0.50 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
0.63 miles
|
Compass Loudoun County
|
|
1.97 miles
|
Microsoft Leesburg 1A
|
|
2.41 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
2.68 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
3.98 miles
|
DataBank Ashburn IAD3
|
|
4.08 miles
|
FastServ Ashburn
|
|
4.08 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
4.20 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
4.31 miles
|
NTT VA4
|
|
4.31 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
4.35 miles
|
NTT VA5
|
|
4.42 miles
|
NTT Ashburn Campus
|
|
4.44 miles
|
43790 Devin Shafron (Bldg E)
|
|
4.46 miles
|
43791 Devin Shafron (Bldg D)
|
|
4.46 miles
|
Amazon IAD-54
|
|
4.53 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
4.53 miles
|
43830 Devin Shafron (Bldg F)
|
|
4.56 miles
|
43831 Devin Shafron (Bldg C)
|
|
4.58 miles
|
Aligned IAD02
|
|
4.67 miles
|
43881 Devin Shafron (Bldg B)
|
|
4.67 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
4.68 miles
|
43915 Devin Shafron (Bldg A)
|
|
4.68 miles
|
Amazon IAD50
|
|
4.71 miles
|
Rackspace Ashburn IAD3
|
|
4.71 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
4.71 miles
|
Amazon IAD71
|
|
4.72 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
4.72 miles
|
Equinix DC13
|
|
4.73 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
4.75 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
4.76 miles
|
Amazon IAD60
|
|
4.79 miles
|
ANEXIO Ashburn IAD4
|
|
4.79 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
4.80 miles
|
44470 Chillum - Digital Realty
|
|
4.81 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
4.81 miles
|
ServerCentral Ashburn DC3
|
|
4.81 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
4.85 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
4.85 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
4.86 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
4.86 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
4.86 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
4.88 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
4.88 miles
|
Amazon IAD-67
|
|
4.89 miles
|
NTT VA2
|
|
4.89 miles
|
44490 Chilum Place: Digital Realty
|
|
4.92 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
4.94 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
4.95 miles
|
44372 Round Table: Digital Realty
|
|
4.96 miles
|
Equinix Ashburn DC4
|
|
4.96 miles
|
Lumen Ashburn
|
|
4.99 miles
|
Equinix Ashburn DC5
|
|
5.00 miles
|
44274 Round Table (Bldg L)
|
|
5.00 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
5.03 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
5.04 miles
|
Amazon 44862 Interconnection Plaza
|
|
5.05 miles
|
Equinix Ashburn DC1
|
|
5.06 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
5.07 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
5.08 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
5.08 miles
|
ANEXIO VA1
|
|
5.08 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
5.08 miles
|
CloudHQ LC2
|
|
5.10 miles
|
CloudHQ Ashburn Campus
|
|
5.14 miles
|
Equinix Ashburn DC11
|
|
5.14 miles
|
Equinix Ashburn DC6
|
|
5.15 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
5.16 miles
|
QTS Ashburn-Shellhorn
|
|
5.18 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
5.18 miles
|
VPLS IAD
|
|
5.18 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
5.18 miles
|
QTS Ashburn-Shellhorn DC2
|
|
5.20 miles
|
Amazon 44858 Interconnection Plaza
|
|
5.26 miles
|
Amazon 44854 Interconnection
|
|
5.27 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
5.30 miles
|
Import Plz, Ashburn
|
|
5.31 miles
|
Equinix DC15
|
|
5.31 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
5.31 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
5.36 miles
|
44751 Round Table (Bldg P)
|
|
5.38 miles
|
PowerHouse ABX1
|
|
5.45 miles
|
Equinix DC21
|
|
5.47 miles
|
44351 Import Plz
|
|
5.51 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
5.54 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
5.89 miles
|
Digital Realty: Broderick Drive
|
|
5.91 miles
|
Digital Realty: IAD43
|
|
5.94 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
5.95 miles
|
21641 Charles View
|
|
6.01 miles
|
21710 Charles View
|
|
6.02 miles
|
QTS Ashburn Lockridge
|
|
6.04 miles
|
PowerHouse Pacific
|
|
6.08 miles
|
CyrusOne Northern Virginia Sterling V
|
|
6.11 miles
|
Amazon IAD32
|
|
6.13 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
6.15 miles
|
Amazon 45259 Severn
|
|
6.19 miles
|
Amazon IAD10
|
|
6.22 miles
|
Amazon 45305 Severn
|
|
6.26 miles
|
EdgeCore Ashburn
|
|
6.27 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
6.34 miles
|
Amazon IAD76
|
|
6.43 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
6.46 miles
|
Vantage VA13
|
|
6.46 miles
|
EdgeCore: Ashburn, AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.51 miles
|
Amazon IAD15
|
|
6.52 miles
|
Vantage VA12
|
|
6.53 miles
|
Sentinel Ashburn
|
|
6.55 miles
|
Vantage VA11
|
|
6.56 miles
|
EdgeCore: Sterling, NV
|
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.56 miles
|
Amazon IAD16
|
|
6.59 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
6.60 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
6.68 miles
|
Amazon IAD12
|
|
6.76 miles
|
COPT: 45751 Maries Rd
|
|
6.77 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
6.81 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
6.81 miles
|
CyrusOne Sterling IX
|
|
6.81 miles
|
Amazon IAD-88
|
|
6.83 miles
|
Amazon 45111 Loudoun Downs
|
|
6.86 miles
|
Amazon 22370 Kipper
|
|
6.86 miles
|
COPT: 45761 Maries Rd
|
|
6.94 miles
|
Amazon 22420 Kipper
|
|
6.96 miles
|
Amazon IAD-57
|
|
6.99 miles
|
Microsoft Aldie
|
|
7.02 miles
|
Amazon IAD-58
|
|
7.02 miles
|
Amazon IAD-56
|
|
7.03 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
7.03 miles
|
Amazon IAD-51
|
|
7.06 miles
|
Cyxtera Sterling DC3
|
|
7.06 miles
|
Vantage VA2 Campus
|
|
7.07 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
7.07 miles
|
Amazon IAD-69
|
|
7.16 miles
|
EdgeCore: Ashburn, AS01
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
7.16 miles
|
Amazon Fadeley I
|
|
7.17 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
7.18 miles
|
Cyxtera Sterling DC2
|
|
7.18 miles
|
Amazon Fadeley III
|
|
7.20 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
7.21 miles
|
CyrusOne Sterling VIII
|
|
7.21 miles
|
Microsoft IAD11
|
|
7.22 miles
|
Cyxtera Sterling DC4
|
|
7.27 miles
|
Amazon Fadeley II
|
|
7.38 miles
|
Google Dulles Arcola Center
|
|
7.41 miles
|
Amazon 41992 John Mosby Highway
|
|
7.53 miles
|
PowerHouse Arcola
|
|
7.65 miles
|
Google: Arcola 2
|
|
7.78 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
7.84 miles
|
AWS: 22945 International Dr
|
|
7.85 miles
|
Cyxtera IAD2-B
|
|
7.88 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
7.91 miles
|
AWS: 22868 International Dr
|
|
8.14 miles
|
AWS: 22900 Platform Plz
|
|
8.17 miles
|
AWS: 45950 Pathfinder Plz
|
|
8.32 miles
|
AWS: 45930 Pathfinder Plz
|
|
8.36 miles
|
45900 Pathfinder Plz
|
|
9.53 miles
|
Amazon 25020 Willard Road
|
|
9.53 miles
|
Amazon Willard Road (Land)
|
|
9.57 miles
|
Amazon Prediction Lane
|
|
9.67 miles
|
Amazon IAD-63
|
|
9.81 miles
|
Amazon IAD61
|
|
9.94 miles
|
Amazon 25420 Sutton Bay
|
|
9.98 miles
|
Amazon 25410 Sutton Bay
|
|
10.09 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
10.15 miles
|
InfoRelay Herndon
|
|
10.44 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
10.45 miles
|
Lumen Herndon 1
|
|
10.46 miles
|
IBM Softlayer Chantilly WDC01
|
|
10.47 miles
|
Lumen Herndon 3
|
|
10.51 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
10.64 miles
|
Cogent: 510 Huntmar
|
|
10.81 miles
|
Equinix DC97
|
|
10.82 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
10.85 miles
|
Amazon 13600 EDS Drive
|
|
10.97 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
11.56 miles
|
Amazon IAD9
|
|
11.59 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
11.62 miles
|
Amazon IAD22
|
|
11.66 miles
|
Amazon IAD1
|
|
11.81 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
11.81 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
12.67 miles
|
InfoRelay Reston
|
|
13.28 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
13.45 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
13.45 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
13.55 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
13.56 miles
|
ANEXIO Reston
|
|
13.56 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
17.16 miles
|
AOL: 7777 Infantry Ridge
|
|
17.28 miles
|
Equinix Manassas DC14
|
|
17.35 miles
|
Amazon IAD-55
|
|
17.38 miles
|
Amazon: 15455 John Marshall
|
|
17.44 miles
|
Amazon 15465 John Marshall
|
|
17.55 miles
|
Corscale: Gainesville Crossing
|
|
17.57 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
17.77 miles
|
NTT Gainesville VA Campus
|
|
17.97 miles
|
Amazon IAD-59
|
|
17.98 miles
|
Amazon 7500 Bethlehem
|
|
17.99 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
18.03 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
18.03 miles
|
Amazon IAD7
|
|
18.04 miles
|
Amazon IAD24
|
|
18.04 miles
|
Amazon IAD-52
|
|
18.08 miles
|
Amazon IAD11
|
|
18.12 miles
|
Amazon IAD14
|
|
18.25 miles
|
Equinix Vienna DC8
|
|
18.38 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
18.78 miles
|
Amazon: 8190 Bethlehem
|
|
18.83 miles
|
Amazon Bethlehem Technology Park DC20
|
|
18.85 miles
|
Amazon Bethlehem Technology Park DC19
|
|
18.90 miles
|
Amazon Bethlehem Technology Park DC18
|
|
18.95 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
18.96 miles
|
Amazon IAD-73
|
|
19.00 miles
|
Amazon IAD-74
|
|
19.02 miles
|
Iron Mountain VA-2
|
|
19.03 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
19.05 miles
|
Yondr Bristow Campus
|
|
19.07 miles
|
Rowan: Frederick County, Maryland
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland. The campus is set to offer 231MW.
|
19.13 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
19.18 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
19.22 miles
|
Opus Interactive Manassas
|
|
19.29 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
19.31 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
19.42 miles
|
Cogent Vienna
|
|
19.47 miles
|
8100 Boone - Digital Realty
|
|
19.86 miles
|
DataBank McLean IAD2
|
|
19.90 miles
|
Equinix Vienna DC7
|
|
19.91 miles
|
Lumen McLean 1
|
|
19.94 miles
|
Element Critical VA1
|
|