Lumen: 580 North 4th

580 North 4th Street

Operated by:

Map and Nearby Locations:

580 North 4th Street (Suite 100)
Click Map to begin Search

Sites within 15 miles of Lumen: 580 North 4th

Show SqM
Distance Site About
0.45 miles Lumen: 266 North 5th
0.48 miles Cogent: 240 North 5th
0.49 miles CityNet Columbus
0.51 miles WOW! 226 N 5th
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
0.51 miles Lumen: 226 North Fifth
0.61 miles Racksquared 325 E Spring St
0.81 miles US Signal Columbus
DC power w/battery backup available
Multiple diverse power feeds from utility grids
0.81 miles Deep Edge: 180 East Broad
1.10 miles Crown Castle 101 E Town
Crown Castle acquired Lightower in 2017
5.47 miles Racksquared 2560 Value Way
6.54 miles IBM Columbus
7.18 miles Expedient Upper Arlington
7.71 miles CeraNet Columbus
8.11 miles eNET Columbus
8.45 miles Google Lockbourne, OH
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
8.88 miles Compass Groveport AEP II
9.29 miles Amazon: 5117 Hayden Run
9.40 miles Amazon Hilliard: 5109 Hayden Run
9.42 miles Amazon: 5113 Hayden Run
9.74 miles Cologix COL3
9.80 miles Cologix Columbus COL1, COL2
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building. Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
9.97 miles Cologix Columbus COL4
Cologix plans to build the 287,000-square-foot center on 9 acres along Alta View and Worthington Woods boulevards, next to its original campus on Scherers Court. The new site will be virtually adjacent to the existing campus on Scherers Court, and connected to it by fiber.
10.67 miles WeConnect Westerville
10.93 miles DartPoints Dublin
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
11.18 miles Expedient Dublin
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
12.45 miles Expedient: Lewis Center
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
13.12 miles Discover Financial Services New Albany
13.39 miles Compass New Albany
13.41 miles TJX Corporate Techno
13.42 miles Cyxtera Columbus CMH1
DCI Technology Holdings owns the building and is CenturyLink's landlord
13.54 miles Compugen New Albany
13.55 miles Google New Albany Ohio
13.71 miles Stack: NAL01 Future Expansion
STACK INFRASTRUCTURE plans to expand it's NAL01 campus, located at Souder Road, New Albany, OH. Upon completion, this facility will have an available power capacity of 48 megawatts.
13.82 miles STACK New Albany NAL01
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
13.90 miles Amazon Dublin OH
14.02 miles QTS: New Albany 2 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC1 will be located at 785 Beech Rd SW, Pataskala, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
14.10 miles QTS: New Albany 1 DC1
QTS is planning to build four-building data center campus in New Albany, Ohio. The first building of the campus will be located at 1225 Beech Rd SW, New Albany, OH . New Albany 1 will offer 144MW across two facilities.
14.38 miles QTS: New Albany 1 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus will be located at 1275 Beech Rd SW, New Albany, OH. The buildings at the first site will reportedly span 885,600 sq ft (82,275 sqm).
14.46 miles Facebook New Albany Ohio
In August 2017, Facebook announced plans to build its first data center in the state in New Albany. The 970,000-square-foot facility is being constructed on 345 acres in the business park on the east side of Beech Road and south of the state Route 161 interchange.
14.57 miles QTS: New Albany 2 DC2
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC2 will be located at 675 Beech Rd SW, Etna, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
15.41 miles Amazon New Albany
15.49 miles Amazon New Albany: Jug and Beach Road
15.80 miles Lincoln Rackhouse: Silicon Heartland Innovation Park
16.07 miles Amazon New Albany: Innovation Campus Way
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
16.98 miles CyrusOne: New Albany, Ohio
CyrusOne is planning a $150 million data center development in New Albany, Ohio. The company will spend $100m on building the data center, and $50m on acquiring the land for the facility. The site is located at 12181 Jug St, Johnstown, OH .

Lumen: 580 North 4th Data Center Photos

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
281 Facilities Owned
121 Markets Served
93.8 Megawatts
View Company

News

Read More News