Verizon London UK4

Central Way

Operated by:

Map and Nearby Locations:

Central Way (Skyways Building in the North Feltham Trading Estates)
Click Map to begin Search

Sites within 15 miles of Verizon London UK4

Show SqM
Distance Site About
0.65 miles Redcentric Hounslow
2.20 miles ServerFarm London
3,000 m² of data hall expansion space available within 6 – 9 months Concurrently maintainable standards
2.42 miles VIRTUS Hayes London2
2.70 miles DRT London (West Drayton)
2.80 miles Ark: Union Park
3.36 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
3.37 miles CyrusOne: London II
3.98 miles VIRTUS Stockley Park Campus
LONDON6 was opened
5.57 miles Redwire
6.15 miles Barclays Data Centre
7.51 miles Equinix London LD3
7.75 miles Zayo Egham
7.83 miles Vantage London II
7.98 miles Yondr Slough
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
8.09 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
8.12 miles DRT London (Chessington)
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
8.15 miles Vantage London I Campus
8.15 miles Options West London
8.17 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
8.45 miles 4D Surrey
Based in Byfleet, 4D's Tier-3 Surrey data centre is close to M25 and about 30 minutes to London Waterloo. It's carrier neutral and offers u-space, quarter, half and full racks with options for data halls and suites.
9.62 miles Ark: Longcross
9.74 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
9.75 miles Kao Data Slough
9.76 miles NTT Slough 2
9.88 miles GTR Slough
The campus will comprise of three independent data centres capable of operating individually, or as one interlinked campus,
9.91 miles VIRTUS LONDON9
9.96 miles Level3 Slough
9.96 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
9.98 miles GoDaddy Slough (HEG)
10.02 miles Cyxtera Slough LO5
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
10.04 miles Logicalis Slough
10.05 miles VIRTUS LONDON10
10.13 miles Iron Mountain London LON-2
10.15 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
10.15 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
10.16 miles VIRTUS London 11
10.16 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
10.18 miles Equinix LD10
10.18 miles Equinix LD13x
10.32 miles China Mobile Slough
10.40 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
10.40 miles QTS London
10.43 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
10.60 miles Visa United Kingdom
10.63 miles Equinix LD14
10.63 miles Equinix LD12
10.67 miles LDeX London LDeX1
10.69 miles Equinix LD6
10.71 miles Equinix LD7
10.71 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
10.71 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
10.77 miles Equinix LD11x
11.81 miles Zenium London One
12.12 miles Redcentric Woking TC3
12.12 miles NaviSite Woking
12.20 miles CyrusOne London Woking
12.20 miles Digital Realty Woking
12.69 miles DRT London (Chess Building)
12.80 miles DRT London (Croydon)
12.91 miles aptum London
12.95 miles Verizon London UK5
13.19 miles Pulsant Maidenhead P1
13.64 miles Level3 London (10 Fleet)
13.91 miles Volta EC1
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
13.98 miles Level3 London (Goswell)
14.42 miles iomart DC5 Maidenhead
14.52 miles Pulsant South London
14.52 miles 1 Olivers Yard - Digital Realty
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
14.58 miles iomart DC2 London
14.61 miles Telehouse London Metro
14.62 miles Epsilon London Telephone House
14.65 miles Redcentric London
14.76 miles Netwise London Central
14.81 miles Colt House London
14.91 miles Level3 London (Braham)
14.98 miles Interxion LON1 LON3
15.02 miles Level3 London (120 Leman)
15.06 miles Interxion London 2
15.08 miles Internap London
15.40 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
15.45 miles Colt London I
15.61 miles Level3 Bracknell
16.39 miles Coreix Docklands
16.89 miles AIMES DC3 Mastmaker Road
16.93 miles Cyxtera London LO3 & LO4
16.94 miles Keppel GV7 London
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
16.94 miles Echelon LCY10
16.95 miles DRT London (Bonnington House)
16.95 miles City Reach London Docklands
16.99 miles Digital Docklands: Cloud House
17.06 miles GTT London Citi
17.15 miles Equinix London LD8 Harbour Exchange (Docklands)
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
17.29 miles Digital Meridian Gate (215 Marsh)
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
17.32 miles Digital Sovereign House (227 Marsh Wall)
17.58 miles Infinity SDC HereEast
17.66 miles Level3 London (E India Dock)
17.72 miles Telehouse South
17.76 miles GTT London GS2
17.77 miles Global Switch London Docklands Campus
17.80 miles Telehouse London Docklands (North, East, West)
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
17.81 miles Verizon London THW
18.25 miles Digital Redhill (Foxboro Park)
1 Foxboro Park, Redhill is fully leased
2 Foxboro Park, Redhill is fully leased
18.29 miles LexisNexis Redhill UK
19.22 miles Ark: Meridian Park
19.24 miles DRT London (Cresses Business Park)
19.28 miles Echelon LCY20
19.44 miles Coreix Enfield

Verizon London UK4 Data Center Photos

Operating Company

86 Facilities Owned
59 Markets Served
39.41 Megawatts
View Company

News

Read More News