SingleHop Chicago

9333 Grand Ave

Operated by:

Map and Nearby Locations:

9333 Grand Ave
Click Map to begin Search

Sites within 15 miles of SingleHop Chicago

Show SqM
Distance Site About
0.00 miles 9333 Grand Ave (DRT)
0.05 miles 9355 Grand Ave
0.06 miles Tierpoint Chicago West
0.12 miles 9377 Grand Ave
0.16 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
1.99 miles T5 Northlake IL
2.77 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
3.12 miles Microsoft Chicago Northlake
3.13 miles Aligned Chicago ORD-01
3.14 miles Aligned ORD-02
5.00 miles Lumen Broadview
5.87 miles Iron Mountain Chicago
Iron Mountain is planning a (but not yet constructed facility in Chicago.)
5.97 miles DataBank (ORD4) Oak Brook
5.97 miles XO (Swift Dr)
5.97 miles LexusNexis Oak Brook
6.38 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
6.38 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
6.78 miles Cyxtera Elk Grove CH3
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
6.90 miles 2299 Busse (CH2) Digital Realty
6.94 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
6.94 miles EdgeConneX CHI01
6.94 miles XO: (Oak Brook)
6.94 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
6.95 miles Edgeconnex Chicago Campus
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
7.04 miles EdgeConneX CHI02
7.04 miles Rackspace Elk Grove ORD1
7.04 miles 2200 Busse Rd (CH1) DRT
7.06 miles ColoCrossing CH1
7.06 miles ServerCentral CH1
7.06 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
7.07 miles Stream Chicago I
7.08 miles NYI Chicago (Oak Brook)
7.11 miles Equinix Chicago CH3
7.13 miles Stream Chicago II
7.14 miles 1450 E Devon Ave (CH3) DRT
7.52 miles Skybox Chicago I
7.72 miles STACK Chicago CHI01
7.81 miles CoreWeave: US Central ORD1
7.81 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
8.49 miles Prime Elk Grove
8.59 miles NTT: 1200 N Arlington Heights (Planned)
Expansion site acquired in November 2023.
8.63 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
8.69 miles CenturyLink: Arlington Heights
8.75 miles CloudHQ Mount Prospect ORD3
8.86 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
8.91 miles T5 Chicago II
9.38 miles 360TCS-Lombard
9.38 miles Digital Fortress: Chicago Lombard
9.83 miles Equinix Chicago CH7
9.84 miles Verizon Chicago (Downers Grove)
10.28 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
10.39 miles Metro Edge: Illinois Medical District (IMD)
10.89 miles Colocation America CH3
10.89 miles DataBank ORD3 Mount Prospect
11.19 miles Lumen Chicago 2
11.28 miles Lumen Chicago 4
11.45 miles QTS Chicago
The campus was a former Sun Times Press Facility and was acquired in 2014
11.68 miles GTT - 111 North Canal
11.68 miles Lumen Chicago 1
11.75 miles TierPoint Chicago Polk
11.76 miles First Communications Chicago
11.84 miles Lumen Chicago 6
11.91 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
11.91 miles DataBank (ORD2) 840 S Canal
11.95 miles Lumen Chicago 3
12.03 miles Cogent: 216 W Jackson
12.07 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
12.20 miles GTT - 717 South Wells
12.20 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
12.21 miles Atlantic Metro ORD3
12.21 miles Steadfast Chicago 725 Wells
12.21 miles Colo@ Chicago
12.21 miles Crown Castle 725 S Wells
12.21 miles 725 S Wells - 1547 Critical Systems
1547 Acquired the site in December of 2018.
12.22 miles QuadraNet Chicago
12.22 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
12.22 miles Cogent: 427 S LaSalle
12.22 miles InfoRelay Chicago
12.22 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
12.24 miles XO: 140 S Dearborn
12.33 miles Colocation America CH2
12.33 miles Cogent: 600 S Federal
12.33 miles Lumen Chicago 5
12.33 miles 600 S Federal - Digital Realty
13.37 miles Cyxtera Chicago CH2
Within DRT's Cermak carrier hotel
13.37 miles Steadfast Chicago 350 E Cermak
13.37 miles 350 E Cermak - Digital Realty
13.37 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
13.37 miles Cyxtera Chicago CH4
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
13.37 miles Atlantic Metro ORD0
13.37 miles Colocation America CH1
13.38 miles ServerCentral Chicago DRT-CH1
14.01 miles Complete Source Schaumburg
14.87 miles Evoque Lisle CH1
15.15 miles 1547 Chicago Midway Technology Centre
16.96 miles Cogent Naperville
17.50 miles Microsoft Hoffman Estates 2
17.59 miles Microsoft Hoffman Estates 1
19.06 miles NetSource Chicago

SingleHop Chicago Data Center Photos

Operating Company

Internap Corporation (NASDAQ: INAP) is a provider of data center services including colocation, managed hosting, cloud and network services. The company is headquartered in Atlanta, Georgia, United States with company-controlled data centers located in North America, EMEA, and APAC.

Internap History:

Internap was founded in 1996 and initially headquartered in Seattle. During the dot-com bubble, the company was smart to go public. The Initial Public Offering (IPO) took place in 1999 on the NASDAQ with the symbol INAP. Internap sold 9.5 million shares at $20 apiece, and the stock climbed as high as $73 before closing just below $53.

2002

INAP relocated its headquarters from Seattle to Atlanta.

2000

INAP acquired CO Space, Inc which provided the company with its data center offering.

2012

Acquired Voxel for $35 million in cash. Voxel provided on-demand dedicated hosting and cloud services to enterprises and Web-centric businesses. Voxel had more than 1,000 customers and has approximately 50 employees.

2013

Acquired iWeb, a Montreal-based web hosting and colocation services provider, for $145 million.

2016

In September, Peter D. Aquino became the CEO of Internap. Aquino replaced Mike Ruffolo who's short tenure lasted from May 2015 to September 2016.

2018

  • In January, INAP acquired SingleHop, a IaaS provider for $132 million in cash.
  • In March the company announced it was moving its headquarters to Virginia. Atlanta will continue to serve as local operations and staff headquarters, while the new official corporate headquarters will be located in the Virginia office. The new Virginia HQ will “INAP's corporate headquarters will be a small group in charge of capital allocation, strategic direction, and external affairs.”
26 Facilities Owned
27 Markets Served
27.0 Megawatts
View Company

News

Read More News