Prime Sacramento

2407 AK Street

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Located within Building One, the single-story structure was completed in 2019. The data center comes with a usable floor space of around 40,000 sq ft (3,700 sq m) and is designed for a cabinet density up to 35kW.

The center is also the first of several approved facilities on the 38-acre (16,500 sq ft) campus to be finished and available for Prime's clients. It plans to build 20MW, 30MW, and 50MW facilities in phases.

A dedicated 50MVA sub-station is on-site, and Prime says it has the ability to add another 100MVA.

The Prime data center campus is located on 38 acres in the McClellan Park. Prime received $1.2 million in tax credits from a committee of the Governor’s Office of Business and Economic Development.

Power

  • Provider: SMUD; natural gas “peaker” <1 mi.
  • Feeds: (2) 69kV; fed from Elverta & Hurley
  • Substation: Dedicated and On-site
  • Utility: 45MW currently, 90+MW capacity
  • UPS Capacity: 6MW
  • UPS Type: VRLA Battery
  • UPS Redundancy: N+1
  • Backup Power Generation: 9MW
  • Generator Redundancy: N+1
  • Fuel Storage: 24 hours; 5,000 gallon belly tank
  • Diesel Re-fuel Station Proximity: <1 mile
  • A+B Feeds on UPS: Yes
  • Power Meter Location: @PDU
  • Cabinet Densities: up to 24kW
  • PDU Redundancy: N+1
  • Design P.U.E.: ~1.2

Map and Nearby Locations:

2407 AK Street
Click Map to begin Search

Sites within 15 miles of Prime Sacramento

Show SqM
Distance Site About
1.64 miles Consolidated McClellan
4.30 miles QTS Sacramento
Located less than 90 miles from San Francisco, this facility offers 46,000 sq. ft. of raised floor space and 9.0 megawatts (MW) of power capacity in seismically-neutral Sacramento.
4.48 miles ANEXIO CA1
ANEXIO's site is located within RagingWire's CA1 site.
4.48 miles RagingWire CA1
4.48 miles RagingWire Sacramento Campus CA1, CA2, CA3
RagingWire's Sacramento's data center campus is split among 3 buildings (CA1, CA2, and CA3)
4.62 miles RagingWire CA2
4.96 miles RagingWire CA3
5.65 miles Lumen Sacramento 2
6.25 miles Lumen Sacramento 3
7.09 miles Lanset
7.68 miles Consolidated Citrus Heights
7.72 miles Lumen Sacramento 1
7.77 miles Cerulean II Rancho Cordova
7.83 miles EdgeConneX Sacramento
7.95 miles 365 Rancho Cordova, CA
8.08 miles 3065 Gold Camp
8.10 miles Dept of Technology Rancho Cordova
The California Department of Technology (CDT) data centers serve as the Tier III equivalent data centers for State, county, federal and local government entities throughout California.
10.77 miles XO: 1390 Lead Hill

Prime Sacramento Data Center Photos


Site Overview for Building One on Prime's Campus
Source: Prime Data Centers
Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs
The Prime Campus Will be Built in Three Phases

Phase I is 15 MWs
Phase 2 will be 30 MWs
Phase 3 will be up to 45 MWs

Source: Prime Data Centers

Rendering of Prime's LAX-01 facility
Posted in Prime Data Centers
Source: Prime DC

Operating Company

Prime Data Centers develops, acquires, and operates data centers for large enterprises and hyper-scalers. Through our own properties, customer assets (sale-leaseback), or greenfield developments, Prime delivers build-to-suit, powered-shell and turn-key solutions.

11 Facilities Owned
8 Markets Served
44.0 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
sacramento_brochure_january_2020_prime_data_centers March 2021

McClellan Park Data Sheet (PDF)