0.07 miles
|
DataBank McLean IAD2
|
|
0.86 miles
|
8100 Boone - Digital Realty
|
|
0.90 miles
|
Element Critical VA1
|
|
0.91 miles
|
Equinix Vienna DC7
|
|
0.95 miles
|
Cogent Vienna
|
|
1.66 miles
|
Equinix Vienna DC8
|
|
3.68 miles
|
XO Fairfax
|
|
6.49 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
6.49 miles
|
ANEXIO Reston
|
|
6.60 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
6.60 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
6.78 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
7.42 miles
|
InfoRelay Reston
|
|
8.17 miles
|
XO (4301 Connecticut)
|
|
8.46 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
8.46 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
8.79 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
9.33 miles
|
Equinix DC97
|
|
9.47 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
9.50 miles
|
Cogent: 510 Huntmar
|
|
9.63 miles
|
Lumen Herndon 3
|
|
9.65 miles
|
Lumen Herndon 1
|
|
9.69 miles
|
XO: 1120 Vermont
|
|
9.70 miles
|
Cogent: 1120 Vermont
|
|
9.70 miles
|
Level3 Washington
|
|
9.76 miles
|
CoreSite DC2
|
|
9.91 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
9.91 miles
|
XO (1220 L)
|
|
10.19 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
11.58 miles
|
Amazon 13600 EDS Drive
|
|
11.61 miles
|
45900 Pathfinder Plz
|
|
11.64 miles
|
AWS: 45930 Pathfinder Plz
|
|
11.67 miles
|
InfoRelay Herndon
|
|
11.80 miles
|
AWS: 45950 Pathfinder Plz
|
|
11.93 miles
|
AWS: 22900 Platform Plz
|
|
12.21 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
12.21 miles
|
AWS: 22868 International Dr
|
|
12.24 miles
|
Cyxtera IAD2-B
|
|
12.31 miles
|
AWS: 22945 International Dr
|
|
12.31 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
12.87 miles
|
CyrusOne Sterling VIII
|
|
12.89 miles
|
Vantage VA2 Campus
|
|
12.93 miles
|
EdgeCore Ashburn
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
12.93 miles
|
Cyxtera Sterling DC4
|
|
12.94 miles
|
Cyxtera Sterling DC2
|
|
12.95 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
13.02 miles
|
Amazon IAD-51
|
|
13.04 miles
|
Amazon IAD9
|
|
13.05 miles
|
Amazon IAD-56
|
|
13.06 miles
|
Cyxtera Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
13.06 miles
|
Amazon 22420 Kipper
|
|
13.09 miles
|
Amazon IAD1
|
|
13.10 miles
|
Amazon IAD-69
|
|
13.12 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
13.14 miles
|
Amazon 22370 Kipper
|
|
13.16 miles
|
Amazon IAD22
|
|
13.17 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
13.17 miles
|
Amazon IAD-58
|
|
13.17 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
13.21 miles
|
Amazon IAD-57
|
|
13.22 miles
|
COPT: 45761 Maries Rd
|
|
13.26 miles
|
Amazon 45111 Loudoun Downs
|
|
13.29 miles
|
Amazon IAD-88
|
|
13.34 miles
|
COPT: 45751 Maries Rd
|
|
13.36 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
13.39 miles
|
Vantage VA11
|
|
13.44 miles
|
Sentinel Ashburn
|
|
13.44 miles
|
Vantage VA12
|
|
13.48 miles
|
Vantage VA13
|
|
13.52 miles
|
Amazon IAD12
|
|
13.53 miles
|
Amazon 25020 Willard Road
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
13.54 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
13.59 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
13.60 miles
|
Amazon IAD16
|
|
13.60 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
13.63 miles
|
Amazon IAD15
|
|
13.66 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
13.66 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
13.73 miles
|
Amazon 45305 Severn
|
|
13.78 miles
|
Amazon IAD76
|
|
13.79 miles
|
Amazon IAD10
|
|
13.81 miles
|
Amazon 45259 Severn
|
|
13.87 miles
|
Amazon IAD32
|
|
13.87 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
13.91 miles
|
21710 Charles View
|
|
13.92 miles
|
PowerHouse Pacific
|
|
13.93 miles
|
CyrusOne Northern Virginia Sterling V
|
|
13.98 miles
|
21641 Charles View
|
|
13.99 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
14.00 miles
|
IBM Softlayer Chantilly WDC01
|
|
14.07 miles
|
Digital Realty: Broderick Drive
|
|
14.10 miles
|
Digital Realty: IAD43
|
|
14.12 miles
|
QTS Ashburn Lockridge
|
|
14.21 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
14.30 miles
|
Amazon 25420 Sutton Bay
|
|
14.31 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
14.40 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
14.42 miles
|
Amazon 25410 Sutton Bay
|
|
14.47 miles
|
Equinix DC21
|
|
14.53 miles
|
PowerHouse ABX1
|
|
14.56 miles
|
Amazon Willard Road (Land)
|
|
14.57 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
14.61 miles
|
44751 Round Table (Bldg P)
|
|
14.61 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
14.62 miles
|
Equinix DC15
|
|
14.62 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
14.64 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
14.71 miles
|
Amazon 44854 Interconnection
|
|
14.74 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
14.74 miles
|
VPLS IAD
|
|
14.74 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
14.77 miles
|
Amazon 44858 Interconnection Plaza
|
|
14.78 miles
|
Equinix Ashburn DC11
|
|
14.78 miles
|
Equinix Ashburn DC6
|
|
14.84 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
14.84 miles
|
44351 Import Plz
|
|
14.85 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
14.85 miles
|
ANEXIO VA1
|
|
14.85 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
14.86 miles
|
Equinix Ashburn DC1
|
|
14.87 miles
|
CloudHQ LC2
|
|
14.87 miles
|
CloudHQ Ashburn Campus
|
|
14.88 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
14.91 miles
|
Amazon 44862 Interconnection Plaza
|
|
14.93 miles
|
Equinix Ashburn DC5
|
|
14.95 miles
|
Lumen Ashburn
|
|
14.98 miles
|
Equinix Ashburn DC4
|
|
14.99 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
15.01 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
15.01 miles
|
44274 Round Table (Bldg L)
|
|
15.02 miles
|
44490 Chilum Place: Digital Realty
|
|
15.03 miles
|
Import Plz, Ashburn
|
|
15.04 miles
|
NTT VA2
|
|
15.06 miles
|
Amazon IAD61
|
|
15.06 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
15.06 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
15.06 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
15.08 miles
|
QTS Ashburn-Shellhorn DC2
|
|
15.08 miles
|
44372 Round Table: Digital Realty
|
|
15.11 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
15.11 miles
|
ServerCentral Ashburn DC3
|
|
15.11 miles
|
44470 Chillum - Digital Realty
|
|
15.12 miles
|
Amazon IAD-63
|
|
15.12 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
15.13 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
15.13 miles
|
ANEXIO Ashburn IAD4
|
|
15.13 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
15.14 miles
|
QTS Ashburn-Shellhorn
|
|
15.16 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
15.19 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
15.20 miles
|
Amazon IAD60
|
|
15.20 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
15.21 miles
|
Rackspace Ashburn IAD3
|
|
15.23 miles
|
Amazon Prediction Lane
|
|
15.25 miles
|
Amazon IAD71
|
|
15.28 miles
|
Equinix DC13
|
|
15.28 miles
|
Amazon IAD50
|
|
15.35 miles
|
Aligned Ashburn
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
15.38 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
15.38 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
15.38 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
15.39 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
15.40 miles
|
Amazon IAD-67
|
|
15.40 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
15.40 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
15.44 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
15.45 miles
|
Aligned IAD02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
15.50 miles
|
NTT Ashburn Campus
|
|
15.57 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
15.58 miles
|
43915 Devin Shafron (Bldg A)
|
|
15.59 miles
|
NTT VA5
|
|
15.61 miles
|
NTT VA4
|
|
15.63 miles
|
43881 Devin Shafron (Bldg B)
|
|
15.67 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
15.73 miles
|
43830 Devin Shafron (Bldg F)
|
|
15.75 miles
|
43831 Devin Shafron (Bldg C)
|
|
15.80 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
15.82 miles
|
43790 Devin Shafron (Bldg E)
|
|
15.86 miles
|
43791 Devin Shafron (Bldg D)
|
|
15.86 miles
|
Amazon IAD-54
|
|
15.92 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
15.92 miles
|
FastServ Ashburn
|
|
15.97 miles
|
CyrusOne Sterling IX
|
|
15.99 miles
|
DataBank Ashburn IAD3
|
|
16.37 miles
|
12401 Prosperity Dr: Lincoln Rackhouse
|
12401 Prosperity Dr. is an enterprise grade, highly-secure data center located just 15 miles north of Washington D.C., in Silver Spring, MD.
|
16.39 miles
|
Agile Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
16.67 miles
|
Amazon Fadeley I
|
|
16.69 miles
|
Amazon Fadeley II
|
|
16.80 miles
|
Amazon Fadeley III
|
|
17.05 miles
|
Google: Arcola 2
|
|
17.07 miles
|
Google Dulles Arcola Center
|
|
17.48 miles
|
PowerHouse Arcola
|
|
17.91 miles
|
AiNET Beltsville WDC-1
|
|
17.99 miles
|
Equinix Manassas DC14
|
|
18.00 miles
|
AOL: 7777 Infantry Ridge
|
|
18.19 miles
|
Amazon 41992 John Mosby Highway
|
|
18.27 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
18.58 miles
|
Microsoft IAD11
|
|
18.76 miles
|
Microsoft Aldie
|
|
19.09 miles
|
AWS: Nokesville Road Campus
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction will soon begin on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
19.13 miles
|
Lerner: Maryland, WA
|
|
19.22 miles
|
AWS: 8401 Vulcan Lane Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
19.25 miles
|
AWS: 8501 Vulcan Ln
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
19.28 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
19.37 miles
|
Microsoft: Jacksonville Road
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
19.45 miles
|
Compass Loudoun County
|
|
19.54 miles
|
Amazon 7500 Bethlehem
|
|
19.65 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
19.67 miles
|
QTS: Prince William Digital Gateway Campus
|
QTS and Compass Datacenters plan to build a massive data center complex of 34 data centers with a capacity exceeding 1.7 gigawatts.
|
19.67 miles
|
Amazon IAD7
|
|
19.73 miles
|
AWS: 7350 Century Park
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.75 miles
|
Amazon IAD24
|
|
19.77 miles
|
AWS: 7151 Century Park Campus
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
19.79 miles
|
9020 Freedom Center
|
|
19.82 miles
|
Amazon IAD11
|
|
19.83 miles
|
QTS Manassas DC1
|
|
19.87 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
19.88 miles
|
9040 Freedom Center
|
|
19.91 miles
|
Google Leesburg Stonewall Park
|
|