0.19 miles
|
21641 Charles View
|
|
0.38 miles
|
Amazon 45305 Severn
|
|
0.40 miles
|
Amazon 45259 Severn
|
|
0.47 miles
|
Amazon IAD32
|
|
0.55 miles
|
Amazon IAD10
|
|
0.63 miles
|
PowerHouse ABX1
|
|
0.66 miles
|
CyrusOne Northern Virginia Sterling V
|
|
0.66 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
0.71 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
0.72 miles
|
Equinix DC15
|
|
0.74 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
0.77 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
0.82 miles
|
Equinix DC21
|
|
0.84 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
0.88 miles
|
PowerHouse Pacific
|
|
0.89 miles
|
Amazon 44854 Interconnection
|
|
0.90 miles
|
Vantage VA13
|
|
0.91 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
0.92 miles
|
Amazon 44858 Interconnection Plaza
|
|
0.93 miles
|
Vantage VA11
|
|
0.94 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
0.94 miles
|
Digital Realty: Broderick Drive
|
|
0.96 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
0.96 miles
|
VPLS IAD
|
|
0.99 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
1.02 miles
|
Equinix Ashburn DC6
|
|
1.02 miles
|
Equinix Ashburn DC11
|
|
1.03 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
1.04 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
1.05 miles
|
Lumen Ashburn
|
|
1.05 miles
|
Amazon 44862 Interconnection Plaza
|
|
1.05 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
1.07 miles
|
Sentinel Ashburn
|
|
1.07 miles
|
Vantage VA12
|
|
1.08 miles
|
Equinix Ashburn DC1
|
|
1.12 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
1.13 miles
|
44490 Chilum Place: Digital Realty
|
|
1.14 miles
|
NTT VA2
|
|
1.15 miles
|
44751 Round Table (Bldg P)
|
|
1.16 miles
|
Equinix Ashburn DC5
|
|
1.18 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
1.19 miles
|
COPT: 45751 Maries Rd
|
|
1.19 miles
|
Equinix Ashburn DC4
|
|
1.21 miles
|
Digital Realty: IAD43
|
|
1.21 miles
|
ServerCentral Ashburn DC3
|
|
1.21 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
1.22 miles
|
44470 Chillum - Digital Realty
|
|
1.22 miles
|
COPT: 45761 Maries Rd
|
|
1.23 miles
|
CloudHQ LC2
|
|
1.24 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.26 miles
|
Amazon IAD71
|
|
1.27 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
1.29 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
1.33 miles
|
Amazon IAD60
|
|
1.33 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
1.33 miles
|
Rackspace Ashburn IAD3
|
|
1.33 miles
|
CloudHQ Ashburn Campus
|
|
1.36 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
1.37 miles
|
Vantage VA2 Campus
|
|
1.40 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
1.40 miles
|
Amazon 22370 Kipper
|
|
1.41 miles
|
Amazon IAD50
|
|
1.42 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
1.43 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
1.43 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
1.46 miles
|
CyrusOne Sterling VIII
|
|
1.47 miles
|
Amazon 22420 Kipper
|
|
1.48 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
1.49 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
1.51 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
1.51 miles
|
Cyxtera Sterling DC2
|
|
1.52 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
1.53 miles
|
Amazon IAD-69
|
|
1.56 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
1.58 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
1.59 miles
|
44274 Round Table (Bldg L)
|
|
1.60 miles
|
Cyxtera Sterling DC4
|
|
1.62 miles
|
Amazon IAD76
|
|
1.63 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
1.65 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
1.65 miles
|
QTS Ashburn Lockridge
|
|
1.68 miles
|
44372 Round Table: Digital Realty
|
|
1.69 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
1.69 miles
|
NTT Ashburn Campus
|
|
1.70 miles
|
Amazon IAD-51
|
|
1.71 miles
|
Amazon 45111 Loudoun Downs
|
|
1.71 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
1.73 miles
|
Amazon IAD-88
|
|
1.73 miles
|
Equinix DC13
|
|
1.74 miles
|
Amazon IAD15
|
|
1.75 miles
|
Amazon IAD-56
|
|
1.79 miles
|
NTT VA4
|
|
1.80 miles
|
NTT VA5
|
|
1.82 miles
|
Amazon IAD16
|
|
1.90 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
1.91 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
1.92 miles
|
Amazon IAD12
|
|
1.94 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
1.97 miles
|
Amazon IAD-57
|
|
1.98 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
2.06 miles
|
Amazon IAD-58
|
|
2.17 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
2.19 miles
|
QTS Ashburn-Shellhorn DC2
|
|
2.21 miles
|
44351 Import Plz
|
|
2.25 miles
|
FastServ Ashburn
|
|
2.25 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
2.26 miles
|
DataBank Ashburn IAD3
|
|
2.29 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
2.30 miles
|
QTS Ashburn-Shellhorn
|
|
2.30 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
2.30 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
2.30 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
2.30 miles
|
Import Plz, Ashburn
|
|
2.36 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
2.36 miles
|
Cyxtera IAD2-B
|
|
2.36 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
2.36 miles
|
Amazon IAD-67
|
|
2.37 miles
|
AWS: 45950 Pathfinder Plz
|
|
2.39 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
2.43 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
2.44 miles
|
43915 Devin Shafron (Bldg A)
|
|
2.46 miles
|
AWS: 22868 International Dr
|
|
2.46 miles
|
AWS: 22945 International Dr
|
|
2.48 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
2.49 miles
|
AWS: 45930 Pathfinder Plz
|
|
2.52 miles
|
43830 Devin Shafron (Bldg F)
|
|
2.53 miles
|
43881 Devin Shafron (Bldg B)
|
|
2.55 miles
|
45900 Pathfinder Plz
|
|
2.56 miles
|
Amazon IAD-175
|
|
2.58 miles
|
43790 Devin Shafron (Bldg E)
|
|
2.62 miles
|
43831 Devin Shafron (Bldg C)
|
|
2.63 miles
|
Amazon IAD-141
|
|
2.67 miles
|
Amazon IAD140
|
|
2.70 miles
|
43791 Devin Shafron (Bldg D)
|
|
2.70 miles
|
Amazon IAD-54
|
|
4.65 miles
|
Lumen Herndon 1
|
|
4.67 miles
|
Lumen Herndon 3
|
|
4.73 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
4.88 miles
|
Cogent: 510 Huntmar
|
|
5.03 miles
|
Equinix DC97
|
|
5.05 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
5.14 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
5.30 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center with 400,000 square feet of raised white floor space, 50,000 square feet of office space, and 30,000 square feet for support services.
|
5.58 miles
|
Compass Loudoun County
|
|
5.67 miles
|
InfoRelay Herndon
|
|
5.68 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
5.91 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
6.01 miles
|
Google Leesburg Stonewall Park
|
|
6.06 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
6.06 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
6.28 miles
|
Amazon Fadeley I
|
|
6.38 miles
|
Amazon Fadeley II
|
|
6.40 miles
|
Amazon Fadeley III
|
|
6.48 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
6.49 miles
|
Amazon 13600 EDS Drive
|
|
6.78 miles
|
Google Dulles Arcola Center
|
|
6.78 miles
|
InfoRelay Reston
|
|
6.90 miles
|
Amazon Willard Road (Land)
|
|
6.98 miles
|
Google: Arcola 2
|
|
7.15 miles
|
Amazon 25420 Sutton Bay
|
|
7.21 miles
|
PowerHouse Arcola
|
|
7.26 miles
|
Amazon 25410 Sutton Bay
|
|
7.30 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
7.36 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
7.38 miles
|
Amazon Prediction Lane
|
|
7.40 miles
|
Amazon IAD-63
|
|
7.46 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
7.49 miles
|
IBM Softlayer Chantilly WDC01
|
|
7.50 miles
|
Amazon IAD61
|
|
7.53 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
7.53 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
7.53 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
7.63 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
7.73 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
7.78 miles
|
Microsoft Aldie
|
|
7.80 miles
|
Microsoft IAD11
|
|
7.81 miles
|
Microsoft Leesburg 1A
|
|
7.86 miles
|
Amazon 41992 John Mosby Highway
|
|
8.07 miles
|
Amazon IAD9
|
|
8.13 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
8.20 miles
|
Amazon IAD22
|
|
8.20 miles
|
Amazon IAD1
|
|
8.80 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
12.25 miles
|
Equinix Vienna DC8
|
|
13.45 miles
|
Cogent Vienna
|
|
13.47 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
13.48 miles
|
8100 Boone - Digital Realty
|
|
13.86 miles
|
DataBank McLean IAD2
|
|
13.91 miles
|
Lumen McLean 1
|
|
13.92 miles
|
Equinix Vienna DC7
|
|
13.96 miles
|
Element Critical VA1
|
|
14.53 miles
|
XO Fairfax
|
|
14.90 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
15.10 miles
|
AOL: 7777 Infantry Ridge
|
|
15.19 miles
|
Equinix Manassas DC14
|
|
16.07 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
16.09 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
16.19 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
16.32 miles
|
Amazon 7500 Bethlehem
|
|
16.41 miles
|
Amazon IAD7
|
|
16.44 miles
|
Amazon IAD24
|
|
16.50 miles
|
Amazon IAD11
|
|
16.54 miles
|
Amazon IAD-59
|
|
16.60 miles
|
Amazon IAD-52
|
|
16.68 miles
|
Amazon IAD14
|
|
16.76 miles
|
Corscale: Gainesville Crossing
|
|
16.81 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
17.12 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
17.16 miles
|
Amazon: 8190 Bethlehem
|
|
17.19 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.25 miles
|
Amazon Bethlehem Technology Park DC18
|
|
17.25 miles
|
Amazon Bethlehem Technology Park DC20
|
|
17.25 miles
|
Amazon Bethlehem Technology Park DC19
|
|
17.25 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.43 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
17.43 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
17.47 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
17.48 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
17.48 miles
|
Iron Mountain VA-2
|
|
17.51 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
17.57 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
17.58 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
17.65 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
17.65 miles
|
Amazon IAD-73
|
|
17.66 miles
|
Opus Interactive Manassas
|
|
17.67 miles
|
Amazon IAD-74
|
|
17.84 miles
|
Amazon IAD-55
|
|
17.94 miles
|
Amazon: 15455 John Marshall
|
|
18.01 miles
|
Amazon 15465 John Marshall
|
|
18.04 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
18.09 miles
|
9020 Freedom Center
|
|
18.13 miles
|
Yondr Bristow Campus
|
|
18.18 miles
|
9040 Freedom Center
|
|
18.29 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
18.49 miles
|
QTS Manassas DC1
|
|
18.52 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
18.59 miles
|
QTS Manassas DC5
|
|
18.60 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
18.75 miles
|
QTS 10680 University Blvd
|
QTS is looking to expand its existing footprint in Prince William County. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
18.97 miles
|
Amazon: IAD-104
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
18.99 miles
|
Amazon: IAD-105
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
19.05 miles
|
Amazon: 9740 Innovation Drive
|
Amazon is building another data center in it's Innovation Drive campus.
|
19.06 miles
|
Amazon: IAD-106
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
19.20 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
19.20 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
19.20 miles
|
Amazon IAD-77
|
|
19.20 miles
|
Evoswitch USA WDC 1
|
|
19.32 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
19.37 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
19.39 miles
|
Amazon: 11150 Thomasson Barn
|
|
19.42 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
19.43 miles
|
Amazon: 11200 Thomasson Barn
|
|
19.43 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
19.52 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
19.57 miles
|
AWS 10261 Tanner
|
|
19.69 miles
|
AWS IAD 101
|
|
19.70 miles
|
AWS 10281 Tanner Way
|
|
19.80 miles
|
AWS IAD 100
|
|
19.88 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|