0.32 miles
|
Microsoft Hoffman Estates 1
|
|
3.66 miles
|
Complete Source Schaumburg
|
|
4.47 miles
|
Compass Hoffman Estates
|
|
8.34 miles
|
Aligned: ORD-03
|
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
|
8.79 miles
|
NTT Chicago CH1
|
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
8.96 miles
|
NTT: 1250 N Arlington Heights (Planned)
|
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
|
9.00 miles
|
NTT: 1200 N Arlington Heights (Planned)
|
Expansion site acquired in November 2023.
|
9.04 miles
|
T5 Chicago II
|
|
9.62 miles
|
Prime Elk Grove
|
|
9.81 miles
|
CoreWeave: US Central ORD1
|
|
9.84 miles
|
CenturyLink: Arlington Heights
|
|
9.86 miles
|
CloudHQ Mount Prospect ORD3
|
|
9.88 miles
|
STACK CHI01B
|
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
9.98 miles
|
STACK Chicago CHI01
|
|
10.00 miles
|
Skybox Chicago I
|
|
10.41 miles
|
1450 E Devon Ave (CH3) DRT
|
|
10.50 miles
|
ServerCentral CH1
|
|
10.50 miles
|
Digital Elk Grove Village Campus
|
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
10.50 miles
|
HostPapa CH1
|
Formerly known as "ColoCrossing CH1"
|
10.51 miles
|
Stream Chicago II
|
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
|
10.52 miles
|
2200 Busse Rd (CH1) DRT
|
|
10.52 miles
|
Rackspace Elk Grove ORD1
|
|
10.59 miles
|
Equinix Chicago CH3
|
|
10.68 miles
|
2299 Busse (CH2) Digital Realty
|
|
10.69 miles
|
EdgeConneX CHI02
|
|
10.69 miles
|
Stream Chicago I
|
|
10.78 miles
|
Cyxtera Elk Grove CH3
|
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
10.79 miles
|
Edgeconnex Chicago Campus
|
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
|
10.79 miles
|
EdgeConneX CHI01
|
|
10.92 miles
|
Colocation America CH3
|
|
10.92 miles
|
DataBank ORD3 Mount Prospect
|
|
11.14 miles
|
Element Critical CH1
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
11.17 miles
|
Element Critical CH2
|
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
13.82 miles
|
Iron Mountain Chicago
|
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
14.88 miles
|
New Continuum: 603 Discovery
|
|
14.89 miles
|
T5 Northlake IL
|
|
15.36 miles
|
Microsoft Chicago Northlake
|
|
15.73 miles
|
505 N Railroad Ave - Digital Realty
|
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
15.82 miles
|
Aligned Chicago ORD-01
|
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~72 MW of critical load.
|
15.82 miles
|
Aligned ORD-02
|
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
|
16.50 miles
|
CyrusOne Chicago Lombard
|
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
16.96 miles
|
360TCS-Lombard
|
|
16.96 miles
|
Digital Fortress: Chicago Lombard
|
|
17.44 miles
|
Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
|
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
17.45 miles
|
9377 Grand Ave
|
|
17.46 miles
|
9355 Grand Ave
|
|
17.50 miles
|
9333 Grand Ave (DRT)
|
|
17.50 miles
|
SingleHop Chicago
|
|
17.54 miles
|
Tierpoint Chicago West
|
|
18.45 miles
|
NetSource Chicago
|
|
18.72 miles
|
Server Farm Oak Brook
|
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
18.72 miles
|
US Signal Oakbrook
|
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
18.72 miles
|
XO: (Oak Brook)
|
|
18.73 miles
|
Cogent Naperville
|
|
18.73 miles
|
NYI Chicago (Oak Brook)
|
|
18.83 miles
|
LexusNexis Oak Brook
|
|
18.83 miles
|
XO (Swift Dr)
|
|
18.83 miles
|
DataBank (ORD4) Oak Brook
|
|
18.90 miles
|
Evoque Lisle CH1
|
|
19.19 miles
|
Edged Energy: Aurora, Chicago
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.40 miles
|
Edged Energy: Chicago ORD02
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.49 miles
|
Edged Energy: Chicago ORD03
|
The new data center campus, known as Aurora TechPark, facility will offer 100 MW of capacity built to handle dense AI-driven workloads on their way to transforming the IT industry.
|
19.94 miles
|
Verizon Chicago (Downers Grove)
|
|
19.95 miles
|
Equinix Chicago CH7
|
|
19.96 miles
|
CyrusOne Chicago Aurora CME
|
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|