Amazon: 5117 Hayden Run

Street Address
Interested in this information? Contact us

░░░░░░░ Login to view SqFt Total Building Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

This Facility
Click Map to begin Search

Sites within 15 miles of Amazon: 5117 Hayden Run

Show SqM
Distance Site About
0.14 miles Amazon Hilliard: 5109 Hayden Run
0.23 miles Amazon: 5113 Hayden Run
2.26 miles Amazon: 4612 Cosgray Rd
AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.
2.28 miles Amazon: Cosgray Rd Campus
AWS is building its second data center campus in Hilliard, Ohio. The $200 million data center campus is located on a 104-acre site between Cosgray and Leppert roads.
2.31 miles Expedient Dublin
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
2.57 miles DartPoints Dublin
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
2.90 miles Expedient Upper Arlington
4.42 miles Amazon: 6645 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
4.46 miles Amazon: 6655 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
4.52 miles Amazon: 6665 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
4.55 miles Amazon: 6675 Crosby Ct
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
4.61 miles Amazon Crosby Campus
Amazon is building a five-building data center campus in New Albany, Ohio.
6.18 miles IBM Columbus
8.05 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
8.06 miles Cologix COL3
8.21 miles Cologix Columbus COL4
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
9.17 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
9.29 miles Lumen: 580 North 4th
9.65 miles Lumen: 266 North 5th
9.68 miles Cogent: 240 North 5th
9.70 miles CityNet Columbus
9.71 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
9.71 miles Lumen: 226 North Fifth
9.73 miles Racksquared 2560 Value Way
9.85 miles Racksquared 325 E Spring St
9.89 miles Deep Edge: 180 East Broad
9.89 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
10.01 miles Cyxtera Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord
10.05 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
10.50 miles eNET Columbus
11.02 miles WeConnect Westerville
15.45 miles CeraNet Columbus
16.03 miles Google Lockbourne, OH
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
17.17 miles Discover Financial Services New Albany
17.21 miles Edged Energy: New Albany, Ohio
Edged Energy is developing a data center in the Ohio city. the data center is expected to span 210,000 sq ft (19,510 sqm) on a 15-acre parcel at 6385 New Albany Road East.
17.47 miles TJX Corporate Techno
17.51 miles Compass New Albany
17.66 miles Compugen New Albany
17.79 miles Stack: NAL01 Future Expansion
STACK INFRASTRUCTURE plans to expand it's NAL01 campus, located at Souder Road, New Albany, OH. Upon completion, this facility will have an available power capacity of 48 megawatts.
17.94 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
18.14 miles Compass Groveport AEP II
American Electric Power invested approximately $125 million into the data center on Hamilton Road
19.64 miles Google New Albany Ohio
19.92 miles QTS: New Albany 1 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. The first building of the campus will be located at 1225 Beech Rd SW, New Albany, OH . New Albany 1 will offer 144MW across two facilities.

Amazon: 5117 Hayden Run Data Center Photos

Operating Company

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

218 Facilities Owned
31 Markets Served
2850.5 Megawatts
View Company

News

Read More News