CyrusOne Northern Virginia Sterling I, II, III

21111 Ridgetop Circle Sterling

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Map and Nearby Locations:

21111 Ridgetop Circle Sterling
Click Map to begin Search

Sites within 15 miles of CyrusOne Northern Virginia Sterling I, II, III

Show SqM
Distance Site About
0.04 miles Amazon IAD-69
0.14 miles Cyxtera Sterling DC3
0.17 miles 21110 Ridgetop - Digital Realty
The site is fully leased to triple net tenants.
0.19 miles Cyxtera Sterling DC4
0.21 miles Cyxtera Sterling DC2
0.28 miles COPT: 45761 Maries Rd
0.29 miles EdgeCore: Ashburn, AS01
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
0.32 miles COPT: 45751 Maries Rd
0.34 miles CyrusOne Sterling VIII
0.78 miles EdgeCore Ashburn
1.00 miles Amazon IAD10
1.02 miles CyrusOne Northern Virginia Sterling V
1.10 miles Amazon IAD32
1.12 miles Amazon 45305 Severn
1.13 miles Amazon 45259 Severn
1.40 miles 21641 Charles View
1.49 miles 21710 Charles View
1.53 miles Aligned IAD03
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
1.84 miles Amazon 44854 Interconnection
1.88 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
1.92 miles Amazon 44858 Interconnection Plaza
1.93 miles Equinix DC15
1.98 miles AWS: 20935 Loudoun County Pkwy
1.98 miles PowerHouse ABX1
1.98 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
2.01 miles Vantage VA11
2.04 miles AWS: 20945 Loudoun County Pkwy
2.05 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
2.06 miles Vantage VA13
2.07 miles Amazon 44862 Interconnection Plaza
2.07 miles Evoque Ashburn WDC1
24x7x365 on-site staff
2.10 miles Vantage Ashburn Campus
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
2.13 miles Vantage VA2 Campus
2.15 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
2.16 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
2.16 miles ANEXIO VA1
2.20 miles Sentinel Ashburn
2.21 miles Vantage VA12
2.27 miles PowerHouse Pacific
2.29 miles NTT VA2
2.30 miles Lumen Ashburn
2.30 miles Cologix Ashburn ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
2.31 miles Equinix DC21
2.32 miles Amazon IAD60
2.36 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
2.37 miles Amazon IAD71
2.37 miles 21780 Filigree: Digital Realty
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
2.38 miles Amazon 22370 Kipper
2.38 miles Digital Realty: Broderick Drive
2.39 miles Amazon IAD50
2.40 miles Amazon 22420 Kipper
2.41 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
2.41 miles VPLS IAD
2.43 miles 44490 Chilum Place: Digital Realty
2.45 miles 44520 Hastings (ACC3) Digital Realty
2.45 miles Equinix Ashburn Campus
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
2.46 miles Equinix Ashburn DC11
2.46 miles Equinix Ashburn DC6
2.46 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
2.48 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
2.48 miles ServerCentral Ashburn DC3
2.49 miles 44470 Chillum - Digital Realty
2.51 miles Equinix Ashburn DC1
2.53 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
2.58 miles Equinix Ashburn DC5
2.59 miles AWS: 45950 Pathfinder Plz
2.60 miles Equinix Ashburn DC4
2.61 miles ANEXIO Ashburn IAD4
2.61 miles 44521 Hastings (ACC2) Digital Realty
2.61 miles AWS: 45930 Pathfinder Plz
2.62 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
2.62 miles ANEXIO ACC5
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
2.62 miles 44521 Hastings (ACC4) Digital Realty
2.62 miles Digital Realty: IAD43
2.63 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
2.63 miles Rackspace Ashburn IAD3
2.64 miles Amazon IAD-51
2.65 miles 44751 Round Table (Bldg P)
2.67 miles EdgeCore: Sterling, NV
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
2.70 miles EdgeCore: Ashburn, AS02
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
2.71 miles CloudHQ LC2
2.71 miles 45900 Pathfinder Plz
2.72 miles Amazon IAD-56
2.78 miles Amazon 45111 Loudoun Downs
2.78 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
2.81 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
2.81 miles CloudHQ Ashburn Campus
2.81 miles 21744 Sir Timothy Drive (ACC10)
2.81 miles Amazon IAD-88
2.87 miles 21745 Sir Timothy (ACC9) Digital Realty
2.90 miles Amazon IAD76
2.91 miles CyrusOne Northern Virginia Sterling IV
2.93 miles Cyxtera IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
2.95 miles Cyxtera IAD2-B
2.97 miles Amazon IAD15
2.98 miles AWS: 22900 Platform Plz
3.01 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
3.03 miles Amazon IAD-57
3.03 miles Amazon IAD16
3.04 miles QTS Ashburn Lockridge
3.04 miles NTT Ashburn Campus
3.05 miles Aligned Ashburn
The first building on the Aligned 26-acre campus was launched in September 2019.
3.05 miles AWS: 22868 International Dr
3.08 miles 44274 Round Table (Bldg L)
3.09 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
3.10 miles Amazon IAD-58
3.11 miles Amazon IAD12
3.11 miles NTT VA4
3.12 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
3.12 miles Stack: Northern Virginia NVA04
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
3.12 miles AWS: 22945 International Dr
3.16 miles NTT VA5
3.17 miles 44372 Round Table: Digital Realty
3.19 miles Equinix DC13
3.39 miles Sabey Intergate.Ashburn
Intergate.Ashburn is a purpose-built data center campus on 38 acres
3.40 miles Aligned IAD02
3.48 miles Cyxtera Sterling DC7
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
3.58 miles Sabey Intergate.Ashburn (Building A)
3.63 miles DataBank Ashburn IAD3
3.64 miles FastServ Ashburn
3.65 miles Databank Ashburn IAD1
In December 2020, Databank acquired the site from Zayo.
3.68 miles 44351 Import Plz
3.68 miles QTS Ashburn-Shellhorn DC2
3.78 miles Import Plz, Ashburn
3.79 miles QTS Ashburn-Shellhorn
3.79 miles 44100 Digital Loudoun Plaza (Bldg J)
3.79 miles 44060 Digital Loudoun Plaza (Bldg K)
3.79 miles 43780 Digital Loudoun Plaza (Bldg H)
3.86 miles 43940 Digital Loudoun Plaza (Bldg G)
3.86 miles Amazon IAD-67
3.93 miles 43915 Devin Shafron (Bldg A)
3.97 miles Digital Realty Loudoun Ashburn Campus
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
4.00 miles 43830 Devin Shafron (Bldg F)
4.02 miles 43881 Devin Shafron (Bldg B)
4.05 miles 43790 Devin Shafron (Bldg E)
4.11 miles 43831 Devin Shafron (Bldg C)
4.18 miles 43791 Devin Shafron (Bldg D)
4.18 miles Amazon IAD-54
4.51 miles Lumen Herndon 1
4.53 miles Lumen Herndon 3
4.75 miles Cogent: 510 Huntmar
4.87 miles Equinix DC97
5.10 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
5.29 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
5.81 miles CoreSite Reston VA3
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
5.87 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
5.87 miles CoreSite Reston Campus VA1 VA2
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
6.12 miles Digital Realty Dulles
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
6.16 miles Vantage VA3 Campus
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
6.36 miles InfoRelay Herndon
6.37 miles InfoRelay Reston
6.69 miles Compass Loudoun County
6.76 miles CyrusOne Sterling IX
6.89 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
7.03 miles Google Leesburg Stonewall Park
7.04 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
7.04 miles VPLS DC1
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
7.13 miles ANEXIO Reston
7.13 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
7.18 miles Amazon 13600 EDS Drive
7.46 miles TA Realty: Leesburg
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
7.70 miles Amazon Fadeley I
7.80 miles Amazon Fadeley II
7.83 miles Amazon Fadeley III
8.06 miles Amazon Willard Road (Land)
8.06 miles Amazon 25020 Willard Road
8.21 miles Google Dulles Arcola Center
8.26 miles Amazon 25420 Sutton Bay
8.38 miles Amazon 25410 Sutton Bay
8.40 miles Google: Arcola 2
8.41 miles Amazon 25430 Sutton Bay IAD150
8.54 miles IBM Softlayer Chantilly WDC01
8.58 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
8.60 miles Amazon Prediction Lane
8.60 miles Amazon IAD-63
8.65 miles PowerHouse Arcola
8.68 miles Microsoft Leesburg 1A
8.69 miles Amazon IAD61
8.71 miles Penzance: Chantilly Premier
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
8.94 miles Yondr Arcola, VA
The campus's first building was delivered in late 2023.
8.94 miles Stack: Northern Virginia, NVA06
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
8.96 miles Amazon IAD9
9.09 miles Amazon IAD1
9.10 miles Amazon IAD22
9.11 miles Amazon 41992 John Mosby Highway
9.26 miles Microsoft Aldie
9.27 miles Microsoft IAD11
10.90 miles Penzance: Chantilly, VA
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
11.48 miles Equinix Vienna DC8
12.75 miles Cogent Vienna
12.78 miles 8100 Boone - Digital Realty
13.08 miles DataBank McLean IAD2
13.12 miles Lumen McLean 1
13.23 miles Equinix Vienna DC7
13.27 miles Element Critical VA1
14.10 miles XO Fairfax
16.14 miles AOL: 7777 Infantry Ridge
16.23 miles Equinix Manassas DC14
17.43 miles Amazon 7500 Bethlehem
17.52 miles Amazon IAD7
17.55 miles Amazon IAD24
17.62 miles Amazon IAD11
17.68 miles Amazon IAD-59
17.74 miles Amazon IAD-52
17.81 miles Amazon IAD14
18.00 miles Corscale: Gainesville Crossing
18.05 miles CorScale: Gainesville Building 2
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
18.26 miles Amazon: 8190 Bethlehem
18.34 miles Amazon Bethlehem Technology Park DC18
18.35 miles Amazon Bethlehem Technology Park DC19
18.35 miles Amazon Bethlehem Technology Park DC20
18.41 miles Microsoft: Gainesville, VA
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.49 miles Microsoft : Gainesville 2
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.55 miles Iron Mountain Northern Virginia (Manassas)
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
18.57 miles Iron Mountain: VA-7
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
18.58 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
18.59 miles Iron Mountain VA-2
18.67 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
18.74 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
18.77 miles Opus Interactive Manassas
18.80 miles Amazon IAD-73
18.81 miles Amazon: 5945 Wellington
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
18.81 miles Amazon IAD-74
18.81 miles NTT Gainesville VA Campus
19.04 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
19.11 miles 9020 Freedom Center
19.19 miles 9040 Freedom Center
19.22 miles Amazon IAD-55
19.30 miles Stack: Northern Virginia NVA05
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
19.32 miles Amazon: 15455 John Marshall
19.34 miles Yondr Bristow Campus
19.39 miles Amazon 15465 John Marshall
19.48 miles QTS Manassas DC1
19.60 miles QTS Manassas DC5
19.69 miles XO (4301 Connecticut)
19.74 miles QTS 10680 University Blvd
19.83 miles 8217 Linton Hall (VA4) Digital Realty

CyrusOne Northern Virginia Sterling I, II, III Data Center Photos


aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Source: CyrusOne
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Posted in Northern Virginia

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

CyrusOne Inc, incorporated on July 31, 2012, is an owner, operator and developer of enterprise-class, carrier-neutral, multi-tenant datacenter properties. CyrusOne's data centers are purpose-built facilities.

The CyrusOne National IX Platform (the National IX Platform) delivers interconnection across states and between metro-enabled sites within the CyrusOne footprint and beyond. The platform enables data transfer and accessibility for customers by uniting all of the Company’s data centers. CyrusOne’s portfolio is located in several domestic and international markets. It has domestic properties in Chicago, Dallas, Houston, Phoenix, San Antonio and Cincinnati.

Company History:


July 2010: Cincinnati Bell acquires CyrusOne [r3]
Jan 2013: CyrusOne IPO [r2]
July 2014: Acquired Cervalis [r1]

References:


r1. Businesswire link July 1, 2015
r2. NASDAQ.com link Jan 18, 2013
r3. CyrusOne PR link

68 Facilities Owned
25 Markets Served
917.42 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
cyrusone_ss-sterlingcampus_25sept17 February 2019

Sterling I, II, III Data Sheet (PDF)