DataBank SLC2

14944 S Pony Express Rd - Bluffdale

░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

The site was formerly operated by C7 as "Bluffdale Granite Point I" before the Databank acquisition.

DataBank’s Granite Point East data center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design and 50,000+ sqft of raised-floor space for customer equipment, the facility offers network connectivity to multiple Tier 1 and Tier 2 providers. The facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.

Map and Nearby Locations:

14944 S Pony Express Rd - Bluffdale
Click Map to begin Search

Sites within 15 miles of DataBank SLC2

Show SqM
Distance Site About
0.00 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
0.09 miles DataBank SLC5
0.09 miles DataBank SLC4
0.09 miles DataBank SLC3
0.12 miles DataBank SLC6
0.62 miles Edged Energy: Bluffdale, UT
4.02 miles NSA Utah Data Center
7.61 miles XO: 8871 South Sandy
7.79 miles Aligned SLC-03
7.90 miles Aligned SLC-02
8.09 miles Aligned Salt Lake City
Situated on 60 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 50 MW of critical capacity.
8.54 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
9.49 miles C7 Lindon (Timpanogos)
9.50 miles eBay South Jordan Topaz
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
10.07 miles Novva South Jordan Campus
10.58 miles Flexential Salt Lake (South View)
11.82 miles Flexential Salt Lake (Cottonwood)
12.67 miles Tract: Eagle Mountain, Utah
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
13.78 miles Flexential Salt Lake (Lindon)
14.46 miles Flexential Salt Lake (Mill Creek)
15.83 miles Voonami Orem SLC1
16.00 miles Facebook Eagle Mountain Utah
The Facebook datacenter will be a 970,000 square foot building, located in northern Utah County, at the Sweetwater Industrial Park in Eagle Mountain, Utah.
17.17 miles EdgeConneX Salt Lake
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
17.17 miles Voonami Salt Lake City SLC2
17.17 miles Flexential Salt Lake (Presidents)
17.82 miles Aligned SLC-04
18.54 miles Fibernet ORM1
19.27 miles Lumen Salt Lake 1
19.30 miles Flexential Downtown Salt Lake (Delong)
19.43 miles XMission 51 E 400 S
19.54 miles Flexential Salt Lake (SingleEdge)
19.65 miles Lumen Salt Lake City 4
19.84 miles Flexential Salt Lake (Fair Park)
19.96 miles DataBank SLC1
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points. The site was formerly operated by C7 before the Databank acquisition.

DataBank SLC2 Data Center Photos

Operating Company

In January 2017, Boca Raton-based Digital Bridge Holdings acquired DataBank. DataBank will continue to operate independently

Also in January 2017 DataBank separately acquired C7 Data Centers and C7's four Utah data centers.

68 Facilities Owned
17 Markets Served
328.82 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
slc2-fact-sheet-a April 2019

PDF data sheet