QTS Hillsboro 1

4951 NE Huffman St

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

QTS is constructing a massive datacenter on a 92 acre campus in Hillsboro. At full build out the campus will have 108MWs of critical power capacity and 10.8MW critical power per data hall.

Map and Nearby Locations:

4951 NE Huffman St
Click Map to begin Search

Sites within 15 miles of QTS Hillsboro 1

Show SqM
Distance Site About
0.12 miles QTS Hillsboro 2
0.20 miles QTS Hillsboro 3
0.26 miles QTS Hillsboro 4
0.36 miles QTS Hillsboro 5
0.49 miles Flexential Portland - Hillsboro 3
0.53 miles Flexential Hillsboro 2
The site houses the U.S. cable landing station for the Hawaiki submarine cable, which delivers “low-latency” connection between the continental U.S., Hawaii, Australia, New Zealand and American Samoa.
0.58 miles CoreWeave: Hillsboro, OR
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
0.58 miles STACK Portland POR03
STACK Infrastructure is constructing a new data center facility named POR03A at 4735 NE Starr Blvd, Hillsboro, OR. The data center will boast a substantial footprint of 180000 square feet.
0.62 miles T5 Portland
0.63 miles Flexential Hillsboro 4
0.65 miles Stack: POR03B
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building B, in Hillsboro with a substantial footprint of 180000 square feet.
0.66 miles Stack: PORT03 Future Expansion
STACK Infrastructure is planning to extend their data center campus PORT03 at 4735 NE Starr Blvd, in Hillsboro
0.68 miles Adobe Hillsboro
0.72 miles Stack: POR03C
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building C, in Hillsboro with a substantial footprint of 180000 square feet.
0.74 miles EdgeConneX POR03
0.79 miles NTT Hilsboro HI1
The 144MW site will consist of five buildings with a total space of 1 million sq ft (93,000 sq m).
0.81 miles EdgeConneX Portland
0.88 miles NTT HI2
1.12 miles Aligned Hillsboro PDX-01
1.30 miles EdgeConnex POR2
1.65 miles STACK Portland POR02
1.68 miles Opus Interactive Hillsboro
1.84 miles Tata Hillsboro
1.89 miles Intel Hillsboro, HF2-DC201
1.90 miles 3825 NW Aloclek Hillsboro - Digital Realty
1.90 miles Flexential Hillsboro 1
The Hillsboro sites are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
2.21 miles OVH Hillsboro, Oregon: HIL-1
6.78 miles Lumen Portland 3
The site is a former tw telecom operated facility.
8.10 miles Rowan: Meriwether, Portland, OR
Rowan Data Centers has announced plans for a campus in Forest Grove, Portland, OR. Preliminary plans for the Project Meriwether development call for 150 MW of capacity.
9.32 miles Lunavi Portland
9.33 miles Atmosera DC1 DC2
9.92 miles XO: Beaverton
11.55 miles SpireTech
11.88 miles Lumen Portland I
11.95 miles H5 Portland
vXchnge acquired the site from SunGard in 2015. In 2017 the NWAX peering Exchange deployed to vXchnge Portland.
12.07 miles Opus Interactive Portland
12.07 miles Tata Portland (Brewery Block)
The Portland Brewery Blocks data center was purposely built by it’s previous owner, Tycom to serve as an endpoint for it’s high-capacity, undersea fiber cable linking the US with Asia.
12.18 miles Atmosera DC3
12.23 miles Pittock Internet Exchange
The Pittock building is Portland's carrier hotel, which has the second greatest density of networks and carriers in the Pacific Northwest (2nd to the Westin Building in Seattle.)
12.31 miles Lumen Portland 2
Located in the Union Bank Building
12.37 miles LightPoint Portland

QTS Hillsboro 1 Data Center Photos


Rendering of QTS Hillsboro

Large Content Company Data Centers in Rural Oregon
Posted in Oregon
Source: Dan Aguayo - The Oregonian

Operating Company

Company History:


  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
  • 2003: Company acquired first data center in Overland Park, KS
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2010 Acquired their Richmond facility
  • 2013: When public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2014 Expanded with Chicago and Princeton data centers
  • May 2015: QTS acquires Carpathis Hosting for $326 million. [1] The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities. [2] [3]

Headquarters:


QTS maintains three different operational headquarters. The corporate headquarters are in Overland Park, KS. The operational headquarters are in Suwanee, GA. Carpathia headquarters have remained in Dulles, VA to better serve government clients.

References:


1. PR Newswire May 6, 2015
2. The Whir article July 5, 2012
3. The Whir article Feb 28, 2011

50 Facilities Owned
22 Markets Served
930.0 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
qts_data_sheet_hillsboro_dc1 January 2020

QTS Hillsboro DC1 Data Sheet (PDF)

qts_data_sheet_hillsboro_dc1-4127411e-07e5-474d-b5ff-eac45641593b June 2022

Hillsboro Data Sheet (PDF)