Metro Edge: Illinois Medical District (IMD)

South Damen Avenue & West 14th Street

Operated by:

Map and Nearby Locations:

South Damen Avenue & West 14th Street
Click Map to begin Search

Sites within 15 miles of Metro Edge: Illinois Medical District (IMD)

Show SqM
Distance Site About
1.53 miles QTS Chicago
The campus was a former Sun Times Press Facility and was acquired in 2014
1.80 miles TierPoint Chicago Polk
1.81 miles CoreSite Chicago CH2
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
1.81 miles First Communications Chicago
1.93 miles DataBank (ORD2) 840 S Canal
1.93 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
2.30 miles 725 S Wells - 1547 Critical Systems
1547 Acquired the site in December of 2018.
2.30 miles Steadfast Chicago 725 Wells
2.30 miles Crown Castle 725 S Wells
2.30 miles Colo@ Chicago
2.30 miles Atlantic Metro ORD3
2.31 miles GTT - 717 South Wells
2.31 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
2.37 miles GTT - 111 North Canal
2.37 miles Lumen Chicago 1
2.39 miles Cogent: 216 W Jackson
2.46 miles Cogent: 427 S LaSalle
2.46 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
2.46 miles InfoRelay Chicago
2.46 miles CoreSite Chicago CH1
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
2.47 miles QuadraNet Chicago
2.49 miles Lumen Chicago 6
2.50 miles Cogent: 600 S Federal
2.50 miles Colocation America CH2
2.50 miles Lumen Chicago 5
2.50 miles 600 S Federal - Digital Realty
2.65 miles XO: 140 S Dearborn
2.72 miles Lumen Chicago 3
2.88 miles Lumen Chicago 4
2.95 miles Lumen Chicago 2
3.04 miles Steadfast Chicago 350 E Cermak
3.04 miles Colocation America CH1
3.04 miles Cyxtera Chicago CH2
Within DRT's Cermak carrier hotel
3.04 miles 350 E Cermak - Digital Realty
3.04 miles Cyxtera Chicago CH4
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
3.04 miles Equinix Chicago CH1, CH2, & CH4
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
3.04 miles Atlantic Metro ORD0
3.05 miles ServerCentral Chicago DRT-CH1
5.42 miles 1547 Chicago Midway Technology Centre
9.40 miles Lumen Broadview
10.34 miles Tierpoint Chicago West
10.39 miles SingleHop Chicago
10.39 miles 9333 Grand Ave (DRT)
10.42 miles 9355 Grand Ave
10.42 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
10.43 miles 9377 Grand Ave
12.62 miles DataBank (ORD4) Oak Brook
12.62 miles XO (Swift Dr)
12.62 miles LexusNexis Oak Brook
12.74 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
12.86 miles Aligned ORD-02
12.88 miles Aligned Chicago ORD-01
13.14 miles Microsoft Chicago Northlake
13.29 miles T5 Northlake IL
13.39 miles Digital Crossroad (Indiana NAP)
The facility (DX-1) is a 105,000 square foot, 20-Megawatt (MW) data center located on the former State Line Generating Plant, Hammond, IN.
13.57 miles Digital Crossroad: Hammond, IN (Phase 2)
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 180,000 sq ft (16,720 sqm) building and 20MW in the second phase.
13.61 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
13.61 miles XO: (Oak Brook)
13.61 miles US Signal Oakbrook
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
13.73 miles NYI Chicago (Oak Brook)
14.65 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
15.67 miles Equinix Chicago CH7
15.67 miles Verizon Chicago (Downers Grove)
16.75 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
16.76 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
17.00 miles Cyxtera Elk Grove CH3
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
17.02 miles EdgeConneX CHI01
17.02 miles Edgeconnex Chicago Campus
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
17.10 miles Digital Fortress: Chicago Lombard
17.10 miles 360TCS-Lombard
17.10 miles 2299 Busse (CH2) Digital Realty
17.12 miles EdgeConneX CHI02
17.13 miles Stream Chicago I
17.22 miles Equinix Chicago CH3
17.26 miles 2200 Busse Rd (CH1) DRT
17.26 miles Rackspace Elk Grove ORD1
17.28 miles ColoCrossing CH1
17.28 miles ServerCentral CH1
17.28 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
17.28 miles Stream Chicago II
17.37 miles 1450 E Devon Ave (CH3) DRT
17.80 miles Skybox Chicago I
17.83 miles STACK Chicago CHI01
17.93 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
17.98 miles CoreWeave: US Central ORD1
18.21 miles CyrusOne Chicago Lombard
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
18.38 miles Prime Elk Grove
18.39 miles CenturyLink: Arlington Heights
18.41 miles CloudHQ Mount Prospect ORD3
18.89 miles T5 Chicago II
18.97 miles NTT: 1200 N Arlington Heights (Planned)
Expansion site acquired in November 2023.
19.00 miles NTT: 1250 N Arlington Heights (Planned)
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
19.25 miles NTT Chicago CH1
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
19.49 miles Colocation America CH3
19.49 miles DataBank ORD3 Mount Prospect

Metro Edge: Illinois Medical District (IMD) Data Center Photos


Rendering of the facility scheduled to be completed in early 2024

Operating Company

Metro Edge is a unique commercial real estate firm focused on high-impact, technology-driven developments. We pursue institutional-quality investment opportunities that deliver exceptional results to our financial and community partners.

1 Facilities Owned
1 Markets Served
0 Megawatts
View Company

Files

Name Date Added Description
imd-dc-spec-sheet_10-22 December 2022

IMD Facility Data Sheet (PDF)