NSA Utah Data Center

N 11600 W

░░░░░░░░░ Login to view SqFt Total Building Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by: National Security Agency

The mammoth NSA data center, which cost some $1.7 billion, will allow the NSA to store more and, perhaps more importantly, keep data for much longer. At the time when it was under construction, the Utah facility was the Department of Defense’s largest ongoing construction project in the continental U.S. It was completed in 2014.

NSA chose the Bluffdale location because electricity is cheaper here, and land more easily available. The center will constantly use 65 megawatts of power -- enough to power 33,000 houses.

The site has (4) four 25,000 sqft data halls. Each data hall will have up to 18.75 megawatts of critical power.

Map and Nearby Locations:

N 11600 W
Click Map to begin Search

Sites within 15 miles of NSA Utah Data Center

Show SqM
Distance Site About
3.97 miles DataBank SLC3
4.02 miles DataBank SLC6
4.02 miles DataBank SLC2
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
4.02 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
4.09 miles DataBank SLC4
4.11 miles DataBank SLC5
4.53 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site
8.64 miles Tract: Eagle Mountain, Utah
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
8.80 miles C7 Lindon (Timpanogos)
10.83 miles Aligned SLC-03
10.94 miles Aligned SLC-02
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
11.13 miles Aligned Salt Lake City
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
11.13 miles eBay South Jordan Topaz
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
11.40 miles XO: 8871 South Sandy
11.43 miles Aligned: SLC05
11.90 miles Novva South Jordan Campus
11.98 miles Facebook Eagle Mountain Utah
The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
12.24 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
12.75 miles Flexential Salt Lake (Lindon)
13.59 miles Flexential Salt Lake (South View)
15.10 miles Voonami Orem SLC1
15.85 miles Flexential Salt Lake (Cottonwood)
17.24 miles Fibernet ORM1
18.28 miles Flexential Salt Lake (Mill Creek)

NSA Utah Data Center Data Center Photos

Operating Company

National Security Agency
1 Facilities Owned
1 Markets Served
65.0 Megawatts
View Company