0.18 miles
|
Tierpoint Dallas-Allen
|
|
0.18 miles
|
Compass Allen I
|
|
0.31 miles
|
Cisco Allen
|
|
3.42 miles
|
Evoque Allen DA1
|
The single-story Evoque data center in Allen is part of Millennium high technology park in Allen, TX.
|
8.94 miles
|
Global IP Networks - Plano
|
|
8.94 miles
|
Colo@ Dallas
|
|
9.08 miles
|
Flexential Dallas (Plano)
|
|
9.09 miles
|
Aligned: DFW-02
|
Aligned DFW-02 is the second building of Aligned's Plano Data center campus. DFW-02 is part of a 19-acre campus offering 36 megawatts of critical capacity across 220,000 sq. ft.
|
9.10 miles
|
Evocative: Dallas DAL1
|
Evocative's Plano, TX data center is strategically located between its West Coast and Northern Virginia facilities.
|
9.10 miles
|
Aligned Plano
|
Aligned's DFW-01 data center is located on a 19-acre campus at 2800 Summit Avenue in Plano. The facility offers 375000 gross square feet of space and 60 megawatts of power.
|
9.10 miles
|
VPLS Plano DA1
|
|
9.43 miles
|
Ascent Dallas DAL1
|
|
9.61 miles
|
DataBank Plano DFW3
|
DataBank’s newest Uptime Certified TIER III Data Center, and the third in the Dallas area
|
9.68 miles
|
Mapletree: 3300 Essex
|
|
9.68 miles
|
Stream DFW IV
|
|
9.76 miles
|
Cisco Richardson TXDC1
|
|
10.07 miles
|
STACK DFW01B
|
STACK’s DFW01B data center boasts a substantial footprint of 156000 square feet area. This facility offers up to 11MW of critical capacity, with 2.2MW immediately available.
|
10.19 miles
|
STACK Dallas-Fort Worth DFW01
|
There are three data centers on the campus:
#1 is a 317,800 sqft data center with 21 MW of critical power
#2 up to 11 MW
#3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.
|
10.19 miles
|
Equinix Dallas DA7
|
Equinix invested more than $20 million for the DA7 IBX data center, which currently includes 1,200 cabinets
|
10.23 miles
|
Stack: DFW01 Future Expansion
|
STACK Infrastructure's DFW01 Future Expansion offers a build-to-suit expansion opportunity with 50MW of accessible power, adjacent to DFW01A and DFW01B data centers.
|
10.24 miles
|
NTT 2300 W Plano
|
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
|
10.36 miles
|
Skybox Legacy
|
The Skybox campus can be expanded to 350,000 square foot capacity to host servers and provide 60 megawatts of power in later phases.
|
10.41 miles
|
EdgeCore Dallas
|
|
10.59 miles
|
Lincoln Rackhouse: 1000 Coit
|
|
10.66 miles
|
Internap Dallas: 1221 Coit
|
Data center was built in 2011
|
10.68 miles
|
Mapletree: 1221 Coit
|
|
10.68 miles
|
Evocative: Dallas DAL6
|
Evocative's DAL6 data center facility, located at 1221 Coit Road, Plano, Texas, was constructed in 2011. Spanning an impressive 111,000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
10.68 miles
|
CoreWeave Plano
|
|
10.83 miles
|
Stream DFW VII
|
Stream Data Centers has acquired 23 acres for construction of a new Dallas-area campus development in Garland, Texas. When completed in late 2018, the newly-constructed DFW VII facility will offer an expandable 140,000 square foot data center with redundant 40 MW utility feeds from an on-site substation provided by Oncor. Ultimately the campus will total approximately 400,000 square feet.
|
10.91 miles
|
NTT: TX3
|
|
10.91 miles
|
NTT Dallas TX1
|
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
|
10.93 miles
|
NTT TX2
|
|
11.29 miles
|
Digital Garland
|
|
11.55 miles
|
Digital Realty: 1505 Ferris
|
|
11.59 miles
|
Flexential Dallas (Synergy Park)
|
|
12.18 miles
|
AT&T Switching Station (Richardson)
|
A fire in October 2018 at this AT&T switching site caused a widespread outage of AT&T Internet and U-Verse TV services across North Texas.
|
12.32 miles
|
950 E. Collins Blvd: DRT
|
|
12.36 miles
|
850 E. Collins Blvd: DRT
|
|
12.36 miles
|
DataBank North Dallas DFW2
|
The facility is located in Northern Dallas in the Technology Business Corridor
|
12.41 miles
|
900 Quality Way: DRT
|
This facility is a part of Digital Dallas Campus in Richardson
|
12.45 miles
|
1232 Alma Road: DRT
|
|
12.45 miles
|
Digital Dallas Campus in Richardson - Digital Realty
|
|
12.45 miles
|
Equinix Dallas DA10
|
The site was previously was a Terremark NAP of Dallas
|
12.45 miles
|
907 Security Row: DRT
|
|
12.47 miles
|
1210 Integrity Drive: DRT
|
This facility is a part of Digital Dallas Campus in Richardson
|
12.50 miles
|
365 Richardson, TX
|
|
12.54 miles
|
Rackspace Richardson DFW3
|
|
13.04 miles
|
900 N Dorothy
|
|
13.14 miles
|
Verizon Dallas (Richardson)
|
|
13.48 miles
|
4025 Midway - Digital Realty
|
The Digital Realty 100,000sqft data center was built in 2000, renovated in 2008. The site is located near the George Bush Turnpike and North Dallas Tollway and provides an ideal data center location. VAZATA is the largest tenant.
|
13.48 miles
|
VAZATA Dallas (DAL I & III)
|
The VAZATA site was previously known as: Horizon Dallas (DAL I)
|
15.76 miles
|
2440 Marsh - Digital Realty
|
the 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.
|
16.23 miles
|
VAZATA Horizon Dallas (DAL II)
|
|
16.57 miles
|
H5 Colo
|
|
16.71 miles
|
neGma Dallas
|
|
16.84 miles
|
DataBank DFW7 LBJ
|
|
17.27 miles
|
4849 Alpha - Digital Realty
|
|
18.71 miles
|
CyrusOne Carrollton
|
60,000 SqFt of Office Space
Power Density: 150–200+ watts/SqFt
|
19.95 miles
|
Evoque Webb Chapel DA2
|
|