Site: RagingWire Chicago CH1

Company: RagingWire
Metro: Chicago
State: Illinois
Country: United States
Region: North America
Address: 755 Pierce Road, Itasca, IL 60143
Gross SqFt: 245,000
Total Power: 16.0 Megawatts

RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago. RagingWire is planning to begin construction of CH1 later in 2018. The two-story Chicago CH1 Data Center will be built in three phases. The first phase, comprising 245,000 square feet space and 16 megawatts of critical power, will have eight 2MW vaults with flexible configuration and dedicated infrastructure options.

Map:

755 Pierce Road, Itasca, IL 60143

SITES within 15 miles of RagingWire Chicago CH1

Distance Site name SqFt MW
2.27 miles SunGard Wood Dale (341) 44,520
2.31 miles SunGard Wood Dale (711) 150,000
2.38 miles ServerCentral CH1 18,000 2.60
2.38 miles ColoCrossing CH1 10,000
2.38 miles DRT Chicago Campus (CH1/CH2/CH3) 548,766 87.60
2.4 miles Rackspace Elk Grove ORD1 96,232 15.60
2.58 miles 2299 Busse (CH2) Digital Realty 7.10
2.59 miles Cyxtera Elk Grove CH3 163,747 17.60
2.6 miles T5 Chicago 12.00
2.88 miles Equinix Chicago CH3 272,103 10.80

Files


No Files

No Posts