DartPoints Dublin

565 Metro Pl N

░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.

The site spans nearly 55,000 square feet. This includes 5,903 square feet of raised data center floor space, 364 square feet of demarcation locations yielding 200 total rack spaces available in server cabinets.

Power

One of the strengths of the facility is its state-of-the-art power management plan. This begins with fully redundant (2N) active power transmitted through dual electric feeds from two substations provided by American Electric Power.

Electrical wiring to the center is supplied via two unique routes through dual transformers, dual switch gear, and dual 625 KVA-UPS systems, all of which are autonomous in supplying the center’s (2N) power at 480 volts. Single-corded servers get in-rack Automatic Transfer Switches for redundant power.

Cooling

Designers of MDC employed a number of strategies for facility thermal management, including the use of N+1-rated glycol pumping stations and dry coolers and Rittal cold row containment systems. The Rittal solution maximizes cooling per cabinet and raises overall site efficiency. All cooling equipment is supported by generator back up, including seven 30-ton glycol-based air handlers.

Map and Nearby Locations:

565 Metro Pl N (Suite 300)
Click Map to begin Search

Sites within 15 miles of DartPoints Dublin

Show SqM
Distance Site About
0.77 miles Expedient Dublin
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
2.34 miles Amazon: 5113 Hayden Run
2.43 miles Amazon Hilliard: 5109 Hayden Run
2.57 miles Amazon: 5117 Hayden Run
3.71 miles Amazon Dublin OH
3.78 miles Expedient Upper Arlington
6.92 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
6.95 miles Cologix COL3
7.04 miles Cologix Columbus COL4
Cologix plans to build the 287,000-square-foot center on 9 acres along Alta View and Worthington Woods boulevards, next to its original campus on Scherers Court. The new site will be virtually adjacent to the existing campus on Scherers Court, and connected to it by fiber.
7.35 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
8.07 miles Cyxtera Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord
8.71 miles IBM Columbus
10.03 miles WeConnect Westerville
10.08 miles Racksquared 2560 Value Way
10.18 miles eNET Columbus
10.93 miles Lumen: 580 North 4th
11.34 miles Lumen: 266 North 5th
11.36 miles Cogent: 240 North 5th
11.38 miles CityNet Columbus
11.39 miles Lumen: 226 North Fifth
11.39 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
11.53 miles Racksquared 325 E Spring St
11.62 miles Deep Edge: 180 East Broad
11.62 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
11.82 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
16.16 miles CeraNet Columbus
16.68 miles Discover Financial Services New Albany
16.96 miles TJX Corporate Techno
17.02 miles Compass New Albany
17.15 miles Compugen New Albany
17.27 miles Stack: NAL01 Future Expansion
STACK INFRASTRUCTURE plans to expand it's NAL01 campus, located at Souder Road, New Albany, OH. Upon completion, this facility will have an available power capacity of 48 megawatts.
17.43 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
18.26 miles Google Lockbourne, OH
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
19.62 miles Google New Albany Ohio
19.81 miles Compass Groveport AEP II
19.81 miles QTS: New Albany 1 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. The first building of the campus will be located at 1225 Beech Rd SW, New Albany, OH . New Albany 1 will offer 144MW across two facilities.
19.93 miles Amazon New Albany: Jug and Beach Road
19.96 miles QTS: New Albany 2 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC2 will be located at 675 Beech Rd SW, Etna, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
19.97 miles QTS: New Albany 1 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus will be located at 1275 Beech Rd SW, New Albany, OH. The buildings at the first site will reportedly span 885,600 sq ft (82,275 sqm).
20.00 miles QTS: New Albany 2 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC1 will be located at 785 Beech Rd SW, Pataskala, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
20.00 miles Amazon New Albany

DartPoints Dublin Data Center Photos


Inside of MDC in Dublin OH

Operating Company

3 Facilities Owned
0 Markets Served
3.43 Megawatts
View Company