GTT Madrid-Lezama

Calle de Lezama

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

In May 2018, GTT acquired the Madrid site in a $2.3 billion acquisition of Interoute. (TR PR Source)

Power and Cooling:

  • Total power supply to site: 2000 kVA in 2N
  • configuration
  • Total generator power: 2000 kVA in 2N
  • configuration
  • Total UPS power: 800 kVA in 2N configuration
  • Cooling type: Chilled water
  • Total cooling: 340 kW-2N configuration

Datacenter Details:

  • Gross size of data centre: 4500 m²
  • Net size of customer space: 1200 m²
  • Building type: Brick & concrete
  • Building tenure: Owned
  • Number of data suites: 10
  • Suit expansion available: Yes
  • Uniform distributed loads: 1000 kg/m²
  • Max raise floor height: 0 mm

Compliance:

ICREA Certification
ISO 27001
PCI DSS
ISAE 3402 / SSAE 16

Map and Nearby Locations:

Calle de Lezama
Click Map to begin Search

Sites within 15 miles of GTT Madrid-Lezama

Show SqM
Distance Site About
1.85 miles Ibercom Madrid
2.01 miles Equinix Madrid MD2
2.26 miles Produban Mesena 80
3.36 miles Equinix MD3x
3.43 miles Equinix MD6
3.47 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building with a total IT load of 18 MW.
3.79 miles Colt Madrid
3.82 miles DATA4 Madrid - Alcobendas
3.90 miles Equinix Madrid MD1
4.82 miles Interxion MAD4
4.91 miles Hispaweb Miguel Yuste
5.06 miles Nabiax: Julián Camarillo Campus
5.08 miles Interxion MAD2
5.10 miles Interxion MAD1
5.27 miles Interxion MAD3
5.83 miles Cogent Madrid
6.83 miles Verizon Nap of Madrid
6.83 miles Level3 Madrid
6.83 miles Global Switch Madrid
7.07 miles IPCore Madrid
8.47 miles inAsset NixMad
8.48 miles BBVA CPD Tres Cantos
10.36 miles Iron Mountain MAD-1
Iron Mountain acquired the campus from XData Properties in November 2022.
10.50 miles NTT Madrid 1
18.49 miles Nabiax: Alcalá de Henares
18.59 miles Adam MAD Alcala

GTT Madrid-Lezama Data Center Photos

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Operating Company

GTT Communications, Inc., formerly Global Telecom and Technology, is a multinational telecommunications and internet provider company with headquarters in McLean, Virginia.

17 Facilities Owned
14 Markets Served
13.19 Megawatts
View Company

News

Read More News