Iron Mountain acquired the building from Fortrust in July 2017 for $130 million. (Source: PR)
Building:
» Tier III Certification of Constructed Facility from the Uptime Institute
» Modular “plug and play” infrastructure throughout the critical system’s design allows for expansion without interruption
» 50,000 square feet of operational raised-floor space and 65,000 square feet of data modules all on ground floor/slab
» Facility located outside the 100 and 500-year flood plains
Raised Floor and Data Modules:
» Cabinets, cages, and data modules ranging from 100 square feet and above
» 100 and 200kW @ 2N data modules
» Densities up to 35kW/rack in data modules
» Individual data module PUEs’ of <1.2
Power:
» 34 MW of data center infrastructure
» 2N (“A” & “B” side) electrical distribution to critical loads
» Multiple 1,000kVA and 750kVA uninterrupted power supply (UPS) systems in a 2N+1 configuration
» 2MW and 2.5MW generators in an N+1 configuration
HVAC:
» Closed-loop chilled water system; chillers, pumps, and computer room air handling units
» Dual path and bi-directional distribution
» 36 inch raised floor for optimum cooling
»High-density cooling in data modules >1000 watt/sq.ft. or 35kW/rack
Compliance:
» SSAE 16 Service Organization Control (“SOC”) 1 Type II
» SOC 2 Type II
» SOC 3 SysTrust Services Organization
» PCI/DSS (sections 9 &12)
» BBB A+ Accreditation
» HIPAA
» GLBA
Security:
» 7X24 on-site operations and customer support
» 7X24 on-site security guards
» Multiple layers and types of two-factor authentication and access control; including biometric, motion-sensor activated cameras and digital recording
» Additional off-site 3rd party security monitoring