QTS Data Centers Photos

QTS Data Centers Data Center Photos


Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center
In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the...
The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies appro...

Diagram of QTS's Site in Chicago
Posted in QTS Chicago
Source: QTS
Exterior View of QTS's Chicago Building
Posted in QTS Chicago
Source: QTS
Under Construction at 22271 Broderick Drive in Ashburn
Posted in QTS Ashburn 1
Source: QTS
Site Plan Diagram of QTS's Ashburn 1 Site
Posted in QTS Ashburn 1
Source: QTS
Aerial View of QTS's Ashburn Data Center
Posted in QTS Ashburn 1
Aerial Rendering of QTS's Irving Data Center
Posted in QTS Irving
Source: Walker Engineering
Raw Space Ready for Build-out
Posted in QTS Chicago
Source: Bisnow/Dees Stribling
A Technician Rides a Bike Down a Data Center Aisle
Posted in QTS Atlanta Suwanee
Source: QTS
Lobby Entrance
Posted in QTS Chicago
Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
QTS Chicago Site Layout
Posted in QTS Chicago

Phase 1 has 6 MW of power and 48,000 square feet of raised floor space

Source: QTS
The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center
Flooring Structure Exposed During Renovation
Posted in QTS Irving

The semiconductor manufacturing facility 'bones' provides an excellent weight-bearing structure for the data center

Front Door Entrance
Posted in QTS Irving
KyotoCooling System
Posted in QTS Chicago
Chicago SunTimes Building Before QTS's Acquisition
Posted in QTS Chicago
Kyoto Units Installed on the Roof
Posted in QTS Chicago
Source: Mission Critical Magazine
Pre-Construction Rendering of the Facility at 22271 Broderick Drive
Posted in QTS Ashburn 1
Aerial Rendering of QTS's Irving Data Center
Posted in QTS Irving
Source: QTS
Entrance to the QTS Atlanta Metro Facility
Posted in QTS Atlanta Metro
Cooling Tower on the Roof
Posted in QTS Atlanta Metro
Source: JE Dunn
Large Colocation Room
Posted in QTS Atlanta Metro
Source: JE Dunn
In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the...
Gasketed Plate and Frame Heat Exchanger
Posted in QTS Atlanta Metro

In a gasketed plate and frame heat exchanger, the fluids run counter-currently through the heat exchanger. The hot liquid normally enters through one of the upper connections and leaves through the connection underneath. The cold liquid enters through one of the lower connections and leaves through the connection above.

As the fluids pass through the heat exchanger, heat is transferred from the hot media to the cold media.

Front of Building and Parking Area
Posted in QTS Atlanta Suwanee
Cooling Infrastructure
Posted in QTS Atlanta Suwanee
Colocation Room at QTS Suwanee
Posted in QTS Atlanta Suwanee
QTS's Site in Sandston (Richmond)
Posted in QTS Richmond
QTS Sacramento at 1100 N Market Blvd
Posted in QTS Sacramento
Source: QTS
Outside of "The Vault"
Posted in QTS Ashburn-Moran
Source: QTS
Drone photo of the Ashburn-Moran facility
Posted in QTS Ashburn-Moran
Source: QTS
QTS data center at 95 Christopher Columbus Drive
Posted in QTS Jersey City
Drone shot of the facility on 9340 Godwin Drive
Posted in QTS Manassas DC1
The Manassas facility as construction was completing in February 2019
Posted in QTS Manassas DC1
QTS at 11234 NW 20th Street
Posted in QTS Miami
Overland is also the QTS headquarters
Posted in QTS Overland Park
Rendering of QTS Phoenix
Posted in QTS Phoenix
Source: QTS
Mechanical Room
Posted in QTS Princeton
Source: QTS
The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies appro...
QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System
Posted in QTS Princeton

The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere. The Solar Array occupies approximately 50 acres of a 194 acre campus. The PV system contains over 57,000 solar modules, 24 power inverters and was constructed on a portion of the campus that was previously used for an agricultural purpose. The project site is surrounded on two sides by existing residential neighborhoods which resulted in the need to address both the visual and the physical impact of the extensive renewable energy facility on the adjacent community.

Front of the unassuming building
Posted in QTS Princeton
QTS at 2805/2807 Mission College Blvd
Posted in QTS Santa Clara
Conference Room
Posted in QTS Santa Clara
Exterior of the Eemshaven facility
Posted in QTS Eemshaven
QTS at Zernikelaan 16, north of Groningen
Posted in QTS Groningen
Former Dupont Fabros Facility has Solar Array on the roof
Posted in QTS Piscataway
QTS expansion land called "Project Isaac" sits just South of QTS and West of the Facebook campus
Posted in QTS Richmond
Rendering of QTS Hillsboro
Posted in QTS Hillsboro 1
Rendering of the 5 building campus
Posted in QTS Phoenix
Source: QTS
Piscataway Facility
Posted in QTS Piscataway
Source: QTS
View of the almost completed facility in 2020
Posted in QTS Phoenix
Rendering of facility
Posted in QTS Denver
Campus plan as of 2023
Posted in QTS Fayetteville