0.18 miles
|
CloudHQ MCC3
|
|
0.29 miles
|
CloudHQ MCC2
|
|
1.15 miles
|
AWS IAD 100
|
|
1.19 miles
|
AWS 10281 Tanner Way
|
|
1.25 miles
|
AWS IAD 101
|
|
1.31 miles
|
AWS 10261 Tanner
|
|
1.43 miles
|
AWS: 10453 Wakeman Drive
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
2.22 miles
|
Amazon: IAD-106
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
2.24 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
2.30 miles
|
Amazon: IAD-105
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
2.40 miles
|
Amazon: IAD-104
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
2.42 miles
|
QTS 10680 University Blvd
|
QTS is looking to expand its existing footprint in Prince William County. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
2.43 miles
|
Amazon: 11150 Thomasson Barn
|
|
2.47 miles
|
Amazon: 11200 Thomasson Barn
|
|
2.56 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
2.60 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
2.60 miles
|
QTS Manassas DC1
|
|
2.64 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
2.70 miles
|
Evoswitch USA WDC 1
|
|
2.70 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
2.70 miles
|
Amazon IAD-77
|
|
2.70 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
2.74 miles
|
QTS Manassas DC5
|
|
2.85 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
2.88 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
2.92 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
3.09 miles
|
9040 Freedom Center
|
|
3.10 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
3.13 miles
|
9020 Freedom Center
|
|
3.66 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
4.06 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
4.40 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
4.51 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
4.54 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
4.59 miles
|
Opus Interactive Manassas
|
|
4.68 miles
|
Amazon Bethlehem Technology Park DC18
|
|
4.74 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
4.79 miles
|
Iron Mountain VA-2
|
|
4.80 miles
|
Amazon Bethlehem Technology Park DC19
|
|
4.83 miles
|
Amazon: 8190 Bethlehem
|
|
4.86 miles
|
Amazon Bethlehem Technology Park DC20
|
|
4.88 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
5.18 miles
|
Amazon IAD-74
|
|
5.26 miles
|
Amazon IAD-73
|
|
5.44 miles
|
Amazon 7500 Bethlehem
|
|
5.45 miles
|
Amazon IAD7
|
|
5.46 miles
|
Amazon IAD11
|
|
5.48 miles
|
Amazon IAD24
|
|
5.61 miles
|
Amazon IAD14
|
|
5.65 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
5.69 miles
|
Amazon IAD-52
|
|
5.77 miles
|
Amazon IAD-59
|
|
5.82 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
5.87 miles
|
Equinix Manassas DC14
|
|
5.99 miles
|
AOL: 7777 Infantry Ridge
|
|
6.01 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
6.16 miles
|
Yondr Bristow Campus
|
|
6.61 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
6.75 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
6.82 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
7.11 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
7.24 miles
|
Corscale: Gainesville Crossing
|
|
7.26 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
8.37 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
8.87 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
9.61 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
9.74 miles
|
OVH US East Vint Hill
|
|
10.50 miles
|
Amazon IAD-55
|
|
10.70 miles
|
Amazon: 15455 John Marshall
|
|
10.70 miles
|
Amazon 15465 John Marshall
|
|
11.96 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
12.57 miles
|
Amazon IAD22
|
|
12.58 miles
|
Amazon IAD1
|
|
12.71 miles
|
Amazon IAD9
|
|
13.03 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
13.27 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
13.31 miles
|
IBM Softlayer Chantilly WDC01
|
|
13.56 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
13.58 miles
|
Amazon IAD61
|
|
13.63 miles
|
Amazon 25410 Sutton Bay
|
|
13.71 miles
|
Amazon IAD-63
|
|
13.72 miles
|
Amazon 25420 Sutton Bay
|
|
13.78 miles
|
Amazon Prediction Lane
|
|
14.04 miles
|
Amazon Willard Road (Land)
|
|
14.56 miles
|
Amazon 13600 EDS Drive
|
|
15.34 miles
|
InfoRelay Herndon
|
|
15.49 miles
|
Google: Arcola 2
|
|
15.64 miles
|
PowerHouse Arcola
|
|
15.67 miles
|
Amazon 41992 John Mosby Highway
|
|
15.76 miles
|
Google Dulles Arcola Center
|
|
15.89 miles
|
Amazon Fadeley II
|
|
15.97 miles
|
Amazon Fadeley III
|
|
16.00 miles
|
Amazon Fadeley I
|
|
16.16 miles
|
Microsoft IAD11
|
|
16.21 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
16.43 miles
|
Microsoft Aldie
|
|
16.56 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center with 400,000 square feet of raised white floor space, 50,000 square feet of office space, and 30,000 square feet for support services.
|
16.77 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
16.88 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
17.27 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
17.35 miles
|
XO Fairfax
|
|
17.53 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
17.53 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
17.56 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
17.98 miles
|
Equinix DC97
|
|
17.98 miles
|
Cogent: 510 Huntmar
|
|
18.11 miles
|
InfoRelay Reston
|
|
18.15 miles
|
Lumen Herndon 3
|
|
18.17 miles
|
Lumen Herndon 1
|
|
18.24 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
18.28 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
18.28 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
18.32 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
18.33 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
18.48 miles
|
Amazon IAD-175
|
|
18.54 miles
|
AWS: 22945 International Dr
|
|
18.62 miles
|
AWS: 22868 International Dr
|
|
18.64 miles
|
Amazon IAD140
|
|
18.71 miles
|
Amazon IAD-58
|
|
18.71 miles
|
Amazon IAD-141
|
|
18.72 miles
|
Cyxtera IAD2-B
|
|
18.74 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
18.76 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
18.79 miles
|
Amazon IAD-57
|
|
18.84 miles
|
Amazon IAD12
|
|
18.86 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
18.87 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
18.95 miles
|
Amazon IAD16
|
|
19.03 miles
|
Amazon IAD15
|
|
19.03 miles
|
Amazon IAD-88
|
|
19.05 miles
|
Amazon IAD-56
|
|
19.05 miles
|
Amazon 45111 Loudoun Downs
|
|
19.09 miles
|
45900 Pathfinder Plz
|
|
19.11 miles
|
Amazon IAD-51
|
|
19.13 miles
|
44351 Import Plz
|
|
19.16 miles
|
AWS: 45950 Pathfinder Plz
|
|
19.17 miles
|
Amazon IAD76
|
|
19.19 miles
|
AWS: 45930 Pathfinder Plz
|
|
19.19 miles
|
Import Plz, Ashburn
|
|
19.21 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
19.26 miles
|
QTS Ashburn Lockridge
|
|
19.26 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
19.28 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
19.30 miles
|
QTS Ashburn-Shellhorn
|
|
19.36 miles
|
Amazon 22420 Kipper
|
|
19.36 miles
|
QTS Ashburn-Shellhorn DC2
|
|
19.41 miles
|
Amazon 22370 Kipper
|
|
19.50 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
19.50 miles
|
Amazon IAD-67
|
|
19.53 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
19.56 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
19.57 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
19.57 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
19.57 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
19.58 miles
|
43881 Devin Shafron (Bldg B)
|
|
19.58 miles
|
Vantage VA2 Campus
|
|
19.61 miles
|
43831 Devin Shafron (Bldg C)
|
|
19.62 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
19.63 miles
|
43915 Devin Shafron (Bldg A)
|
|
19.65 miles
|
Amazon IAD-54
|
|
19.65 miles
|
43791 Devin Shafron (Bldg D)
|
|
19.69 miles
|
Digital Realty: IAD43
|
|
19.69 miles
|
Vantage VA12
|
|
19.70 miles
|
Sentinel Ashburn
|
|
19.72 miles
|
43830 Devin Shafron (Bldg F)
|
|
19.76 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
19.77 miles
|
43790 Devin Shafron (Bldg E)
|
|
19.78 miles
|
Cogent Vienna
|
|
19.85 miles
|
Equinix Vienna DC7
|
|
19.86 miles
|
Vantage VA11
|
|
19.87 miles
|
Vantage VA13
|
|
19.88 miles
|
8100 Boone - Digital Realty
|
|
19.88 miles
|
Element Critical VA1
|
|
19.92 miles
|
PowerHouse Pacific
|
|
19.92 miles
|
Digital Realty: Broderick Drive
|
|
19.98 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|