CyrusOne Inc, incorporated on July 31, 2012, is an owner, operator and developer of enterprise-class, carrier-neutral, multi-tenant datacenter properties. CyrusOne's data centers are purpose-built facilities.
The CyrusOne National IX Platform (the National IX Platform) delivers interconnection across states and between metro-enabled sites within the CyrusOne footprint and beyond. The platform enables data transfer and accessibility for customers by uniting all of the Company’s data centers. CyrusOne’s portfolio is located in several domestic and international markets. It has domestic properties in Chicago, Dallas, Houston, Phoenix, San Antonio and Cincinnati.
July 2010: Cincinnati Bell acquires CyrusOne [r3]
Jan 2013: CyrusOne IPO [r2]
July 2014: Acquired Cervalis [r1]
r1. Businesswire link July 1, 2015
r2. NASDAQ.com link Jan 18, 2013
r3. CyrusOne PR link
68 Facilities Owned
26 Markets Served
░░░░░░ Login to view MW Total Power
Facility is located 30 minutes north of downtown Cincinnati
The facility will ultimately deliver 29,350 sq m (315,928 sq ft) of technical space with an IT load of 54 MW, in two separate buildings, one of three storeys and one of two storeys.
The site is located 15 minutes from Greater Cincinnati and the Northern Kentucky International Airport.
Located near CyrusOne’s first San Antonio facility, the new site will have up to 196,000 colocation square feet (CSF) and 20,000 sq. ft. of superior Class A office space that can be used by customers.
CyrusOne acquired this 45-acre plot of land in Quincy in 2016, but has yet to build anything on it, waiting until it closes a tenant for the site before Cyrus invests in construction.
The 45-acre campus can expand to a total of 930,000 square feet with 720,000 colocation square feet with up to 120,000 square feet for class A office space.
Phase 1 is 50,000 gross sqft at full build out the facility will have 330,00 gross sqft. The total building's sqft is 430,000sqft and sits on 22.5 acres
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
The London II datacenter was originally built by Infinity SDC.
Construction is expected to start in April 2024.
Although the data center is in Florence Kentucky, it is close to downtown Cincinnati.
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building with a total IT load of 18 MW.
The project will have three phases. The first phase of CyrusOne's planned Allen data center would be 350,950 square feet. Two additional phases would add a 619,100 square foot and a 412,800 square-foot building.
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
CryusOne is located within Digital Realty's facility at 29A International Business Park
This campus is designed for 3 buildings, each of them being two stories with capacity for 18MW
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
The facility was previously known as Zenium Frankfurt Two.
In September 2023, Cyrusone acquired more than 25 acres nearby at 15355 Lambda Drive to construct two data centers, designated SAT10 and SAT11.
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
The Lebannon data center is located on 123 acres, 30 minutes Northeast of downtown Cincinnati.
In February 2017 CyrusOne acquired this site from Sentinel Data Centers.
Located next to Microsoft's data center.
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
Name | Date Added | Description |
---|---|---|
cyrusone_1q_19_earnings_presentation | May 2019 |
CyrusOne Q1 2019 Investor Presentation |
cyrusone_scalable-platform-for-financial-service-companies-4q16-2 | February 2018 | |
cyrusone_corpbro_18-dec_km | January 20218 |
CyrusOne Corporate Brochure |
zenium_data_centers_overview_2017 | July 2017 |
Zenium Company Overview from 2017 |