Operated by: eNET
eNET has built a colocation facility in Columbus, Ohio which features:
Distance | Site | About |
---|---|---|
2.67 miles | Racksquared 2560 Value Way | |
2.82 miles | WeConnect Westerville |
|
4.01 miles | Cologix COL3 | |
4.08 miles | Cologix Columbus COL1, COL2 |
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
4.12 miles | Cologix Columbus COL4 |
Cologix plans to build the 287,000-square-foot center on 9 acres along Alta View and Worthington Woods boulevards, next to its original campus on Scherers Court. The new site will be virtually adjacent to the existing campus on Scherers Court, and connected to it by fiber.
|
6.36 miles | Expedient: Lewis Center |
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
6.68 miles | Discover Financial Services New Albany |
|
6.98 miles | TJX Corporate Techno | |
7.01 miles | Compass New Albany | |
7.05 miles | Cyxtera Columbus CMH1 |
DCI Technology Holdings owns the building and is CenturyLink's landlord
|
7.16 miles | Compugen New Albany |
|
7.30 miles | Stack: NAL01 Future Expansion |
STACK INFRASTRUCTURE plans to expand it's NAL01 campus, located at Souder Road, New Albany, OH. Upon completion, this facility will have an available power capacity of 48 megawatts.
|
7.45 miles | STACK New Albany NAL01 |
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
7.51 miles | CeraNet Columbus | |
7.67 miles | Expedient Upper Arlington |
|
8.11 miles | Lumen: 580 North 4th | |
8.48 miles | CityNet Columbus | |
8.48 miles | Lumen: 266 North 5th | |
8.50 miles | Cogent: 240 North 5th | |
8.52 miles | Racksquared 325 E Spring St | |
8.52 miles | WOW! 226 N 5th |
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
8.52 miles | Lumen: 226 North Fifth | |
8.82 miles | US Signal Columbus |
DC power w/battery backup available
Multiple diverse power feeds from utility grids |
8.82 miles | Deep Edge: 180 East Broad | |
9.12 miles | Crown Castle 101 E Town |
Crown Castle acquired Lightower in 2017
|
9.48 miles | Google New Albany Ohio |
|
9.64 miles | QTS: New Albany 1 DC1 |
QTS is planning to build four-building data center campus in New Albany, Ohio. The first building of the campus will be located at 1225 Beech Rd SW, New Albany, OH . New Albany 1 will offer 144MW across two facilities.
|
9.78 miles | QTS: New Albany 2 DC2 |
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC2 will be located at 675 Beech Rd SW, Etna, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
|
9.79 miles | QTS: New Albany 1 DC2 |
QTS is planning to build four-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus will be located at 1275 Beech Rd SW, New Albany, OH. The buildings at the first site will reportedly span 885,600 sq ft (82,275 sqm).
|
9.84 miles | QTS: New Albany 2 DC1 |
QTS is planning to build four-building data center campus in New Albany, Ohio. New Albany 2 DC1 will be located at 785 Beech Rd SW, Pataskala, OH. New Albany 2 will offer 78MW critical power capacity across two facilities.
|
9.85 miles | Amazon New Albany: Jug and Beach Road | |
9.89 miles | Amazon New Albany |
|
9.89 miles | Facebook New Albany Ohio |
In August 2017, Facebook announced plans to build its first data center in the state in New Albany. The 970,000-square-foot facility is being constructed on 345 acres in the business park on the east side of Beech Road and south of the state Route 161 interchange.
|
10.18 miles | DartPoints Dublin |
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
10.20 miles | Lincoln Rackhouse: Silicon Heartland Innovation Park |
|
10.44 miles | Amazon: 5113 Hayden Run | |
10.50 miles | Amazon Hilliard: 5109 Hayden Run | |
10.50 miles | Amazon: 5117 Hayden Run | |
10.83 miles | Amazon New Albany: Innovation Campus Way |
Amazon Web Services plans to invest $400 million to build a 170,000-square-foot data center on 100 acres in the eastern portion of the New Albany International Business Park
|
10.87 miles | Expedient Dublin |
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
12.42 miles | IBM Columbus | |
13.89 miles | Amazon Dublin OH |
|
14.25 miles | Compass Groveport AEP II | |
16.22 miles | Google Lockbourne, OH |
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
eNet Inc was founded in 1994 to offer Internet access to the Columbus Ohio area. ee.net provides a Internet access, Hosting, and Colocation services.