CyrusOne Photos

CyrusOne Data Center Photos


The data center is sandwiched between Tierpoint and Cisco Systems data centers
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Spartan decor, but functional
The data center was acquired in April 2016
The buildings and next to each other
From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, ...
The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a ...

aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Posted in CyrusOne Northern Virginia Sterling I, II, III
Source: CyrusOne
The data center is sandwiched between Tierpoint and Cisco Systems data centers
Location of New CONE Data Center in Allen
Posted in CyrusOne Allen

The data center is sandwiched between Tierpoint and Cisco Systems data centers

Carrollton Facility at Twilight
Posted in CyrusOne Carrollton
Source: CyrusOne
Construction Almost Complete in 2013
Posted in CyrusOne Chandler Phoenix Campus
Source: Bergelectric
First Chandler Facility Under Construction in 2012
Posted in CyrusOne Chandler Phoenix Campus
Source: Bergelectric
Data Hall
Posted in CyrusOne Chandler Phoenix Campus
Source: CyrusOne
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Energy Labs HVAC Cooling System
Posted in CyrusOne Chandler Phoenix Campus

Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection

Source: CyrusOne
The Architectural Beautiful Entrance to CyrusOne's Chandler Facility
Posted in CyrusOne Chandler Phoenix Campus
Source: JE Dunn
Elegant Lobby
Posted in CyrusOne Chandler Phoenix Campus
Source: JE Dunn
Drop Ceiling
Posted in CyrusOne Chandler Phoenix Campus
Source: JE Dunn
Spartan decor, but functional
Lobby for Building #4
Posted in CyrusOne Chandler Phoenix Campus

Spartan decor, but functional

Building #4 Rooftop Mechanical
Posted in CyrusOne Chandler Phoenix Campus
The data center was acquired in April 2016
Aurora I Facility
Posted in CyrusOne Chicago Aurora CME

The data center was acquired in April 2016

Source: CyrusOne
Rendering of Aurora II
Posted in CyrusOne Chicago Aurora CME
Source: CyrusOne
The buildings and next to each other
CME Campus Layout
Posted in CyrusOne Chicago Aurora CME

The buildings and next to each other

Source: CyrusOne
The Carrollton Site Layout
Posted in CyrusOne Carrollton
Source: CyrusOne
London One at 12 Liverpool Road
Posted in CyrusOne London I
Source: CyrusOne
London 2 at the Prologis Business Park in Hayes
Posted in CyrusOne: London II
Source: CyrusOne
Vestiges of the Zenium Pink Branding
Posted in CyrusOne: London II
Source: CyrusOne
Rendering of Cyrus's Third Data Center in Slough
Posted in CyrusOne London III
Source: CyrusOne
Rendering of Cyrus's 3rd Data Center in Frankfurt
Posted in CyrusOne Frankfurt III
Source: CyrusOne
Norwalk Generators
Posted in CyrusOne Norwalk
Source: CONE
Outside of 6 Norden Place in Norwalk
Posted in CyrusOne Norwalk
Source: CONE
Lombard Site Floor Plan
Posted in CyrusOne Chicago Lombard
Source: CyrusOne
Front of the Facility
Posted in CyrusOne Chicago Lombard
Source: CONE
Facility at 7190 Industrial Rd in Florence
Posted in CyrusOne Kentucky
Source: CyrusOne
Facility Entrance
Posted in CyrusOne Somerset
CONE's facility at 155 Myers Corners Rd in Wappingers Falls
Posted in CyrusOne Wappingers Falls
Source: CyrusOne
Long Brick Facade of the Wappingers Falls Data Center
Posted in CyrusOne Wappingers Falls
Site Layout in Durham
Posted in CyrusOne Raleigh-Durham I
Source: CyrusOne
CONE facility at 2223 Northeast Creek Parkway in Durham
Posted in CyrusOne Raleigh-Durham I
Stack Plan at 7th Street Data Center
Posted in CyrusOne Cincinnati 7th Street
Source: CyrusOne
Cincinnati Bell Building was built in an Art Deco style
Posted in CyrusOne Cincinnati 7th Street
CONE facility at 11500 Goldcoast Drive in Cincinnati
Posted in CyrusOne Cincinnati-Goldcoast
Mason Facility
Posted in CyrusOne Cincinnati-Mason
Source: CONE
Lebanon Floor Plan
Posted in CyrusOne Cincinnati-Lebanon
Source: CyrusOne
Zenium branded exterior before CyrusOne rebranded the facility
Posted in CyrusOne London II (Stockley Park)
London Two, post rebranding
Posted in CyrusOne London II (Stockley Park)
Aerial Rendering of CyrusOne's third data center in FRA
Posted in CyrusOne Frankfurt III
CONE FRankfurt 2 Site
Posted in CyrusOne Frankfurt II
Frankfurt I Facility
Posted in CyrusOne Frankfurt I
Source: CyrusOne
Zenium Frankfurt One before rebranding
Posted in CyrusOne Frankfurt I
Floor Layout of CyrusOne's Frankfurt II Building
Posted in CyrusOne Frankfurt II
Source: CyrusOne
Zenium Topping Out Ceremony of their 2nd Facility in FRA
Posted in CyrusOne Frankfurt II
Source: Zenium
Second Zenium Facility Under Construction
Posted in CyrusOne Frankfurt II
Source: Zenium
High level rendering of Dublin I facility
Posted in CyrusOne Dublin Grange Castle
Source: CyrusOne
Exterior of 9500 Westover Hills Blvd in San Antonio
Posted in CyrusOne San Antonio II
Source: CyrusOne
San Antonio II
Posted in CyrusOne San Antonio II
Source: CyrusOne
Rendering of the proposed CyrusOne Quincy Facility
Posted in CyrusOne Quincy
Data Center at 9999 Westover Hills Blvd, San Antonio
Posted in CyrusOne San Antonio I
Source: CyrusOne
From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, ...
Allen data center ground breaking in October 2017
Posted in CyrusOne Allen

From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, EVP, Operations, Design & Construction, Allen Mayor Stephen Terrell, Robert Jackson, General Counsel, Peter Vargas, City Manager Dan Bowman, Executive Director/CEO, AEDC Danny Cowser, Director, Construction & Design

Exterior of the Massive facility
Posted in CyrusOne Allen
New Colocation Room ready for a deployment (Nov 2018)
Posted in CyrusOne Allen
Source: CyrusOne
The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a ...
Carrollton Amenities
Posted in CyrusOne Carrollton

The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a putting green.

Rock Climbing Wall and Putting Green
Posted in CyrusOne Carrollton
Source: CyrusOne
Rendering of CyrusOne's 4th facility in Frankfurt that was announced in July 2020
Posted in CyrusOne Frankfurt IV
Source: CyrusOne
Rendering of CONE's newest site in Iowa
Posted in CyrusOne Council Bluffs