0.33 miles
|
2055 E Technology - Digital Realty
|
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix.
The building is SOC2 certified with 24/7 security and critical facilities management.
|
2.90 miles
|
Internap Phoenix 2500 W Frye Rd
|
The site was launched in 2018 in conjunction with Lincoln Rackhouse, Internap's landlord
|
2.90 miles
|
2500 W Frye
|
|
4.36 miles
|
OneNeck Phoenix 1
|
|
4.45 miles
|
1900 S Price - Digital Realty
|
The Building is 1 story
Flood Zone: Zone X
Seismic Zone: Zone 1
|
4.49 miles
|
H5 Phoenix
|
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
|
4.60 miles
|
redIT Chandler
|
|
4.60 miles
|
2121 S Price - Digital Realty
|
In 2010, DRT acquired this site from 365 Main portfolio.
|
4.77 miles
|
CyrusOne PHX9
|
|
4.79 miles
|
CyrusOne PHX10
|
|
4.86 miles
|
CyrusOne PHX3
|
|
4.86 miles
|
CyrusOne PHX2
|
|
4.93 miles
|
OneNeck Phoenix 2
|
|
4.95 miles
|
CyrusOne PHX1
|
|
4.96 miles
|
CyrusOne Chandler Phoenix Campus
|
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
|
5.02 miles
|
CyrusOne PHX5
|
|
5.09 miles
|
CyrusOne PHX4
|
|
5.11 miles
|
Aligned: PHX-06
|
PHX06 is a two-phase development that will total 456,946 SqFt
|
5.13 miles
|
Aligned: PHX-04
|
Construction began in July 2022.
|
5.16 miles
|
CyrusOne PHX6
|
|
5.22 miles
|
CyrusOne PHX8
|
|
5.25 miles
|
CyrusOne PHX7
|
|
5.50 miles
|
EdgeConneX Phoenix
|
|
6.04 miles
|
Evoque PHX1
|
|
8.03 miles
|
XO: 3930 Watkins
|
|
8.15 miles
|
PhoenixNAP-Phoenix
|
|
8.15 miles
|
Cyxtera Phoenix PH1
|
|
8.97 miles
|
DataBank PHX2
|
|
8.99 miles
|
Internap Phoenix
|
|
8.99 miles
|
Iron Mountain Phoenix
|
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)
41-acre Iron Mountain Hyperscale-Ready campus
588,000 gross square feet
32 MW – redundant feeds
|
8.99 miles
|
redIT Phoenix
|
|
9.78 miles
|
STACK Phoenix PHX02 Campus
|
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
9.83 miles
|
Stack: PHX02 Building 3
|
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
9.83 miles
|
Stack: PHX02 Building 2
|
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
9.92 miles
|
Stack: PHX02 Building 4
|
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
9.99 miles
|
Stack: PHX02 Building 5
|
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
10.01 miles
|
QTS Phoenix
|
QTS expansion with an 84-acre campus with 5 planned buildings with 280 MW of critical power
|
10.83 miles
|
Windstream Phoenix
|
|
10.88 miles
|
CenturyLink: 811 S. 16th
|
|
10.90 miles
|
Lumen Phoenix 1
|
|
11.13 miles
|
GoDaddy: Gilbert, AZ
|
|
12.53 miles
|
LightEdge: Phoenix Van Buren
|
|
12.53 miles
|
120 E Van Buren - Digital Realty
|
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix.
The building is also home to many colocation operators including AIS, QTS, Sungard, XO
|
12.53 miles
|
XO: 120 Van Buren
|
|
12.54 miles
|
QTS Phoenix Van Buren
|
QTS acquired this site via the Carpathia acquisition in 2015.
|
13.66 miles
|
Lumen Phoenix 2
|
|
13.89 miles
|
Liquid Web Phoenix
|
|
14.12 miles
|
DataBank Phoenix PHX1
|
|
14.40 miles
|
eBay Arizona
|
eBay's data center is also known as Project Mercury.
|
15.33 miles
|
Comarch Mesa
|
|
15.78 miles
|
CyrusOne Mesa
|
|
16.19 miles
|
EdgeCore Mesa
|
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 178,252 sqft with an adjoining 20,000 sqft office and support space.
|
16.53 miles
|
NTT PH3
|
|
16.61 miles
|
NTT PH1
|
|
16.64 miles
|
NTT Phoenix Campus
|
The 102-acre campus will have seven data centers offering a total of 240 MWs of critical IT load and 1.5 million sqft of space, along with an on-site dedicated substation. The first data center will offer 36MW across six 6MW vaults and 126,000 sqft
|
16.71 miles
|
Amazon: Elliot Campus, Mesa
|
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
|
16.72 miles
|
NTT PH2
|
|
16.99 miles
|
Amazon: Pecos Campus, Mesa
|
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
|
17.09 miles
|
Apple Mesa
|
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
|
19.75 miles
|
Expedient Phoenix
|
The site was originally a build-to-suit Tier-III data center for Blue Cross commissioned in 2010, the data center is part of a complex of Blue Cross-occupied facilities
|
19.75 miles
|
Blue Cross Blue Shield Phoenix
|
|