Sabey Data Centers Photos

Sabey Data Centers Data Center Photos


This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through...
The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.
The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceili...

Exterior View
Posted in Sabey Intergate.Manhattan
Source: InformationWeek
This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through...
6th Floor Computer Room
Posted in Sabey Intergate.Manhattan

This squeaky clean space on the 6th floor has everything but the computers. Note the absence of raised floors. In this facility, servers will be placed on concrete slabs. Air supply travels through the walls from the computer room air handler units that can be adjusted as necessary.

Source: InformationWeek
Rendering of 6th Floor When When Filled With Rows of Cabinets
Posted in Sabey Intergate.Manhattan
Source: Sabey
The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.
5th Floor UBS Room
Posted in Sabey Intergate.Manhattan

The 5th floor houses the data center's uninterruptable power supply systems and backup batteries. The UPS room itself is redundant, too. There are four of these UPS rooms.

Source: InformationWeek
The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceili...
Chiller Plant on the 4th Floor
Posted in Sabey Intergate.Manhattan

The chiller plant on the 4th floor of the data center is comprised of condenser water pumps and risers that are responsible for maintaining the appropriate temperature in the data center. The ceilings in this area are 23 feet high. As the temperature cools down outside the building, the chillers can be dialed back.

Source: InformationWeek
4th Floor Caterpillar Generators
Posted in Sabey Intergate.Manhattan
Verizon Building Before Renovation
Posted in Sabey Intergate.Manhattan
Before - After Renovation
Posted in Sabey Intergate.Manhattan
Source: 6sqft.com
Verizon Building After Renovation
Posted in Sabey Intergate.Manhattan
View of 32 Avenue of the Americas from 375 Pearl Street (Sabey)
Posted in Sabey Intergate.Manhattan
Two building campus plan
Posted in Sabey Austin
View of Sabey's new campus in Austin
Posted in Sabey Austin