0.18 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
0.18 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
0.29 miles
|
ANEXIO Reston
|
|
0.29 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
0.64 miles
|
InfoRelay Reston
|
|
1.73 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
1.73 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
2.10 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
2.55 miles
|
Equinix DC97
|
|
2.70 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
2.72 miles
|
Cogent: 510 Huntmar
|
|
2.86 miles
|
Lumen Herndon 3
|
|
2.87 miles
|
Lumen Herndon 1
|
|
3.50 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
4.92 miles
|
45900 Pathfinder Plz
|
|
4.96 miles
|
AWS: 45930 Pathfinder Plz
|
|
5.11 miles
|
AWS: 45950 Pathfinder Plz
|
|
5.17 miles
|
Equinix Vienna DC8
|
|
5.18 miles
|
AWS: 22900 Platform Plz
|
|
5.26 miles
|
InfoRelay Herndon
|
|
5.44 miles
|
Amazon 13600 EDS Drive
|
|
5.45 miles
|
AWS: 22868 International Dr
|
|
5.46 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
5.49 miles
|
Cyxtera IAD2-B
|
|
5.55 miles
|
AWS: 22945 International Dr
|
|
5.56 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
6.19 miles
|
Cogent Vienna
|
|
6.21 miles
|
Vantage VA2 Campus
|
|
6.24 miles
|
8100 Boone - Digital Realty
|
|
6.29 miles
|
Amazon IAD-51
|
|
6.31 miles
|
Amazon IAD-56
|
|
6.35 miles
|
Amazon 22420 Kipper
|
|
6.39 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
6.40 miles
|
Amazon IAD-58
|
|
6.43 miles
|
Amazon 22370 Kipper
|
|
6.45 miles
|
Amazon IAD-57
|
|
6.51 miles
|
Amazon 45111 Loudoun Downs
|
|
6.52 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
6.54 miles
|
Amazon IAD-88
|
|
6.58 miles
|
CyrusOne Sterling VIII
|
|
6.64 miles
|
EdgeCore: Ashburn, AS01
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
6.65 miles
|
Equinix Vienna DC7
|
|
6.68 miles
|
Cyxtera Sterling DC2
|
|
6.69 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
6.70 miles
|
Element Critical VA1
|
|
6.71 miles
|
Cyxtera Sterling DC4
|
|
6.73 miles
|
Vantage VA11
|
|
6.73 miles
|
DataBank McLean IAD2
|
|
6.73 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
6.75 miles
|
Sentinel Ashburn
|
|
6.76 miles
|
Amazon IAD12
|
|
6.76 miles
|
Vantage VA12
|
|
6.77 miles
|
EdgeCore: Sterling, NV
|
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.78 miles
|
Lumen McLean 1
|
|
6.79 miles
|
Cyxtera Sterling DC3
|
|
6.82 miles
|
Vantage VA13
|
|
6.83 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
6.85 miles
|
Amazon IAD16
|
|
6.87 miles
|
EdgeCore: Ashburn, AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
6.87 miles
|
Amazon IAD-69
|
|
6.88 miles
|
Amazon IAD15
|
|
6.89 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
6.91 miles
|
COPT: 45761 Maries Rd
|
|
6.92 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
7.01 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
7.03 miles
|
Amazon IAD76
|
|
7.03 miles
|
COPT: 45751 Maries Rd
|
|
7.17 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
7.22 miles
|
XO Fairfax
|
|
7.24 miles
|
PowerHouse Pacific
|
|
7.26 miles
|
Amazon 45305 Severn
|
|
7.34 miles
|
Amazon 45259 Severn
|
|
7.35 miles
|
Amazon IAD9
|
|
7.36 miles
|
Amazon IAD10
|
|
7.36 miles
|
21710 Charles View
|
|
7.37 miles
|
QTS Ashburn Lockridge
|
|
7.39 miles
|
Digital Realty: Broderick Drive
|
|
7.40 miles
|
Digital Realty: IAD43
|
|
7.41 miles
|
Amazon IAD32
|
|
7.44 miles
|
Amazon IAD1
|
|
7.46 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
7.47 miles
|
21641 Charles View
|
|
7.50 miles
|
Amazon IAD22
|
|
7.52 miles
|
CyrusOne Northern Virginia Sterling V
|
|
7.58 miles
|
EdgeCore Ashburn
|
|
7.66 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
7.79 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
7.83 miles
|
Equinix DC21
|
|
7.83 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
7.93 miles
|
44751 Round Table (Bldg P)
|
|
7.97 miles
|
PowerHouse ABX1
|
|
7.98 miles
|
IBM Softlayer Chantilly WDC01
|
|
7.99 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
8.01 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
8.06 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
8.07 miles
|
44351 Import Plz
|
|
8.09 miles
|
Equinix DC15
|
|
8.10 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
8.11 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
8.11 miles
|
VPLS IAD
|
|
8.14 miles
|
Equinix Ashburn DC11
|
|
8.14 miles
|
Equinix Ashburn DC6
|
|
8.15 miles
|
Amazon 25420 Sutton Bay
|
|
8.19 miles
|
CloudHQ Ashburn Campus
|
|
8.19 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
8.20 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
8.20 miles
|
CloudHQ LC2
|
|
8.21 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
8.22 miles
|
Amazon 44854 Interconnection
|
|
8.23 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
8.23 miles
|
Equinix Ashburn DC1
|
|
8.26 miles
|
Import Plz, Ashburn
|
|
8.26 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
8.27 miles
|
Amazon 44858 Interconnection Plaza
|
|
8.28 miles
|
Amazon 25410 Sutton Bay
|
|
8.29 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
8.29 miles
|
ANEXIO VA1
|
|
8.30 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
8.30 miles
|
Equinix Ashburn DC5
|
|
8.31 miles
|
44274 Round Table (Bldg L)
|
|
8.31 miles
|
Amazon Willard Road (Land)
|
|
8.31 miles
|
Amazon 25020 Willard Road
|
|
8.32 miles
|
QTS Ashburn-Shellhorn DC2
|
|
8.34 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
8.35 miles
|
Equinix Ashburn DC4
|
|
8.37 miles
|
44372 Round Table: Digital Realty
|
|
8.38 miles
|
QTS Ashburn-Shellhorn
|
|
8.38 miles
|
Lumen Ashburn
|
|
8.39 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
8.41 miles
|
Amazon 44862 Interconnection Plaza
|
|
8.43 miles
|
44490 Chilum Place: Digital Realty
|
|
8.44 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
8.44 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
8.46 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
8.50 miles
|
NTT VA2
|
|
8.51 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
8.51 miles
|
ANEXIO Ashburn IAD4
|
|
8.52 miles
|
ServerCentral Ashburn DC3
|
|
8.52 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
8.52 miles
|
44470 Chillum - Digital Realty
|
|
8.55 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
8.56 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
8.58 miles
|
Equinix DC13
|
|
8.60 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
8.60 miles
|
Rackspace Ashburn IAD3
|
|
8.61 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
8.63 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
8.63 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
8.63 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
8.64 miles
|
Amazon IAD-67
|
|
8.64 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
8.68 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
8.69 miles
|
Amazon IAD60
|
|
8.69 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
8.72 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
8.73 miles
|
Amazon IAD71
|
|
8.75 miles
|
Aligned IAD02
|
|
8.75 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
8.77 miles
|
Amazon IAD50
|
|
8.81 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
8.83 miles
|
43915 Devin Shafron (Bldg A)
|
|
8.86 miles
|
NTT Ashburn Campus
|
|
8.87 miles
|
43881 Devin Shafron (Bldg B)
|
|
8.90 miles
|
Amazon IAD61
|
|
8.93 miles
|
Amazon IAD-63
|
|
8.93 miles
|
NTT VA5
|
|
8.97 miles
|
NTT VA4
|
|
8.97 miles
|
43830 Devin Shafron (Bldg F)
|
|
8.98 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
9.00 miles
|
43831 Devin Shafron (Bldg C)
|
|
9.02 miles
|
Amazon Prediction Lane
|
|
9.07 miles
|
43790 Devin Shafron (Bldg E)
|
|
9.10 miles
|
43791 Devin Shafron (Bldg D)
|
|
9.10 miles
|
Amazon IAD-54
|
|
9.11 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
9.22 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
9.23 miles
|
FastServ Ashburn
|
|
9.24 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
9.30 miles
|
CyrusOne Sterling IX
|
|
9.31 miles
|
DataBank Ashburn IAD3
|
|
10.07 miles
|
Amazon Fadeley I
|
|
10.10 miles
|
Amazon Fadeley II
|
|
10.21 miles
|
Amazon Fadeley III
|
|
10.51 miles
|
Google Dulles Arcola Center
|
|
10.53 miles
|
Google: Arcola 2
|
|
10.94 miles
|
PowerHouse Arcola
|
|
11.64 miles
|
Amazon 41992 John Mosby Highway
|
|
11.68 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
12.00 miles
|
Microsoft IAD11
|
|
12.16 miles
|
Microsoft Aldie
|
|
12.78 miles
|
Compass Loudoun County
|
|
12.97 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
13.28 miles
|
Google Leesburg Stonewall Park
|
|
13.76 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
13.91 miles
|
AOL: 7777 Infantry Ridge
|
|
13.94 miles
|
Equinix Manassas DC14
|
|
14.46 miles
|
XO (4301 Connecticut)
|
|
15.15 miles
|
Microsoft Leesburg 1A
|
|
15.44 miles
|
Amazon 7500 Bethlehem
|
|
15.48 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
15.56 miles
|
Amazon IAD7
|
|
15.62 miles
|
Amazon IAD24
|
|
15.69 miles
|
Amazon IAD11
|
|
15.93 miles
|
Amazon IAD-59
|
|
15.96 miles
|
Amazon IAD-52
|
|
16.02 miles
|
Amazon IAD14
|
|
16.19 miles
|
Amazon: 8190 Bethlehem
|
|
16.21 miles
|
Amazon Bethlehem Technology Park DC18
|
|
16.28 miles
|
Amazon Bethlehem Technology Park DC19
|
|
16.29 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
16.31 miles
|
Amazon Bethlehem Technology Park DC20
|
|
16.39 miles
|
XO: 1120 Vermont
|
|
16.40 miles
|
Cogent: 1120 Vermont
|
|
16.40 miles
|
Level3 Washington
|
|
16.40 miles
|
9020 Freedom Center
|
|
16.41 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
16.47 miles
|
CoreSite DC2
|
|
16.49 miles
|
9040 Freedom Center
|
|
16.52 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
16.54 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
16.55 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
16.56 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
16.57 miles
|
Iron Mountain VA-2
|
|
16.57 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
16.62 miles
|
QTS Manassas DC1
|
|
16.62 miles
|
XO (1220 L)
|
|
16.62 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
16.68 miles
|
Opus Interactive Manassas
|
|
16.85 miles
|
QTS Manassas DC5
|
|
16.88 miles
|
QTS 10680 University Blvd
|
|
16.94 miles
|
Corscale: Gainesville Crossing
|
|
16.99 miles
|
Amazon IAD-74
|
|
17.01 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
17.01 miles
|
Amazon IAD-73
|
|
17.21 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.34 miles
|
AWS 10261 Tanner
|
|
17.41 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
17.46 miles
|
AWS 10281 Tanner Way
|
|
17.48 miles
|
AWS IAD 101
|
|
17.59 miles
|
AWS IAD 100
|
|
17.60 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
17.61 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
17.61 miles
|
Amazon IAD-77
|
|
17.61 miles
|
Evoswitch USA WDC 1
|
|
17.61 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
17.71 miles
|
Amazon: 11150 Thomasson Barn
|
|
17.76 miles
|
Amazon: 11200 Thomasson Barn
|
|
17.77 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
17.80 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
17.83 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
17.90 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
17.93 miles
|
Yondr Bristow Campus
|
|
17.93 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
18.05 miles
|
CloudHQ MCC2
|
|
18.21 miles
|
NTT Gainesville VA Campus
|
|
18.24 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
18.39 miles
|
CloudHQ MCC3
|
|
18.58 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
19.36 miles
|
Amazon IAD-55
|
|
19.53 miles
|
Amazon: 15455 John Marshall
|
|
19.59 miles
|
Amazon 15465 John Marshall
|
|