 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
3.36 miles
|
AWS: 22868 International Dr
|
|
3.66 miles
|
COPT: 45751 Maries Rd
|
|
3.70 miles
|
COPT: 45761 Maries Rd
|
|
3.75 miles
|
Amazon IAD140
|
|
3.76 miles
|
Amazon IAD-141
|
|
3.81 miles
|
AWS: 45950 Pathfinder Plz
|
|
3.88 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
3.90 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
3.90 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
3.93 miles
|
CyrusOne Sterling VIII
|
|
3.97 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
3.98 miles
|
AWS: 45930 Pathfinder Plz
|
|
3.99 miles
|
Cyxtera Sterling DC2
|
|
3.99 miles
|
45900 Pathfinder Plz
|
|
4.01 miles
|
Amazon IAD-69
|
|
4.06 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
4.08 miles
|
Cyxtera Sterling DC4
|
|
4.12 miles
|
Amazon Fadeley I
|
|
4.14 miles
|
Compass Loudoun County
|
|
4.23 miles
|
Amazon Fadeley III
|
|
4.24 miles
|
Amazon Fadeley II
|
|
4.59 miles
|
Google Dulles Arcola Center
|
|
4.72 miles
|
Google Leesburg Stonewall Park
|
|
4.82 miles
|
Google: Arcola 2
|
|
4.97 miles
|
PowerHouse Arcola
|
|
5.10 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
5.22 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
5.26 miles
|
Microsoft Aldie
|
Microsoft bought the vacant land at 41840 Growth Mindset Lane in Aldie (renamed from 24282 Quail Ridge Lane) in August 2020 for $93.7 million.
|
5.42 miles
|
Microsoft IAD11
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
5.48 miles
|
InfoRelay Herndon
|
|
5.54 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
5.54 miles
|
Amazon 41992 John Mosby Highway
|
|
5.58 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
5.76 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
5.81 miles
|
Amazon Prediction Lane
|
|
5.87 miles
|
Amazon IAD-63
|
|
5.87 miles
|
Amazon 25420 Sutton Bay
|
|
5.94 miles
|
Lumen Herndon 1
|
|
5.94 miles
|
Amazon 25410 Sutton Bay
|
|
5.95 miles
|
Lumen Herndon 3
|
|
6.00 miles
|
Amazon IAD61
|
|
6.03 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
6.11 miles
|
Cogent: 510 Huntmar
|
|
6.22 miles
|
Amazon 13600 EDS Drive
|
|
6.23 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
6.26 miles
|
Microsoft: Leesburg 2
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
6.28 miles
|
Equinix DC97
|
|
6.31 miles
|
Microsoft: Leesburg 3
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
6.33 miles
|
IBM Softlayer Chantilly WDC01
|
|
6.37 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
6.68 miles
|
Microsoft Leesburg 1B
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
6.68 miles
|
Microsoft Leesburg 1A
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
6.73 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
6.87 miles
|
Amazon: 14501 Avion Pkwy
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
6.92 miles
|
Amazon: 3980 Virginia Mallory Dr
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
6.98 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
7.10 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
7.23 miles
|
Amazon IAD9
|
|
7.24 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
7.24 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
7.33 miles
|
Amazon IAD22
|
|
7.35 miles
|
Amazon IAD1
|
|
8.18 miles
|
InfoRelay Reston
|
|
8.81 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
8.99 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
8.99 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
9.10 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
11.58 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
12.99 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
13.71 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
13.81 miles
|
Equinix Manassas DC14
|
|
13.93 miles
|
Equinix Vienna DC8
|
|
14.49 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
14.54 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
14.61 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
14.79 miles
|
Amazon 7500 Bethlehem
|
|
14.87 miles
|
Amazon IAD7
|
|
14.89 miles
|
Amazon IAD24
|
|
14.92 miles
|
Amazon IAD-59
|
|
14.94 miles
|
Corscale: Gainesville Crossing
|
|
14.94 miles
|
Amazon IAD11
|
|
14.98 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
14.99 miles
|
Amazon IAD-52
|
|
15.00 miles
|
Cogent Vienna
|
|
15.05 miles
|
8100 Boone - Digital Realty
|
|
15.07 miles
|
Amazon IAD14
|
|
15.38 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
15.42 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
15.47 miles
|
Equinix Vienna DC7
|
|
15.51 miles
|
Element Critical VA1
|
|
15.52 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
15.54 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
15.57 miles
|
Lumen McLean 1
|
|
15.62 miles
|
Amazon: 8190 Bethlehem
|
|
15.69 miles
|
Amazon IAD-55
|
|
15.70 miles
|
Amazon Bethlehem Technology Park DC20
|
|
15.71 miles
|
Amazon Bethlehem Technology Park DC19
|
|
15.72 miles
|
Amazon Bethlehem Technology Park DC18
|
|
15.74 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
15.77 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
15.77 miles
|
Amazon: 15455 John Marshall
|
|
15.84 miles
|
Amazon 15465 John Marshall
|
|
15.86 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
15.91 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
15.92 miles
|
Iron Mountain VA-2
|
|
15.96 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
16.01 miles
|
Amazon IAD-73
|
|
16.03 miles
|
Amazon IAD-74
|
|
16.04 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
16.09 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
16.11 miles
|
Opus Interactive Manassas
|
|
16.13 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
16.37 miles
|
Yondr Bristow Campus
|
|
16.70 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
16.73 miles
|
9020 Freedom Center
|
|
16.77 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
16.81 miles
|
9040 Freedom Center
|
|
16.94 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
17.17 miles
|
QTS Manassas DC1
|
|
17.22 miles
|
QTS Manassas DC5
|
|
17.33 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
17.42 miles
|
QTS 10680 University Blvd
|
QTS is looking to expand its existing footprint in Prince William County. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
17.62 miles
|
Amazon: IAD-104
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
17.65 miles
|
Amazon: IAD-105
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
17.72 miles
|
Amazon: IAD-106
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
17.72 miles
|
Amazon: 9740 Innovation Drive
|
Amazon is building another data center in it's Innovation Drive campus.
|
17.78 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
17.78 miles
|
Evoswitch USA WDC 1
|
|
17.78 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
17.78 miles
|
Amazon IAD-77
|
|
17.87 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
17.94 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
17.96 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
17.99 miles
|
Amazon: 11150 Thomasson Barn
|
|
18.01 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
18.02 miles
|
Amazon: 11200 Thomasson Barn
|
|
18.09 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
18.33 miles
|
AWS 10261 Tanner
|
|
18.43 miles
|
AWS IAD 101
|
|
18.46 miles
|
AWS 10281 Tanner Way
|
|
18.55 miles
|
AWS IAD 100
|
|
18.57 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
19.29 miles
|
CloudHQ MCC2
|
|
19.56 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
19.74 miles
|
CloudHQ MCC3
|
|