0.09 miles
|
Vantage London I Campus
|
|
0.10 miles
|
Colt Powergate
|
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
0.27 miles
|
Vantage London II
|
|
0.33 miles
|
Options West London
|
|
0.68 miles
|
Equinix London LD3
|
|
2.57 miles
|
Redwire
|
|
2.87 miles
|
LDeX London LDeX1
|
|
3.40 miles
|
Visa United Kingdom
|
|
4.69 miles
|
Barclays Data Centre
|
|
4.94 miles
|
Zenium London One
|
|
5.38 miles
|
Verizon London UK5
|
|
6.10 miles
|
aptum London
|
|
6.63 miles
|
Level3 London (Goswell)
|
|
6.70 miles
|
Level3 London (10 Fleet)
|
|
6.74 miles
|
Volta EC1
|
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
6.76 miles
|
VIRTUS Hayes London2
|
|
6.84 miles
|
Ark: Union Park
|
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
7.35 miles
|
1 Olivers Yard - Digital Realty
|
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
7.44 miles
|
Epsilon London Telephone House
|
|
7.45 miles
|
iomart DC2 London
|
|
7.45 miles
|
Redcentric Hounslow
|
|
7.50 miles
|
Telehouse London Metro
|
|
7.52 miles
|
Redcentric London
|
|
7.66 miles
|
Colt House London
|
|
7.93 miles
|
Interxion LON1 LON3
|
|
8.00 miles
|
Interxion London 2
|
|
8.00 miles
|
Internap London
|
|
8.03 miles
|
Level3 London (Braham)
|
|
8.09 miles
|
Verizon London UK4
|
|
8.22 miles
|
Level3 London (120 Leman)
|
|
8.35 miles
|
Netwise London Central
|
|
8.37 miles
|
CyrusOne London II (Stockley Park)
|
The London II datacenter was originally built by Infinity SDC.
|
8.47 miles
|
CyrusOne: London II
|
|
8.62 miles
|
VIRTUS Stockley Park Campus
|
LONDON6 was opened
|
8.72 miles
|
Colt London I
|
|
9.35 miles
|
DRT London (West Drayton)
|
|
9.78 miles
|
Coreix Docklands
|
|
10.09 miles
|
Infinity SDC HereEast
|
|
10.26 miles
|
ServerFarm London
|
3,000 m² of data hall expansion space available within 6 – 9 months
Concurrently maintainable standards
|
10.38 miles
|
AIMES DC3 Mastmaker Road
|
|
10.44 miles
|
GTT London Citi
|
|
10.51 miles
|
DRT London (Bonnington House)
|
|
10.56 miles
|
Echelon LCY10
|
|
10.56 miles
|
Cyxtera London LO3 & LO4
|
|
10.56 miles
|
Keppel GV7 London
|
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
10.57 miles
|
Digital Docklands: Cloud House
|
|
10.58 miles
|
City Reach London Docklands
|
|
10.69 miles
|
Equinix London LD8 Harbour Exchange (Docklands)
|
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
10.71 miles
|
DRT London (Chess Building)
|
|
10.76 miles
|
Digital Meridian Gate (215 Marsh)
|
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
10.82 miles
|
Digital Sovereign House (227 Marsh Wall)
|
|
10.89 miles
|
Level3 London (E India Dock)
|
|
10.99 miles
|
GTT London GS2
|
|
11.00 miles
|
Global Switch London Docklands Campus
|
|
11.00 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
11.02 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
11.03 miles
|
Verizon London THW
|
|
11.04 miles
|
Telehouse South
|
|
11.13 miles
|
Ark: Meridian Park
|
|
11.23 miles
|
Kao Data: Bidder Street, Newham
|
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
|
11.25 miles
|
DRT London (Chessington)
|
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
11.36 miles
|
DRT London (Croydon)
|
|
11.44 miles
|
Coreix Enfield
|
|
12.08 miles
|
VIRTUS London1 Enfield
|
|
13.61 miles
|
Pulsant South London
|
|
13.72 miles
|
Yondr Slough
|
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
|
14.15 miles
|
Netwise London East (NLE)
|
|
15.44 miles
|
NTT Slough 3
|
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
15.47 miles
|
NTT Slough 2
|
|
15.48 miles
|
Kao Data Slough
|
|
15.49 miles
|
Level3 Slough
|
|
15.56 miles
|
VIRTUS LONDON9
|
|
15.57 miles
|
Rackspace London Slough (LON3)
|
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
15.57 miles
|
GTR Slough
|
The campus will comprise of three independent data centres capable of operating individually, or as one interlinked campus,
|
15.59 miles
|
GoDaddy Slough (HEG)
|
|
15.65 miles
|
Logicalis Slough
|
|
15.66 miles
|
Iron Mountain London LON-2
|
|
15.67 miles
|
VIRTUS LONDON10
|
|
15.67 miles
|
Zayo Egham
|
|
15.68 miles
|
CyrusOne London I
|
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
15.70 miles
|
VIRTUS Slough London 3 and 4
|
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
15.71 miles
|
Equinix LD10
|
|
15.71 miles
|
Cyxtera Slough LO5
|
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
15.74 miles
|
Equinix Slough Campus LD4, LD5, LD6, LD10
|
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
15.75 miles
|
Equinix LD13x
|
|
15.83 miles
|
VIRTUS London 11
|
|
15.89 miles
|
CyrusOne London III
|
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
15.90 miles
|
CyrusOne LON5
|
|
15.91 miles
|
4D Surrey
|
Based in Byfleet, 4D's Tier-3 Surrey data centre is close to M25 and about 30 minutes to London Waterloo. It's carrier neutral and offers u-space, quarter, half and full racks with options for data halls and suites.
|
15.97 miles
|
China Mobile Slough
|
|
15.98 miles
|
Equinix LD5
|
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
15.98 miles
|
QTS London
|
|
16.13 miles
|
Equinix LD12
|
|
16.13 miles
|
Equinix LD14
|
|
16.17 miles
|
Iron Mountain London LON-1
|
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
16.20 miles
|
Equinix LD7
|
|
16.23 miles
|
Equinix LD6
|
|
16.28 miles
|
Equinix LD4
|
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
16.36 miles
|
Equinix LD11x
|
|
17.38 miles
|
NTT Hempstead4
|
|
17.70 miles
|
Ark: Longcross
|
|
17.73 miles
|
NTT Hempstead 3
|
|
17.81 miles
|
NTT Hempstead 1
|
|
18.03 miles
|
NTT Hempstead 2
|
|
18.38 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
18.61 miles
|
NTT London 1 (Dagenham)
|
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
|
18.66 miles
|
Infinity Romford North and South
|
|
18.88 miles
|
INAP North London
|
INAP's North London data center is located within Colt's facility on Black Fan Road
|
18.88 miles
|
Colt London North: Welwyn Garden City
|
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
19.50 miles
|
Pulsant Maidenhead P1
|
|
19.61 miles
|
Echelon LCY20
|
|