Lumen San Francisco (200 Paul)

200 Paul Avenue

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Infrastructure:


UPS Energy Storage: Battery DC energy storage system arranged in an N+1 battery string per UPS module.
Emergency Power: Two 2MW Diesel Generators. Units in housings for protection with physical separation between units and switchgear.
Fuel Storage: 72-plus hours of fuel in 6000 gallon main fuel tank. Onsite
refueling capable while running.
Cooling Systems: Precision cooling roof-mounted dry cooler air conditioning
units provide N+1 cooling to each suite.

  • Liebert Humidification System
  • Leak Detection: Rope-style leak detection deployment throughout

Fire Suppression: Smoke detectors with double interlocked pre-action dry pipe water suppression.

Map and Nearby Locations:

200 Paul Avenue (Suite 401)
Click Map to begin Search

Sites within 15 miles of Lumen San Francisco (200 Paul)

Show SqM
Distance Site About
0.00 miles 200 Paul (SFR1) Digital Realty
SFR1 (200 Paul Ave.) is the best connected building in the city of San Francisco. The 5 story building was built in 2001 and was renovated in 2014.
0.00 miles United Layer-SF9
0.00 miles United Layer-SF8
0.00 miles XO: 200 Paul
0.00 miles United Layer-SF7
0.01 miles Colocation America - San Francisco
0.10 miles Novva: San Francisco
0.11 miles 400 Paul Ave (1547)
400 Paul is San Francisco's first purpose-built data center in over 10 years
3.59 miles XO: 651 Brannan
3.69 miles Lumen San Francisco 1
3.88 miles Hosting.com San Francisco
4.11 miles Fortress Data Center San Francisco SF1
4.53 miles 365 Main (SFR2) Digital Realty
4.55 miles 360 Spear
360 Spear is a 155,000 square foot data center facility that benefits from being located adjacent to Digital's well-connected 365 Main Street facility.
4.55 miles ColoServe San Francisco
8.17 miles 720 2nd - Digital Realty
Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland.
8.17 miles Internap Oakland
9.08 miles Cogent Oakland
9.82 miles Lumen Emeryville 1
10.28 miles Evocative: Emeryville, Oakland OAK1
Evocative's Emeryville Data Center Facility (OAK1) is located at 1400 65th Street, Emeryville, CA 94608. Spanning an impressive 15,042 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
15.78 miles Lumen Hayward 1
16.94 miles Prime Hayward
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
17.04 miles AT&T Hayward

Lumen San Francisco (200 Paul) Data Center Photos

Operating Company

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
281 Facilities Owned
164 Markets Served
93.8 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
san-francisco-ca-data-center September 2020

Level3 SF 200 Paul Data Sheet (PDF)