0.50 miles
|
Microsoft Leesburg 1A
|
|
1.92 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
2.41 miles
|
Google Leesburg Stonewall Park
|
|
3.03 miles
|
Compass Loudoun County
|
|
3.15 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
6.29 miles
|
DataBank Ashburn IAD3
|
|
6.39 miles
|
FastServ Ashburn
|
|
6.40 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
6.53 miles
|
Sabey: Intergate.Ashburn (Building B)
|
|
6.54 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
6.54 miles
|
NTT VA4
|
|
6.60 miles
|
NTT VA5
|
|
6.65 miles
|
Sabey Intergate.Ashburn (Building A)
|
Two of the three buildings on the Sabey Data Centers (SDC) Ashburn campus are completed. Sabey Data Centers was rolling with the next building (Building A) to come on their campus, a 54 MW facility, but that has been put on hold because of the Dominion situation.
|
6.66 miles
|
NTT Ashburn Campus
|
|
6.73 miles
|
Amazon IAD50
|
|
6.77 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
6.77 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
6.82 miles
|
Amazon IAD60
|
|
6.82 miles
|
43790 Devin Shafron (Bldg E)
|
|
6.86 miles
|
Amazon IAD-54
|
|
6.86 miles
|
43791 Devin Shafron (Bldg D)
|
|
6.88 miles
|
Amazon IAD71
|
|
6.88 miles
|
Rackspace Ashburn IAD3
|
|
6.88 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
6.90 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
6.91 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
6.91 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
6.91 miles
|
43830 Devin Shafron (Bldg F)
|
|
6.94 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
6.95 miles
|
43831 Devin Shafron (Bldg C)
|
|
6.95 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
6.95 miles
|
44470 Chillum - Digital Realty
|
|
6.96 miles
|
ServerCentral Ashburn DC3
|
|
6.96 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
6.97 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
6.97 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
6.99 miles
|
NTT VA2
|
|
7.02 miles
|
Equinix DC13
|
|
7.05 miles
|
43881 Devin Shafron (Bldg B)
|
|
7.05 miles
|
44490 Chilum Place: Digital Realty
|
|
7.06 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
7.06 miles
|
43915 Devin Shafron (Bldg A)
|
|
7.07 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
7.09 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
7.10 miles
|
Lumen Ashburn
|
|
7.10 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
7.10 miles
|
Amazon 44862 Interconnection Plaza
|
|
7.15 miles
|
Equinix Ashburn DC4
|
|
7.18 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
7.19 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
7.20 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
7.20 miles
|
Equinix Ashburn DC5
|
|
7.23 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
7.23 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
7.23 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
7.25 miles
|
Amazon 44858 Interconnection Plaza
|
|
7.26 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
7.26 miles
|
Amazon IAD-67
|
|
7.26 miles
|
44372 Round Table: Digital Realty
|
|
7.26 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
7.26 miles
|
Equinix Ashburn DC1
|
|
7.28 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
7.29 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
7.30 miles
|
Amazon 44854 Interconnection
|
|
7.31 miles
|
44274 Round Table (Bldg L)
|
|
7.33 miles
|
CloudHQ LC2
|
|
7.35 miles
|
Equinix Ashburn DC6
|
|
7.35 miles
|
Equinix Ashburn DC11
|
|
7.37 miles
|
CloudHQ Ashburn Campus
|
|
7.38 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
7.38 miles
|
VPLS IAD
|
|
7.40 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
7.41 miles
|
Equinix DC15
|
|
7.42 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
7.48 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
7.52 miles
|
PowerHouse ABX1
|
|
7.54 miles
|
QTS Ashburn-Shellhorn
|
|
7.55 miles
|
QTS Ashburn-Shellhorn DC2
|
|
7.62 miles
|
44751 Round Table (Bldg P)
|
|
7.67 miles
|
Equinix DC21
|
|
7.68 miles
|
Import Plz, Ashburn
|
|
7.70 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
7.84 miles
|
44351 Import Plz
|
|
7.87 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
8.04 miles
|
21641 Charles View
|
|
8.08 miles
|
CyrusOne Northern Virginia Sterling V
|
|
8.13 miles
|
21710 Charles View
|
|
8.14 miles
|
Amazon IAD32
|
|
8.14 miles
|
Digital Realty: Broderick Drive
|
|
8.19 miles
|
Digital Realty: IAD43
|
|
8.20 miles
|
Amazon 45259 Severn
|
|
8.21 miles
|
Amazon IAD10
|
|
8.27 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
8.28 miles
|
Amazon 45305 Severn
|
|
8.28 miles
|
PowerHouse Pacific
|
|
8.34 miles
|
QTS Ashburn Lockridge
|
|
8.41 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
8.49 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
8.65 miles
|
Amazon IAD76
|
|
8.68 miles
|
Vantage VA13
|
|
8.70 miles
|
COPT: 45751 Maries Rd
|
|
8.74 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
8.76 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
8.76 miles
|
Vantage VA12
|
|
8.77 miles
|
Sentinel Ashburn
|
|
8.77 miles
|
Vantage VA11
|
|
8.81 miles
|
COPT: 45761 Maries Rd
|
|
8.82 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
8.83 miles
|
Amazon IAD15
|
|
8.89 miles
|
Amazon IAD16
|
|
8.94 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
8.94 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
8.97 miles
|
Amazon IAD-69
|
|
8.98 miles
|
Microsoft Aldie
|
|
8.99 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
9.00 miles
|
Amazon IAD12
|
|
9.09 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
9.10 miles
|
CyrusOne Sterling IX
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center with 400,000 square feet of raised white floor space, 50,000 square feet of office space, and 30,000 square feet for support services.
|
9.11 miles
|
Cyxtera Sterling DC2
|
|
9.11 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
9.11 miles
|
Amazon IAD-88
|
|
9.12 miles
|
Amazon 22370 Kipper
|
|
9.13 miles
|
Cyxtera Sterling DC4
|
|
9.13 miles
|
Amazon 45111 Loudoun Downs
|
|
9.14 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
9.15 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
9.17 miles
|
CyrusOne Sterling VIII
|
|
9.20 miles
|
Amazon 22420 Kipper
|
|
9.24 miles
|
Microsoft IAD11
|
|
9.28 miles
|
Amazon IAD-57
|
|
9.28 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
9.29 miles
|
Vantage VA2 Campus
|
|
9.31 miles
|
Amazon IAD-56
|
|
9.32 miles
|
Amazon IAD-51
|
|
9.35 miles
|
Amazon IAD-58
|
|
9.44 miles
|
Amazon Fadeley I
|
|
9.44 miles
|
Amazon Fadeley III
|
|
9.52 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
9.54 miles
|
Amazon Fadeley II
|
|
9.61 miles
|
Google Dulles Arcola Center
|
|
9.70 miles
|
Amazon 41992 John Mosby Highway
|
|
9.70 miles
|
PowerHouse Arcola
|
|
9.87 miles
|
Google: Arcola 2
|
|
10.06 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
10.13 miles
|
Cyxtera IAD2-B
|
|
10.14 miles
|
AWS: 22945 International Dr
|
|
10.16 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
10.20 miles
|
AWS: 22868 International Dr
|
|
10.24 miles
|
Amazon IAD-175
|
|
10.40 miles
|
AWS: 45950 Pathfinder Plz
|
|
10.52 miles
|
Amazon IAD-141
|
|
10.54 miles
|
AWS: 45930 Pathfinder Plz
|
|
10.54 miles
|
Amazon IAD140
|
|
10.59 miles
|
45900 Pathfinder Plz
|
|
11.90 miles
|
Amazon Willard Road (Land)
|
|
11.90 miles
|
Amazon Prediction Lane
|
|
12.00 miles
|
Amazon IAD-63
|
|
12.15 miles
|
Amazon IAD61
|
|
12.31 miles
|
Amazon 25420 Sutton Bay
|
|
12.34 miles
|
Amazon 25410 Sutton Bay
|
|
12.46 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
12.56 miles
|
InfoRelay Herndon
|
|
12.70 miles
|
Lumen Herndon 1
|
|
12.71 miles
|
Lumen Herndon 3
|
|
12.77 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
12.84 miles
|
IBM Softlayer Chantilly WDC01
|
|
12.89 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
12.90 miles
|
Cogent: 510 Huntmar
|
|
13.06 miles
|
Equinix DC97
|
|
13.10 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
13.26 miles
|
Amazon 13600 EDS Drive
|
|
13.35 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
13.87 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
13.95 miles
|
Amazon IAD9
|
|
14.02 miles
|
Amazon IAD22
|
|
14.05 miles
|
Amazon IAD1
|
|
14.08 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
14.08 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
14.42 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
14.88 miles
|
InfoRelay Reston
|
|
15.48 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
15.65 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
15.65 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
15.75 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
16.19 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
17.32 miles
|
Rowan: Frederick County, Maryland
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland. The campus is set to offer 231MW.
|
17.42 miles
|
Compass: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
18.35 miles
|
Quantum Loophole: Frederick Campus
|
|
18.96 miles
|
Amazon IAD-55
|
|
18.96 miles
|
Amazon: 15455 John Marshall
|
|
19.02 miles
|
Amazon 15465 John Marshall
|
|
19.35 miles
|
AOL: 7777 Infantry Ridge
|
|
19.47 miles
|
Equinix Manassas DC14
|
|
19.48 miles
|
Corscale: Gainesville Crossing
|
|
19.51 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
19.57 miles
|
NTT Gainesville VA Campus
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.
|
19.65 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.81 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.85 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
19.90 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
19.98 miles
|
Microsoft: Gainesville, VA
|