H5 Portland

1233 NW 12th Ave

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Site History:

  • In 2022, H5 acquired the facility from vXchnge
  • vXchnge acquired the site from SunGard in 2015.

Connectivity:


  • In 2017 the NWAX peering Exchange deployed to vXchnge Portland.
  • A multitude of connectivity options including direct, physical-layer connectivity to ILEC, CLEC, long-haul, dark fiber, IP transit, Ethernet, TDM/voice and VoIP
  • Diverse, dedicated fiber optic pathways from street delivered to secure, diverse POE’s
  • Cable management with separation from power cabling
  • Copper and fiber connections available
  • Carriers Include: AT&T, CenturyLink, Comcast, Integra Telecom, Level 3, TW Telecom, Verizon,
  • and Zayo

Power:


  • Electrical System that includes: N+1 redundant UPS system
  • 2MW of utility power dedicated to the facility
  • Backup power generation provided by a 2MW diesel generator with automatic transfer
  • 3,000 gallons of diesel fuel on-site

Compliance:


  • SSAE 16 Type II, SOC
  • 2 Type II, ISO/IEC
  • 27001:2013, HIPAA and
  • PCI compliance

Map and Nearby Locations:

1233 NW 12th Ave (Suite 201)
Click Map to begin Search

Sites within 15 miles of H5 Portland

Show SqM
Distance Site About
0.07 miles Lumen Portland I
0.61 miles Tata Portland (Brewery Block)
The Portland Brewery Blocks data center was purposely built by it’s previous owner, Tycom to serve as an endpoint for it’s high-capacity, undersea fiber cable linking the US with Asia.
0.61 miles Opus Interactive Portland
0.74 miles Pittock Internet Exchange
The Pittock building is Portland's carrier hotel, which has the second greatest density of networks and carriers in the Pacific Northwest (2nd to the Westin Building in Seattle.)
0.74 miles Atmosera DC3
0.78 miles LightPoint Portland
0.78 miles Lumen Portland 2
Located in the Union Bank Building
1.08 miles SpireTech
5.92 miles Lunavi Portland
5.92 miles Atmosera DC1 DC2
7.21 miles Lumen Portland 3
The site is a former tw telecom operated facility.
7.38 miles XO: Beaverton
10.11 miles Flexential Hillsboro 1
The Hillsboro sites are a former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017.
10.13 miles 3825 NW Aloclek Hillsboro - Digital Realty
10.22 miles Tata Hillsboro
10.38 miles Opus Interactive Hillsboro
10.41 miles STACK Portland POR02
10.80 miles EdgeConnex POR2
11.21 miles EdgeConneX POR03
11.26 miles EdgeConneX Portland
11.42 miles Flexential Hillsboro 2
The site houses the U.S. cable landing station for the Hawaiki submarine cable, which delivers “low-latency” connection between the continental U.S., Hawaii, Australia, New Zealand and American Samoa.
11.72 miles Intel Hillsboro, HF2-DC201
11.95 miles QTS Hillsboro 1
12.03 miles QTS Hillsboro 2
12.05 miles Adobe Hillsboro
12.15 miles QTS Hillsboro 3
12.20 miles QTS Hillsboro 4
12.30 miles QTS Hillsboro 5
12.32 miles NTT Hilsboro HI1
The 144MW site will consist of five buildings with a total space of 1 million sq ft (93,000 sq m).
12.32 miles NTT HI2
12.39 miles STACK Portland POR03
STACK Infrastructure is constructing a new data center facility named POR03A at 4735 NE Starr Blvd, Hillsboro, OR. The data center will boast a substantial footprint of 180000 square feet.
12.42 miles Stack: PORT03 Future Expansion
STACK Infrastructure is planning to extend their data center campus PORT03 at 4735 NE Starr Blvd, in Hillsboro
12.44 miles Flexential Portland - Hillsboro 3
12.44 miles CoreWeave: Hillsboro, OR
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
12.47 miles Stack: POR03B
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building B, in Hillsboro with a substantial footprint of 180000 square feet.
12.48 miles T5 Portland
12.49 miles Flexential Hillsboro 4
12.54 miles Stack: POR03C
STACK Infrastructure is constructing a new data center facility at 4735 NE Starr Blvd, Building C, in Hillsboro with a substantial footprint of 180000 square feet.
12.86 miles Aligned Hillsboro PDX-01
13.19 miles OVH Hillsboro, Oregon: HIL-1
19.56 miles Rowan: Meriwether, Portland, OR
Rowan Data Centers has announced plans for a campus in Forest Grove, Portland, OR. Preliminary plans for the Project Meriwether development call for 150 MW of capacity.

H5 Portland Data Center Photos


Colocation floor

Large Content Company Data Centers in Rural Oregon
Posted in Oregon
Source: Dan Aguayo - The Oregonian

Operating Company

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
22 Facilities Owned
23 Markets Served
109.85 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
vxc-data-sheet-portland-pdf November 2017