DataBank Phoenix PHX1

3110 N Central Ave Phoenix

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The site is a former zColo (Zayo) facility.

Network Providers:


CenturyLink
Cogent Comm.
Cox Comm.
Integra Telecom
Level 3
Salt River Project
Level3 (TW Telecom)
XO
Zayo

Map and Nearby Locations:

3110 N Central Ave Phoenix (Suite B75)
Click Map to begin Search

Sites within 15 miles of DataBank Phoenix PHX1

Show SqM
Distance Site About
0.55 miles Lumen Phoenix 2
0.67 miles eBay Arizona
eBay's data center is also known as Project Mercury.
2.23 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
2.23 miles XO: 120 Van Buren
2.23 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
2.23 miles AIS Van Buren (VBDC)
3.42 miles Lumen Phoenix 1
3.42 miles GoDaddy: Gilbert, AZ
3.42 miles Windstream Phoenix
3.46 miles CenturyLink: 811 S. 16th
4.58 miles Stack: PHX02 Building 5
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.69 miles Stack: PHX02 Building 4
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.74 miles Stack: PHX02 Building 2
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.77 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.83 miles Stack: PHX02 Building 3
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.84 miles QTS Phoenix
QTS expansion with an 84-acre campus with 5 planned buildings with 280 MW of critical power
6.01 miles Blue Cross Blue Shield Phoenix
6.01 miles Expedient Phoenix
The site was originally a build-to-suit Tier-III data center for Blue Cross commissioned in 2010, the data center is part of a complex of Blue Cross-occupied facilities
6.02 miles Internap Phoenix
6.02 miles redIT Phoenix
6.02 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
6.04 miles Cyxtera Phoenix PH1
6.04 miles PhoenixNAP-Phoenix
6.06 miles DataBank PHX2
6.09 miles XO: 3930 Watkins
8.62 miles EdgeConneX Phoenix
9.33 miles OneNeck Phoenix 2
9.48 miles Liquid Web Phoenix
12.25 miles VPLS PX1
12.25 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
12.25 miles Evocative: Phoenix PHX1
Evocative's PHX1 data center facility is located at 2500 W Union Hills Dr, Phoenix. Spanning an impressive 550000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
12.81 miles Aligned: PHX-08
12.87 miles Aligned: PHX-07
13.17 miles Evoque PHX1
13.26 miles 20435 N 26th
13.59 miles Cybertrails Phoenix
13.89 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
13.92 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
14.12 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
14.45 miles Prime Phoenix
15.15 miles LexisNexis Scottsdale
15.15 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
15.15 miles Cyxtera Phoenix PH2
16.38 miles Microsoft El Mirage
16.71 miles Internap Phoenix 2500 W Frye Rd
The site was launched in 2018 in conjunction with Lincoln Rackhouse, Internap's landlord
16.71 miles 2500 W Frye
16.82 miles STACK Phoenix
Stack Infrastructure (Stack) is planning to build a 150MW data center on a 79-acre site in Phoenix, Arizona.
16.84 miles OneNeck Phoenix 1
17.01 miles Stream Goodyear AZ
Phoenix I is the first of five 40MW buildings.
17.50 miles Vantage Phoenix
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a 160MW mega-scale data center campus. Construction began in early 2019, with the first 32MW phase coming online in 2022.
17.60 miles Compass Phoenix
17.63 miles Microsoft PHX11
17.63 miles Microsoft PHX10
17.83 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
17.99 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
18.04 miles redIT Chandler
18.04 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
18.27 miles CyrusOne PHX9
18.34 miles CyrusOne PHX10
18.37 miles CyrusOne PHX3
18.37 miles CyrusOne PHX2
18.43 miles Aligned: PHX-04
Construction began in July 2022.
18.46 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
18.47 miles CyrusOne PHX1
18.47 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
18.52 miles CyrusOne PHX5
18.57 miles CyrusOne PHX4
18.61 miles CyrusOne PHX6
18.64 miles CyrusOne PHX8
18.72 miles CyrusOne PHX7

DataBank Phoenix PHX1 Data Center Photos

Operating Company

In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently

Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.

68 Facilities Owned
28 Markets Served
330.42 Megawatts
View Company

News

Read More News