T5 Chicago II

200 Innovation Drive

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

200 Innovation Drive
Click Map to begin Search

Sites within 15 miles of T5 Chicago II

Show SqM
Distance Site About
0.60 miles Prime Elk Grove
0.86 miles Aligned: ORD-03
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
1.16 miles CenturyLink: Arlington Heights
1.21 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
1.26 miles CloudHQ Mount Prospect ORD3
1.27 miles STACK Chicago CHI01
1.38 miles CoreWeave: US Central ORD1
1.83 miles Equinix Chicago CH3
1.85 miles Stream Chicago I
1.87 miles Stream Chicago II
1.89 miles EdgeConneX CHI02
1.97 miles Edgeconnex Chicago Campus
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
1.98 miles EdgeConneX CHI01
2.09 miles 1450 E Devon Ave (CH3) DRT
2.09 miles Skybox Chicago I
2.11 miles ColoCrossing CH1
2.11 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
2.11 miles ServerCentral CH1
2.12 miles Rackspace Elk Grove ORD1
2.12 miles 2200 Busse Rd (CH1) DRT
2.18 miles 2299 Busse (CH2) Digital Realty
2.32 miles Cyxtera Elk Grove CH3
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
2.84 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
2.88 miles NTT: 1200 N Arlington Heights (Planned)
Expansion site acquired in November 2023.
3.14 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
3.36 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
3.51 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
4.50 miles DataBank ORD3 Mount Prospect
4.50 miles Colocation America CH3
4.84 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
5.39 miles Complete Source Schaumburg
6.87 miles T5 Northlake IL
7.61 miles Microsoft Chicago Northlake
7.88 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
8.15 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~72 MW of critical load.
8.18 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
8.82 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
8.83 miles 9377 Grand Ave
8.86 miles 9355 Grand Ave
8.91 miles SingleHop Chicago
8.91 miles 9333 Grand Ave (DRT)
8.94 miles Tierpoint Chicago West
9.04 miles Microsoft Hoffman Estates 2
9.06 miles Microsoft Hoffman Estates 1
12.05 miles LexusNexis Oak Brook
12.05 miles XO (Swift Dr)
12.05 miles DataBank (ORD4) Oak Brook
12.25 miles Digital Fortress: Chicago Lombard
12.25 miles 360TCS-Lombard
12.38 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
12.39 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
12.39 miles XO: (Oak Brook)
12.39 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
12.45 miles NYI Chicago (Oak Brook)
13.11 miles Lumen Broadview
13.28 miles Compass Hoffman Estates
14.59 miles Equinix Chicago CH7
14.59 miles Verizon Chicago (Downers Grove)
16.50 miles Evoque Lisle CH1
17.45 miles New Continuum: 603 Discovery
17.56 miles Cogent Naperville
18.59 miles NetSource Chicago
18.89 miles Metro Edge: Illinois Medical District (IMD)
18.98 miles Lumen Chicago 2
19.09 miles Lumen Chicago 4
19.71 miles Lumen Chicago 1
19.71 miles GTT - 111 North Canal
19.85 miles Lumen Chicago 6
19.92 miles Lumen Chicago 3
19.97 miles TierPoint Chicago Polk
19.99 miles First Communications Chicago

T5 Chicago II Data Center Photos


Outside of T5's 2nd facility in Chicago

Operating Company

T5 Data Centers, an Atlanta-based data center provider that specializes in offering wholesale data center space. T5 has data centers in Atlanta, Charlotte, Colorado, Dallas, Los Angeles, and New York markets

12 Facilities Owned
11 Markets Served
66.45 Megawatts
View Company

News

Read More News