CyrusOne Madrid I

Plot 5a

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

6,000 sq m (64,584 sq ft) of world-class technical space in a single two-story building
18 MW of total IT load to the facility
Highly resilient, concurrently maintainable power and cooling to Tier III
Dedicated electrical plant to each data hall of 9 MW
Low PUE through the use of free cooling chillers
900 mm heavy duty raised floor with 3,600 mm clear height in the data hall
Active / Active dual redundant power supplies of 34 MVA to site
Carrier neutrality and diverse fibre connectivity to site
Secure managed delivery bay with 3 tonne goods lift
Multi-layer industry-leading levels of physical and electronic security with 24/7 year-round onsite support

Map and Nearby Locations:

Plot 5a
Click Map to begin Search

Sites within 15 miles of CyrusOne Madrid I

Show SqM
Distance Site About
0.08 miles Equinix MD6
0.11 miles Equinix MD3x
0.66 miles Equinix Madrid MD1
0.69 miles DATA4 Madrid - Alcobendas
1.48 miles Equinix Madrid MD2
1.63 miles Ibercom Madrid
2.45 miles Cogent Madrid
3.47 miles GTT Madrid-Lezama
4.80 miles Produban Mesena 80
5.68 miles BBVA CPD Tres Cantos
6.09 miles Colt Madrid
6.84 miles Hispaweb Miguel Yuste
6.86 miles Interxion MAD4
6.94 miles Interxion MAD2
6.96 miles Interxion MAD1
7.19 miles Nabiax: Julián Camarillo Campus
7.27 miles Microsoft: MAD01
7.27 miles Interxion MAD3
7.58 miles Global Switch Madrid
7.58 miles Verizon Nap of Madrid
7.58 miles Level3 Madrid
7.81 miles IPCore Madrid
10.07 miles Iron Mountain MAD-1
Iron Mountain acquired the campus from XData Properties in November 2022.
11.21 miles inAsset NixMad
12.30 miles NTT Madrid 1
16.83 miles Nabiax: Alcalá de Henares
16.99 miles Adam MAD Alcala

CyrusOne Madrid I Data Center Photos

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Operating Company

CyrusOne Inc, incorporated on July 31, 2012, is an owner, operator and developer of enterprise-class, carrier-neutral, multi-tenant datacenter properties. CyrusOne's data centers are purpose-built facilities.

The CyrusOne National IX Platform (the National IX Platform) delivers interconnection across states and between metro-enabled sites within the CyrusOne footprint and beyond. The platform enables data transfer and accessibility for customers by uniting all of the Company’s data centers. CyrusOne’s portfolio is located in several domestic and international markets. It has domestic properties in Chicago, Dallas, Houston, Phoenix, San Antonio and Cincinnati.

Company History:


July 2010: Cincinnati Bell acquires CyrusOne [r3]
Jan 2013: CyrusOne IPO [r2]
July 2014: Acquired Cervalis [r1]

References:


r1. Businesswire link July 1, 2015
r2. NASDAQ.com link Jan 18, 2013
r3. CyrusOne PR link

70 Facilities Owned
27 Markets Served
933.42 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
madrid-l_2aug21_v3 October 2021

Madrid I Data Sheet (PDF)